-
The opening of natural gas requires that the kitchen must be equipped with a door, otherwise it will not be ventilated, which is of course unreasonable, and is a concentrated reflection of the inaction of the gas company and the formalism of the gas company.
It is also the concentrated embodiment of the gas company's shirking of responsibility! In reality, there are many people who are accustomed to opening the kitchen door or even opening the kitchen door when cooking, and the gas company can't send people to keep an eye on it. Since the regulations cannot be opened, many owners are buying and installing gas alarms.
Later, it can be opened again. If the gas alarm is purchased from the gas company, the gas company has more channels to increase revenue; If you buy it separately, you can put the blame on the gas alarm after an accident. The rule that the kitchen must be equipped with a door is also a non-existent one, and similar to the gas meter.
The regulations that cannot be put into the cabinet, in practice, the installer opens the cabinet door to take pictures.
From the perspective of gas supply safety, the gas company has obligations and responsibilities to ensure the safety of gas pipelines, and there can be no leakage in the pipes, valves, and joints before the gas meter. The safety of the pipeline after the gas meter is required.
The owner is responsible for himself, but the user needs to be informed of the specific method of use, testing method, and maintenance method. That is to say, the gas pipeline cannot leak gas in any case, and if the gas leak occurs, there will be a huge shock wave.
How can a kitchen door block it? I'm afraid that it will blow up and burst the kitchen door directly. The shock wave was wrapped in shards of glass, which was even more lethal.
-
One is to ventilate, and the other is to install the door seal. Contradiction.
-
So what to do, is it only admitted, my home has just been renovated, and it turns out that it can't be opened, and now it's on fire.
-
Legal analysis: 1. Natural gas pipelines and gas meters have been installed at home, and they need to be opened for use.
2. Bring your ID card and real estate certificate (real estate certificate or house purchase agreement or household registration book) to the business hall of the center to sign a gas supply agreement, and collect a gas accident insurance premium of 10 yuan per year.
3. The stove is opened, and the door-to-door opening will be contacted within 24 hours from the date of acceptance. If you need to connect the air pipe of the water heater, contact the door-to-door to take over the opening within 7 natural days from the date of acceptance.
4. After the maintenance staff is opened, a gas card (card meter) will be issued, and 50 cubic meters of gas have been pre-stored in the card. Users need to bring 3 No. 5 batteries and a copy of the owner's ID card, gas fee (50 square gas fee), the material fee for opening and using is charged according to the actual consumables, and the door-to-door service fee is charged according to the standard approved by the Municipal Price Bureau.
Legal basis: Regulations on the Administration of Urban Gas
Article 2 These Regulations shall apply to urban gas development planning and emergency support, gas operation and service, gas use, gas facility protection, gas safety accident prevention and treatment and related management activities。 These Regulations do not apply to the production and import of natural gas and liquefied petroleum gas, the pipeline transportation of natural gas outside the city gate station, the use of gas as a raw material for industrial production, and the production and use of biogas and straw gas. The term "gas" as used in these Regulations refers to gaseous fuels that are used as fuels and meet certain requirements, including natural gas (including coalbed methane), liquefied petroleum gas and artificial gas.
Article 3 The gas work shall adhere to the principles of overall planning, ensuring safety, ensuring safety, standardizing services, and saving energy and high efficiency.
-
Natural gas account opening:
1. A qualified natural gas stove has been purchased, and the stove is placed in the home of the head of the household (please bring your own stove battery).
2. The cooktop has been installed, and the cooktop cannot use flammable materials, and the cooktop hole has been laid by the cooktop installer. 2. Required documents.
3. Original documents for natural gas access fees; ID card of the head of household (consistent with the name on the payment slip for network access fee); Natural gas cooker certificate or manual. The installation unit must have qualified installation qualifications, and send personnel with installation qualification certificates for installation, and after the installation is completed, the user is required to issue a "certificate of installation acceptance". It is recommended to consult the local gas company in detail, as the requirements of the local gas company are different.
