Novice Xiaobai, I want to ask what I need to see in the inspection of the rough house?

Updated on home 2024-07-28
5 answers
  1. Anonymous users2024-02-13

    When we inspect the rough room, we go to check all the sockets in each room to see if all the sockets can be charged. It is also recommended that you check whether the wall and floor are relatively flat? If it is not smooth enough, there will be many problems when the subsequent decoration will be carried out.

    The second is to be sure to knock it with a stick, and look at the walls of every room, the phenomenon of hollowing drums. If there are more than two empty valleys of the monument, it is a substandard house, and you must find the person in charge to solve this problem. <>

    You must also check whether there is any water seepage in the house? The best way to check is to use a flashlight to shine on the corners of the house at night to see if there is any water seepage on the corners and edges of the walls. It is also very important to check the waterway, you can put the water in the bathroom and kitchen to see if the water is smooth.

    Finally, we can choose to close all the doors and windows tightly, and then use a paper pad on the ground to see if the paper has been blown away. In addition, the inspection of the window is also very important, if the paper pad on the window, if it can only be easily removed, then it proves that the window is not particularly tight. <>

    If you don't know how to check, you can find a professional to help you check, because there are too many inspection items in the house, and some omissions will affect finding professional personnel to help you check when you live in the future, and you can also avoid some problems in the future. And once we take over the house, there are a lot of businesses that turn their faces and don't recognize people.

    If you pay attention to these things clearly, it can effectively help you avoid a lot of pitfalls, and it will also improve your sense of happiness when you live in the future. Things like water and electricity should never be ignored, otherwise problems will arise in the future.

  2. Anonymous users2024-02-12

    When inspecting the house, you must observe carefully, and then you should also check whether the windows and doors are tight, whether the adhesive strips are tight, whether the sealing is qualified, the sound insulation of the room, the laying of water and electricity lines, whether there are cracks in the wall, and whether there is water leakage and seepage in the kitchen and bathroom.

  3. Anonymous users2024-02-11

    You need to go to the material market to see the materials, look at some home decoration categories, choose your favorite decoration style, understand the area of the house, plan the functional area, and go to buy furniture in advance, but also go to a well-known decoration company to see their design, and go to the surrounding friends' homes to see their decoration.

  4. Anonymous users2024-02-10

    The point that needs to be seen is the quality of the rough house, the structure of the rough house, the decoration process of the rough house, the steel structure of the rough house, and the load-bearing wall of the rough house.

  5. Anonymous users2024-02-09

    When you want to buy a house, you need to consider whether to buy a rough house or a hardcover house. When you choose to buy well, you will face the difficulty of inspecting the house, if the work is done well, then the worries will be reduced by more than half!This time, we are going to teach new buyers how to accept yuqiancyh (especially in terms of walls and floors) for rough houses.

    What are the criteria for a home inspection?

    1. All the exterior finishes of the rough room, including the exterior finishes of the balcony and rain cover, should be completed according to the design documents.

    2. The common parts of the blank house, public facilities, various pipes (supply, drainage, rainwater, heating, heat), electrical equipment (distribution boxes, cabinets, panels, sockets, switches, lamps), etc., should be completed according to the design documents, and the test items should be completed according to the regulations.

    3. The various pipes of the blank room should go through the acceptance work such as water passing, pressure test, ball test and heating thermal commissioning.

    4. The roofing project of the rough house has completed the water storage and water spraying tests.

    5. If the prefabricated floor slab or cast-in-place slab roof is used in each room within the door of the rough house, it should be leveled without plastering and putty, so as to achieve dense slab joints, no cracks, smooth and smooth rubbing, smooth surface, basic uniform color, and straight line anglesThe concrete of the base floor of each room within the door should be smooth and compacted to achieve firm bonding and no cracks.

    About the quality acceptance of the wall and the ground:

    The quality of the house is very important, and we focus on the following 5 aspects when checking the quality of the house:

    1. The flatness of the ground, you can use a ruler or a wooden board to measure whether the ground is flat, and the uneven ground will affect the flatness of the floor.

    2. Check whether there are cracks in the wall and roof, the connection between the light wall and the load-bearing wall is the most prone to cracks, which should be carefully observed and paid attention to in the later decoration.

    3. Is there any need to shovel the wall skin? Now developers also like to paint a layer of putty on the rough house, but this putty layer is not necessarily strong. There is a simple way to check, use the key to scratch the wall, if the strength is not large and the powder falls, it means that the base layer is not well handled, and the putty has low glue, and it must be removed.

    4. Check the height deviation and wall verticality between the various functions of the house, and there are professional tools to measure it. If it is not within the error range, it should be noted in time.

    5. The problem of hollowing the wall. It can be checked with a small hammer, and if there is a knocking sound, it means that there is a hollow drum. Hollowing can cause the wall paint to peel off, etc.

Related questions
7 answers2024-07-28

Point 1: It is particularly important to carefully check the quality of the house, and when checking the quality of the house, you need to pay special attention to the following points: use a ruler or wooden board to measure whether the ground is flat, if it is not flat, there will be trouble when laying the floor in the future; Check the walls of the house and the connections to the balcony for cracks. >>>More

8 answers2024-07-28

Precautions for rough house inspection are:

1) Pay attention to see if the documents are complete: >>>More

7 answers2024-07-28

Rough house delivery standards: walls, ceilings, indoor doors and windows, various pipelines, water, electricity. Rough room inspection standards: ceiling, wall, floor, balcony, kitchen, bathroom.

15 answers2024-07-28

For the simple decoration of the 105 square meter rough house, the cost and time required will vary according to the market price and decoration requirements in different regions. The following is a rough reference range. >>>More

9 answers2024-07-28

Attention should be paid to the warmth of the kitten, to avoid the cat cold, in the feeding, should pay attention to rice porridge, or other things that are easier to digest, appropriate feeding the cat some water, so as to effectively promote the kitten's gastrointestinal peristalsis.