First, the rough house inspection and closing steps:
1) Relevant documents and contract materials must be brought completely.
2) The tools for inspecting the house should be ready, such as screwdrivers, meter rulers, small hammers, etc., and don't forget to write down the situation found during the house inspection.
3) First of all, check whether the wall is flat, whether there is cracks and water seepage. Knock on the wall with a small hammer or something to see if there is a hollowing phenomenon.
4) Secondly, check whether the ground is flat and whether there are cracks.
5) Then check whether the doors and windows are in good condition, whether they are loose, whether the design will affect daily life, etc.
6) Check whether the top surface is square and whether there is a relatively large skew.
7) Check whether the position of the meter, switch, switch and socket is reasonable, whether it can be used normally, whether the meter count is normal, and whether the grounding measures of the switch are safe.
8) Finally, check whether the water supply, drainage, water meter, faucet and the main control valves have been installed, whether the water flow and water pressure are normal, and whether there is water leakage, seepage and dripping at the faucet joint. Do a water test check, and after 24 hours, go downstairs to check if there is any water leakage.
Second, after the completion of the indoor acceptance of the rough house inspection and collection steps, the outdoor environment and supporting facilities should also be paid attention to. The greenery downstairs has not been completed. Whether the building is tilted or sunken, whether the wall tiles are firm, and whether the use of unit door access control facilities is normal.
Whether there are potential safety hazards in public equipment such as stairs, fire protection, water and electricity meter rooms.
-
The most complete guide to rough house inspection, master these 8 places to rest assured, developers are afraid of you!
-
The rough house inspection mainly accepts the following items:
1. Building structure:
1.The quality of the building, such as foundations, walls, stairs, beams, columns, halls, floors, stairwells, etc.
2.The form of the building, such as beams, columns, walls, stairs, etc., dimensions, deviations, seismic resistance, etc.
3.The integrity of the building, such as wall bridges, wall perforations, foundation drainage and drainage pipes, etc.
4.The roof of the building, such as roof waterproofing measures, roof covering materials, etc.
2. Interior decoration of the building:
1.The location of water supply and drainage pipelines, the quality of installation, the connection watertightness, etc.
2.The decoration quality of the internal wall and floor, such as the flatness of the wall, the thickness of the mortar on the side of the key, the moisture-proof measures, etc.
3.The location, size, lock and sealing of indoor doors and windows, etc.
4.The location of indoor electrical installation, installation quality, safety protection measures, etc.
3. Decoration:
1.Wallpaper, carpets, tiles and other decoration quality.
2.Installation location and quality of lamps, switches, sockets, etc.
3.Ceiling, waist protection, partition and other decoration quality.
-
The rough house is the foundation of decoration, if the foundation quality is not good, it will affect the quality of house decoration. Therefore, before the delivery of the blank house, we must do a good job of acceptance. So how to inspect the rough house? Check it out now.
1. Check the structure of the house.
The first task is to check the structure of the house, which must be treated with caution to avoid unnecessary troubles caused by later decoration. Check whether the floor is flat, check if there are any cracks between the room and the balcony, and if so, respond to the developer in time, because the cracks prove that the balcony has a problem with the bearing capacity and may be at risk of falling. Check whether there are uneven roofs, and if they are out of range, they should also be recorded and reacted to by the developer.
2. Inspection and erection of doors and windows.
The structure of doors and windows is closely related to indoor ventilation, lighting, safety, etc., and the quality of doors and windows is poor, and there is a risk of water leakage in heavy rain. First of all, check whether the doors and windows are smooth, whether they are flat and bright to the touch, whether there are scratches, whether the metal fittings are thorough, whether the position is strong, etc.
Secondly, test the sealing quality of the lower doors and windows, and see whether there are no obvious gaps between the sash and the frame, the sash and the sash when the doors and windows are closed, and whether the sealing strip is not loose, falling, or exposed. Finally, check whether the glass is damaged, whether there is dust and water vapor in the double-glass interlayer, and whether the separator is uniform.
3. Check the condition of the wall.
Some residential walls will have the risk of wall cracking, hollowing, tile falling, and water seepage in the later stage. In this case, you can try it with a small hammer on the wall, if there is a knocking sound, it proves that it is a hollow drum phenomenon. Then check whether the wall is straight with the help of a professional ruler.
4. Waterproofing.
Before doing the waterproof test, first use cement mortar to make a temporary threshold at the door of the bathroom, and then block the sewage outlet with a plastic bag, and start to discharge water, about 2cm high; Ask the owner downstairs to check the ceiling of the bathroom for leaks after 24 hours.
5. Check the circuit.
When inspecting the blank room, the circuit should be checked, the opening should be closed first, and the opening can be checked to see if the branch lines can be controlled, and then the multimeter should be used to measure whether the strong and weak circuits in the house are unblocked.
-
Point 1: Take a closer look at the quality of the house.