The natural gas cooker and water heater bought online are responsible for timely after-sales maintenance. Due to the dispersion of rural natural gas users, the complete supporting department of the pipeline network, and the long gas supply pipeline before the installation meter, the installation cost is high. In accordance with the approval of the price department on the installation fee of rural natural gas installation, the rural natural gas installation fee shall be determined by the enterprise and the user through negotiation, and shall be implemented after reporting to the price department for the record.
Legal basis: Regulations on the Administration of Urban Gas Article 27 Gas users shall abide by the rules of safe gas use, use qualified gas burning appliances and cylinders, promptly replace gas burning appliances and connecting pipes that have been eliminated by the state or whose service life has expired, and pay gas fees within the agreed period. Unit gas users shall also establish and improve the safety management system, and strengthen the training of gas safety knowledge and operation skills of operation and maintenance personnel.
-
1. Real estate certificate.
Prepare the title deed (the purchase contract and invoice are also acceptable), and the ID card of the head of the household. If you are looking for someone to do it, you need the agent's ID card and bank deduction fee. Specifically, you can consult your local gas company.
2. Valid certificates.
Including personal household registration book, real estate certificate, personal valid ID card, etc.
3. Installation costs.
Several. Depending on the local consumption level and the installation of the device**.
4. Have installation conditions.
Purchase qualified natural gas cookers on your own; And the stove is placed in the home of the head of the household (please bring your own stove battery), the stove has been installed, and the stove can not use flammable materials, and the stove hole has been laid by the stove installer.
5. Wait for the installation to complete.
The original natural gas access fee receipt, the ID card of the head of the household (the same name as the name of the network access fee payment document), the natural gas cooker certificate or manual, and the registration and installation parts are fully equipped, bring the required documents to the natural gas comprehensive service hall to go through the account opening procedures. After registration, the gas company will arrange the installation of engineering personnel, and the experience can be used only after passing the experience.
-
For the construction of new areas and the transformation of old areas, gas facilities shall be built or land for the construction of gas facilities shall be reserved in accordance with urban and rural planning and gas development planning.
Legal basis: Article 11 of the Regulations on the Administration of Urban Gas shall be carried out in the construction of new areas and the transformation of old areas, and gas facilities shall be constructed or land for the construction of gas facilities shall be reserved in accordance with urban and rural planning and gas development planning. For gas facility construction projects within the scope of the gas development plan, the competent department of urban and rural planning shall solicit the opinions of the gas management department on whether the construction of gas facilities is in line with the gas development plan when issuing the site selection opinion in accordance with the law; If it is not necessary to issue a site selection opinion, the competent department of urban and rural planning shall solicit the opinions of the gas management department on whether the construction of gas facilities is in line with the gas development plan when issuing the planning permit for construction land or rural construction planning permit in accordance with the law. After the completion of the gas facility construction project, the construction unit shall organize the completion acceptance in accordance with the law, and within 15 days from the date of completion acceptance, the completion acceptance shall be reported to the gas management department for the record.
1. Materials are required.
It is best to prepare the materials required for opening an account in advance for natural gas account opening procedures. To open a natural gas account, the applicant needs to provide his or her own ID card. >>>More
Legal analysis: 1. A qualified natural gas stove has been purchased, and the stove is placed in the home of the head of the household (please bring your own stove battery). >>>More
Legal analysis: To apply for a gas card, you need to bring the following things: >>>More
That is, the pressure of natural gas transported by the external trunk pipeline is very high, about dozens of kilograms, and the natural gas pressure used at home needs to be relatively low, about 3kpa, so an intermediate device is needed to adjust the natural gas pressure of the pipeline for civil use. These devices are placed in the house and are called pressure regulating stations.
How to pay for natural gas online:
1.Open Alipay and click "Living Payment". >>>More