It is impossible to lay the floor when the ground is wet, only when it is dry, and the moisture content is less than 20%. If it is floor heating, about a week is about the same, if it is a secondary leveling, you can only use gypsum, because it is convenient and dry quickly, if you use cement, it may be two skins, if your home is floor heating, you must be reminded to use the bright surface of the plastic film you said, the film is a special film for floor heating, the business that sells the floor will definitely have, if you are buying it yourself, it may be a little more expensive.
-
I've been decorating for a long time, so I'll help you answer it, one by one:
First, if the wooden floor is soaked in water, don't be in a hurry to pick it off, find a professional construction personnel who lay the wooden floor to see if there is any salvation, don't pick it off yourself, once the wooden floor is up, it will be difficult to go back first. If the wooden floor is no longer available and you need to buy a new floor, then you have to wait for the floor to dry before installing.
Second, if the ground is not very flat, it needs to be leveled first, and if the floor is laminate, use cement mortar to level it. If you lay a solid wood floor, you can use a wooden keel to level it.
Thirdly, the glossy material you are talking about is a moisture-proof and thermal insulation layer to prevent the moisture of the ground from affecting the wood floor and causing deformation.
Have other questions for me! Hehe, I hope it can help you, and the speed will be ** for the manufacturer.
-
The floor should be thoroughly dried before it can be re-laid, so as not to cause the floor to bulge due to dampness in the future. Generally, it depends on the weather conditions to determine the time for your floor to be relaid. It's best to check with a flooring merchant.
If there are many uneven places on the ground, you must level them first, otherwise you will flicker on the floor in the future. Leveling is done with cement and fine sand. Flooring merchants can also level you up, but they will charge a manual fee.
When laying the floor, the layer of moisture-proof heat insulation film between the floor and the ground is generally brought by the merchant.
-
The ground should be dried. Turn on the underfloor heating and open the windows for about a week until there is no water vapor on the closed window glass. Ground leveling is found with cement and fine sand.
The layer under the floor is called the moisture-proof diaphragm, it is also called by other names, your home is different from other homes, but the function is the same, so don't worry. Diaphragms are generally not only sold, but also those who sell flooring to ask for or buy some.
-
Wait until it's all done. Underfloor heating is now made of glass partitions, then poured with cement, then covered with foam mats, and then laid with floors. Depending on whether it is a solid wood floor or a laminate floor, depending on the floor, decide whether to use soft cloth or foam.
-
Let's use PVC flooring. Not afraid of water. Not afraid of high temperatures. Also environmentally friendly. Particularly suitable for underfloor heating.
-
In this case, of course, it is necessary to wait for the ground to dry before laying the wooden floor to prevent the floor from being deformed by moisture. Wait until the ground is dry. Moreover, it is necessary to do a good job of moisture-proof treatment, generally laying moisture-proof film. Let me tell you about the precautions for laying floors:
Precautions for flooring.
1. Overall trial paving: adjust the color difference of the floor. The floor with the same pattern and color can be placed in the living room, aisle or obvious place, and the slightly cracked floor can be placed under the furniture or in the corner, so as to achieve the overall aesthetic coordination.
2. When the floor is laid, reserve an expansion joint of more than 8mm between the floor and the wall. It is forbidden to apply any glue between the solid wood floor and the plywood. According to the local situation, the corresponding expansion joints should be left between the floor and the floor
So so. In the dry Northwest, North and Northeast regions, it is generally better to have a natural compactness between the floors.
3. When nailing the floor, use the special nail for the floor to drive obliquely, and the steam nail shall not be used.
Since hardwood flooring is a natural material, there are differences in climate, temperature and humidity in different regions of the country. Construction methods vary slightly depending on the region, so it is necessary to hire a professional to carry out the construction.
Construction points: 1. When the length of the floor is greater than or equal to 6m, or the length of the floor is greater than or equal to 10m, reasonable spacing measures must be taken, expansion joints must be set and the transition is made with decorative strips. Near the door, it is advisable to set up expansion joints and transition with decorative strips.
2. The surface of the floor should be clean and smooth. The appearance quality of the floor should meet the requirements of the corresponding product standards.
3. The seam is 1 2 or 1 3 in the adjacent row of floors.
4. The floor should be laid firmly, not loose, and there should be no abnormal sound when stepping on it.
Common problems after solid wood flooring is paved with poor beams.
According to the survey, more than 55% of the reasons for consumer disputes over solid wood flooring are caused by the level of paving construction; 15% is the selection of inferior accessories, such as the moisture content of the wet wood keel on the ground is too high, or the use of decayed, inferior wood-based panels, latex, inferior paint, etc.; 15% is due to improper on-site maintenance; 15% of Hongyun is the quality problem of the solid wood floor itself.
Yi Yang Qianxi: Push open the skylight at night.
Say wishes to the meteor. >>>More
Generally, you can step on it after two days.
Precautions: Remove the cement and other foreign objects attached to the brick surface during construction in time, and always keep the brick surface clean. When the product needs to be constructed after the paving, the dust stains on the surface of the product should be removed with a dry mop, and no sand, sewage and other substances that damage the surface should be left. >>>More
How to remove the white marks on the floor of the renovated house? There are two types of conventional situations: laminate flooring. >>>More
Cleaning is a very hard thing, but everyone will know that it is quite tiring to experience it, so we should usually take more care of the health at home, and be more considerate of the people who clean, but most people use clean water when mopping the floor, which is the most traditional way to clean up, but it is easy to fall dust after mopping the floor with clean water, and it has to be dragged again every day or two. >>>More
Solve the problem of Windows XP shutting down but restarting. >>>More