Rough house delivery standards: walls, ceilings, indoor doors and windows, various pipelines, water, electricity. Rough room inspection standards: ceiling, wall, floor, balcony, kitchen, bathroom.
-
Smooth and without misalignment, the surface is smooth, the color is basically uniform, and the line angle is straight. No leakage Check whether there are water stains on the ground, wall, and top surface; Look at the brand and anti-theft level of the entrance door, which should be the same as agreed in the contract.
-
It is necessary to ensure the completion of the exterior finish, to ensure the configuration of public equipment in public areas, but also to ensure that water is connected, and to ensure the experimentation of housing engineering projects. Make sure it's waterproof. The acceptance criteria are:
All the decoration has been completed, and the walls have been smoothed, and the various pipes of the rough room have been accepted, and they are planned in strict accordance with the building requirements of the waterproof layer, and various measurement projects can be completed with gas.
-
Rough house, generally only the door frame in the house, the degree of decoration belongs to the initial decoration, therefore, it is also called "rough house", and in some places it is also called "clear water house". The purchase of a rough house also needs to be delivered, what is the delivery standard of the rough house? What is the national standard for the delivery of rough houses?
This article will focus on this.
Most rough houses only have door frames and no doors, and the walls and floors are only done with basic treatment, and the exterior finishes of balconies and rain covers should be completed in accordance with the design documents.
The state has defined the delivery standard of the rough house accordingly, what is the delivery standard? As follows:
1.All the exterior finishes of the rough house, which covers the exterior finishes of the balcony and rain cover, should be completed according to the design documents.
2.Some parts of the blank house, for example, common parts, public facilities, various pipes (feeding, drainage, rainwater, heating, heat), electrical equipment (distribution boxes, cabinets, panels, sockets, switches, lamps, etc.), these parts should be standardized by the design documents, and complete the decoration, in addition, all kinds of testing work should be completed according to the regulations.
3.All kinds of pipes in the blank room should have the acceptance of water flow, pressure test, ball test and heating thermal commissioning.
4.The roofing works of the rough house shall be subject to water storage test and water spraying test.
5.Then, such as the prefabricated floor slab or cast-in-place slab roof should be used in the interior of the rough house and each room, it should finally achieve no plastering, leveling with putty, and the plate joints are dense, no cracks, smooth and smooth rubbing, smooth surface, uniform color, straight line angles and other states. In addition, the concrete of the base floor of each room in the portal also needs to be smooth and compacted early, so as to finally achieve firm bonding and no cracks.
6.The room that needs to be waterproof in the blank room should be carried out in strict accordance with the specifications of the waterproof layer and the protective layer, and don't forget to carry out the water storage test twice when accepting, and the final requirement is that there is no leakage.
7.In the rough room, the floor drain and flooding slope must meet the requirements of the design specifications to ensure that there is no flooding, the joint is tight and smooth, and there is no leakage.
8.The elevation of the cement floor base layer of the room in the rough room needs to consider the height and size specification when reserving and decorating.
-
Now most of the commercial housing is a rough house, the owners should carefully inspect the house in accordance with the delivery standards when opening the business, because some developers in order to catch up with the construction period, often regardless of the quality of the house and whether the supporting facilities are complete and delivered in a hurry, so that the rights and interests of buyers can not be effectively protected. Then the rough houseDelivery standardWhat is it? Below we will bring you a complete set of rough house delivery standards, hoping to provide you with help.
What is the standard for the delivery of rough houses?
Rough room delivery standard 1, hall and bad window standard: doors and windows open and close smoothly, easy to lock, supporting keys can quickly open the door, doors and windows are not deformed, and the handle is not damaged; The quality of the window matching screen is qualified; The doorbell rings normally when the battery is attached.
2. No water leakage: there is no water leakage on the roof, wall, window, and door, and there should be no yellow stains on the roof, wall, window, and door, and if there is such a problem, the house may have such problems.
3. Wall standard: Knock on the wall and ground of the house with a small hammer, the wall and ground will not crack or hollow, if there is, the developer needs to solve the problem and then let the owner take the house.
4. Circuit standard: plug any small electrical appliance into the circuit jack, and the jack should be energized normally; When plugging in small electrical appliances, close the corresponding branch switch in the switch box and each branch switch in the main switch box, and each switch is running normally.
Rough house delivery standard 5, flue standard: indoor smoke needs to be able to be discharged normally and quickly from the smoke exhaust port.
Rough house delivery standard 6, sewer standard: the sewer is unobstructed, and the liquid is quickly poured into the various floor drains and vertical seepage sewers in the house, and the liquid can quickly flow into the sewer.
Rough house delivery standard 7, waterproof standard: closed water test successful, the bathroom around the plug filled with sand plastic bags, and block the sewer, into the bathroom into the water not less than 2 cm of water, 24 hours later to see if there is a leakage downstairs, if not, it means that the waterproof of the house is qualified.
8. Reset the numbers of each water meter, electricity meter and gas meter in the house to ensure that the owner has constant disputes when paying the fee in the future.
The above is what is the standard for the delivery of the rough house brought to you? The whole content of the blank house delivery standard is the whole of the large residual ridge.
-
Due to the comparison of the rough house, so now more and more people will buy the rough house, buy the rough house, it is necessary to decorate, but there are many owners will ignore some problems, so, today I will introduce you to the acceptance criteria of the rough house? Precautions for acceptance of rough house?
Acceptance criteria for rough houses.
1. All exterior finishes, including the exterior finishes of balconies and rain covers, should be completed according to the design documents.