The quality of the house is particularly important, and when checking the quality of the house, you need to pay special attention to the following points:
1. Use a ruler or wooden board to measure whether the ground is flat, if it is not flat, there will be trouble when laying the floor in the future;
2. Check the walls of the house and the Yangpei debate platform.
Whether there is a crack in the joint. If the crack in the wall is not large, it may be that the wall paint is not painted well;
If there is a crack in the connection between the balcony and the interior, it may be that the bearing capacity of the balcony is problematic, and there will be a danger of falling, so you need to be vigilant!
3. Measure whether there is a height deviation problem on the roof, and if so, pay attention to whether the deviation value is within the normal range.
Point 2: Check the condition of the wall.
1. The more common problem of the blank house is the hollow drum on the wall, the hollow drum on the wall can be knocked out with a small hammer, if there is a knocking sound, there is a hollow drum phenomenon. If there is a hollowing phenomenon and is not treated, the topcoat will fall off.
2. You can use a professional measuring ruler to measure whether the wall is vertical, if the error is within the allowable range, it can be said that the wall is vertical.
3. Check whether the wall is damaged, such as lime bursting points, pockmarked spots, etc., which will bring a lot of adverse effects to the decoration.
Point 3: Door and window inspection.
If the structure of the doors and windows.
If it is not good, and at the same time, the sealing of Shibi is poor, which will not only cause water leakage and water ingress, but also directly affect the sound insulation effect of the house.
1. Check whether it can be locked and whether it can be opened flexibly;
2. Use a professional measuring instrument to determine whether the door is correct by checking the diagonal value of the door frame;
3. Whether the frame groove of the moving door is in good condition.
Point 4: Hydropower inspection.
Before renovating, be sure to check the infrastructure of water and electricity, which can be said to be the meridian of the whole house, if it is not smooth, it will bring a lot of inconvenience to future life.
1. Pay attention to whether the sewer pipe is smooth and free of blockage, and you can judge it by the speed of water flow and the sound of water flow.
2. Check the strong and weak electricity in the room to see if it is normal and usable.
3. In order to ensure the safety of electricity in the future, it is necessary to test the insulation resistance value of the indoor wire, as long as it is sure that there is no problem.
The rough house inspection mainly focuses on the quality of the house itself, including whether the water and electricity are normal. Under normal circumstances, if there is a major quality problem of the house, such as cracking the wall, can the house be directly refused?
-
Acceptance of the house is actually a relatively troublesome thing, because there are too many details to pay attention to, such as the walls and floors of the house, water and electricity, etc., these are the details to pay attention to, many friends are buying a house for the first time, and it is also the first time to accept the house, so I don't know how to inspect the house, so what to inspect the house? Is it necessary to inspect a rough house? Acceptance of the house is actually a relatively troublesome thing, because there are too many details to pay attention to, such as the walls and floors of the house, water and electricity, etc., these are the details to pay attention to, many friends are buying a house for the first time, and it is also the first time to accept the house, so I don't know how to inspect the house, so what to inspect the house?
Is it necessary to inspect a rough house? Let's take a look at the relevant knowledge and process of home inspection.
What is a home inspection?
1. Inspect the wall.
If the renovation of the walls is not done well, it will be worrying in the event of a typhoon. Because the rainwater outside will always seep into the house, bringing certain safety hazards. Therefore, the owner can visit the house before it is handed over and the day after the heavy rain.
2. Check the waterproofing of the kitchen and bathroom.
The waterproofing of the kitchen and bathroom must be done well. The acceptance method is to use cement mortar and other things to block the door of the kitchen and bathroom, seal the drainage outlet tightly, and then put about 2cm of water on the kitchen and bathroom floor. Discuss with the landlord downstairs and check whether there is any water seepage in the ceiling of your kitchen and bathroom after 24.
3. Inspect the pipeline.
Household plumbing is generally a drainage or sewage pipe. At the time of acceptance, water can be poured into the drain to observe whether the water can flow smoothly. In addition, it is also necessary to see whether the sewage pipe has a water storage and anti-odor elbow.
4. Test the horizon.
The ground level test measures the horizontal error between the indoor ground farthest from the doorway and the ground inside the doorway. Generally speaking, a difference in the ground level of 2 to 3 centimeters is an acceptable range, and once it is beyond this range, it is necessary to communicate with the person in charge of the construction team.
Is it necessary to inspect a rough house?
It is also necessary to inspect the rough house, because during the construction process, the workers may not deal with some places in place, such as hollowing and cracking of the wall, and the sewer pipe is blocked, and the doors and windows of the house are damaged and scratched. At this time, it is necessary to ask the house inspection company to help check these problems, and it will be more timely to raise them with the property when receiving the house, so as not to wait for the construction party to evacuate and then rectify it will be time-consuming, laborious and costly.
The acceptance of the house suggests that you can learn more about some relevant knowledge, consult with a professional before the house inspection, to ensure that your house can be delivered smoothly, the above is about the house inspection what and the rough house is necessary to inspect the relevant introduction, in the house inspection of this matter, we must pay attention to the relevant acceptance process.
-
How to inspect the rough house? What are the precautions for rough house inspection? These 9 points need special attention.
-
Special attention should be paid to the following during home inspection:1Check the wall, see if the wall is cracked, use a ruler to close the wall to check the flatness, the gap is reasonable within centimeters, hit the wall with a hollow drum hammer, and the hollow drum in a room can not exceed two places.
-
1).Check the wall and hit the wall with your hand to determine whether the wall is hollow;
2).Check the roof, take four or five points on the ground, measure the height of the house with a tape measure, and check whether the roof is flat;
3).Inspect the pipeline, check whether the pipe installation is firm, and whether the drainage is smooth;
4).Check the kitchen flue, put the smoking paper under the flue mouth, and see if the smoke rises to the flue mouth and is immediately sucked away;
5).Check the pipeline gas, check whether the device is sensitive, and check whether the intake solenoid valve is convenient to use;
6) Whether the exterior finish of the balcony and rain cover is completed according to the design documents;
7) Check the waterproof layer and protective layer of the room floor with waterproof requirements, and carry out water storage and water spraying tests;
8) Check the window: Shake the window gently to see if the interface is firm;
9) Check the installation of the door: see if there are hammer marks and scratches on the surface of the door; The door leaf cannot be opened;The installation of the door sleeve lining plate should be horizontal and vertical; Whether the hinge opens freely, whether there is abnormal noise, etc.
-
1. Entrance door.
First of all, check whether the opening and closing of the entrance door is flexible and whether there is any abnormal noise; Check the surface for bumps and scratches; Whether the joints of the door frame, door opening, and wall are tight and neat.
2. Floor height. When measuring the height of the floor, don't ignore the thickness of the floor slab, otherwise there will be an error. The "Commercial Housing Sales Contract" restricts the floor height of the house, and many buyers measure the indoor net height when handing over and accepting, and the floor thickness of the commercial house is 12cm and 15cm.
3. Windows. Check that the windows are flexible when opening and closing, and that the handles are loose. Whether the interface between the window and the window frame is tight, give it to you a small method, take a piece of A4 paper when checking, clamp the paper inside and close it to see if the paper can be pulled out, and it proves that the seal is not good. Whether the glass and window frames are scratched or damaged, this can be seen with the naked eye.
4. a wall. To check whether there are cracks in the wall, there will be cracks at the joints of non-load-bearing walls and load-bearing walls, which is very common; Check the flatness of the wall to see if it is bulging or falling off. Also look at the top to see if there are leaking water stains, and find that this kind of problem may be caused by leaking water pipes or heating pipes in the upstairs residents.
If the developer has painted the wall for the owner when the rough house is delivered, you can pour a small amount of water on the wall with mineral water to test its quality, and rub it with your fingers after a few minutes, if the wall is spent, it means that the quality of the plaster is not very good.
What are the precautions for rough house inspection?
1. Go through the handover procedures for the new house according to the time notified by the developer.
If the new house has met the delivery conditions agreed in the contract, the developer shall notify the seller in writing to go through the handover procedures before the date of delivery of the new house determined in the contract.
2. The developer shall be required to present relevant supporting documents when handling the handover.
The current model text of the "Contract for the Sale and Purchase of Commodity Housing" stipulates that the following conditions must usually be met when the commercial housing is delivered: the "Construction Project Planning and Acceptance Certificate" and the "Housing Construction Project Completion Acceptance Record Certificate" for the new house have been obtained; The "Housing Surveying and Mapping Results" for the registration of housing ownership for new houses have been obtained. When the buyer carries out the handover of the new house, he can ask the developer to present the supporting documents agreed in the new house sales contract.
3. Timely written reminder to the developer to deliver the new house.
The law stipulates that if the developer delays the delivery of the new house, the buyer must first give a reminder to terminate the contract for the sale and purchase of the new house, and if the developer still does not deliver the new house after three months after the reminder, he can move out. Therefore, if the developer of the new house refuses to present the corresponding supporting documents when handling the handover, the buyer should promptly urge the developer in writing to deliver the new house.
1).Check the wall and hit the wall with your hand to determine whether the wall is hollow; >>>More
Point 1: It is particularly important to carefully check the quality of the house, and when checking the quality of the house, you need to pay special attention to the following points: use a ruler or wooden board to measure whether the ground is flat, if it is not flat, there will be trouble when laying the floor in the future; Check the walls of the house and the connections to the balcony for cracks. >>>More
Inspect the house. The work of a home inspector, called "home inspector" in Western countries, has a history of more than half a century.
Precautions for rough house inspection are:
1) Pay attention to see if the documents are complete: >>>More
Rough house delivery standards: walls, ceilings, indoor doors and windows, various pipelines, water, electricity. Rough room inspection standards: ceiling, wall, floor, balcony, kitchen, bathroom.