2. The elevation of the cement floor base of various rooms should be considered when re-decorating.
3. Public parts, public facilities, various pipelines (feeding, drainage, rainwater, heating, heating), electrical equipment (distribution boxes, cabinets, panels, sockets, switches, lamps), etc., should be fully decorated according to the design documents, and various test items should be completed according to the regulations.
4. If the prefabricated floor slab or cast-in-place slab roof is used in each room within the door, it should be leveled without plastering and putty, so as to achieve dense plate joints and no cracks, smooth and smooth rubbing, smooth surface and luster, and straight line angles; The concrete of the base floor of each room within the door should be smooth and compacted to achieve firm bonding and no cracks.
5. The floor of the room with waterproof requirements should be planned in strict accordance with the building requirements of the waterproof layer and the protective layer, and two water storage tests should be carried out during acceptance to achieve no leakage.
6. All kinds of pipelines should be carried out for water flow, pressure test, ball test and heating thermal commissioning and other acceptance work.
7. Carry out water storage and water spraying tests for roofing projects.
8. The slope of floor drain and flooding meets the design requirements, so that there is no flooding, and the joint is tight and smooth, and there is no leakage.
2. Precautions for acceptance of rough room.
Precautions for acceptance of the blank room: inspect the structure.
1: Whether the ground is flat.
2: Whether there is a crack between the room and the balcony (this is likely a precursor to the balcony to break).
3: Detect whether there is a height difference between the roof by hitting the level with a laser.
Precautions for acceptance of the blank room 2: inspect the wall.
1: When checking whether there is a hollow drum on the wall, we only need to know with a small hammer.
2: When detecting whether the wall is vertical, we can use a professional measuring ruler to stick to the wall, if the error is within the allowable range, it can be said that the wall is vertical.
3: Whether the wall is damaged, such as lime bursting points, pockmarked spots, etc., which will bring a lot of adverse effects to the decoration.
Precautions for the acceptance of the blank room: water and electricity inspection.
1: Whether the sewer pipe is smooth and whether the sound of flushing is normal.
2: Whether the weak current path in the house is unblocked.
3: In order to ensure the safety of use, it is necessary to check the insulation resistance value of the indoor wire.
Precautions for acceptance of the blank room 4: inspect doors and windows.
1: Check whether the door can be locked and whether the opening is flexible.
2: Use a professional measuring instrument to determine whether the door is correct by detecting the diagonal value of the door frame.
3: Whether the frame groove of the moving door is in good condition.
The above is to introduce to you all the knowledge about the acceptance standards of the rough house and the precautions for the acceptance of the rough house, after the rough house is decorated, we must do a good job of acceptance to avoid bringing trouble to the future life, so we must be cautious and must not be negligent.
-
Enter the area and get the decoration for free**].
Many people buy a house without decoration, and this kind of house is called a rough house. However, many people don't know much about how to inspect the rough house and what the standard is. So, what are the standards for a rough house inspection?
How to decorate a rough house? Let's take a look. 1. What is the standard for rough house inspection 1. For the wall, you can check whether there is cracking or hollowing.
Use a small hammer or other tool to hit the wall, if the sound of the wall is not true, it means that there is a hollow drum. Then make a mark in this position and fill it with putty when you are decorating. To test whether the putty on the wall is waterproof, you can take a bottle of water and splash it on the wall, touch it with your hands to see if there is mud, if there is mud, it means that the putty is not waterproof.
2. Regarding the acceptance of the roof, the main thing is to see if there is a crack problem, and whether the yin and yang angles of the roof and wall are on the horizontal line. If not, use stucco plaster to find it low when decorating, and then use putty to level it. 3. The main thing for doors and windows is to check its firmness and strength, and then check the function, whether the push and pull will be stuck, whether there are scratches on the surface, whether the material is complete, and whether there is cracking and cracking.
Two. How to decorate a rough house 1, we must learn to make clever use of space, and carry out reasonable demolition and modification of walls, heating, walls, etc. All the switches, as well as the lamps and bathtubs, washing machines, etc., must be in place.
Before the hydropower is renovated, it is necessary to invite someone to come to the door to measure, determine the transformation plan and start construction. 2. In the general decoration process, there will be more pipes in the bathroom, so it is not only non-slip when decorating, but also to ensure dryness. Therefore, the appearance of the pipe should not only be moisture-proof, but also play a decorative effect.
Do the math how much it will cost you to renovate your home
Hello Xiaobai, I'm only a little darker than you. Oh, if it does not affect your future decoration, 6000 yuan as much as possible to use on the key points, such as bathroom tiles must be used well, waterproof to do a good job and then suffer endlessly, at least the bathroom to hang a ceiling, there is a sink, toilet I do not recommend, very inconvenient, cheap and useless, advanced 6000 can not hold up. In this way, the bathroom will cost more than two thousand, this must be spent, and there will not be so much trouble after doing it seriously. >>>More
Buying a house is a top priority for our Chinese, as long as you want to get married, then the house is in the first place, but everyone knows that over the years, housing prices have remained high, a house is casually hundreds of thousands, millions, although many families simply can't afford it, sometimes it even takes two generations, three generations of a hard work, to buy a house. But if you look like this, you will really empty the house, and if there is something that needs money, you won't be able to take it out at all. >>>More
The steps and methods of water and electricity decoration of the blank room are as follows: >>>More
Precautions for rough house inspection are:
1) Pay attention to see if the documents are complete: >>>More
First of all, you have to compare their models, many models are different, the basic score is ** and the real calculation. And then compare what you can do with that money. Looking at the level of designers in these companies, most of them only tell you about the layout, but this is not enough at all, and you have to ask him about the styling and color matching. >>>More