What should I do if I want to combine solid wood flooring with concrete flooring?

Updated on home 2024-07-13
16 answers
  1. Anonymous users2024-02-12

    On the one hand, it can be laid according to different space functional areas, which is more convenient for life, and on the other hand, it can make the space more layered and beautiful. However, what often seems like such a simple transition is a good distinction to cut off the space. Note that in the stone, the hardness of granite is relatively large, and the interior uses a lot of Indian red, Chinese red, black gold and other stones, and the threshold is increased.

    Not just hardness, but also factors such as color and texture. But the bedroom wood floor and the living room floor tiles are two different materials, often considering the beauty and the characteristics of the material, in the middle will use a little careful thinking to transition a little, now I will talk to you about some of the tips I know.

    Paved to the side of the aisle wall, the bedroom door opening is connected by the door stone, the tile, the door stone, the wooden floor must be on a horizontal line, so that it is both beautiful and ensures a line of door seams, good sound insulation effect, when the door stone is paved, pay attention to the bedroom edge to be perpendicular to the door edge, such as net, dark brown net, Chinese red, Chinese black, etc., the place where the threshold stone and the wooden floor are connected, generally similar to the color of the wooden floor, the aluminum alloy edge strip is closed, there is a 7-shape, there is also a T-shaped universal buckle, beautiful and generous.

    The general method of wood floor in the bedroom is that the wood floor is closed with a mouth strip to close the interface between the wood floor and the tile, this kind of mouth bar is wide and clumsy, can not achieve beauty, if you want to be beautiful from the process.

    Said that I think the copper bar closure is a very high-quality choice, see the following I hand-painted special wooden floor closure to close the stubble. After closing the bedroom door, this closing strip is just below the door leaf, whether the door is fully covered with wood or not, the outside will not see the inside ground, the inside will not see the outside ground, it will not be in the forest, and the trees will grow in the soil. In the home décor industry, tiles baked with clay and wooden floors cut and scraped with wood become the voices of ice and fire.

    In the traditional home décor industry, there is little desire to use both of these interdependencies.

  2. Anonymous users2024-02-11

    with foam glue. Because a layer of foam glue can combine the solid wood floor with the cement floor, and it can also have a good silent effect.

  3. Anonymous users2024-02-10

    It is possible to apply a layer of tile adhesive to the solid wood floor, and then combine the solid wood floor with the cement floor.

  4. Anonymous users2024-02-09

    You should put a layer of cement on the bottom and then wait for the cement to dry before putting it on the solid wood floor, which can also make the floor stronger.

  5. Anonymous users2024-02-08

    1. The pavement scheme should be constant.

    For each stadium, or theater stage, what materials to pave, and how to pave, are determined according to the actual parameters of the sports venue and the investment budget. Therefore, once the sports wood floor paving scheme is decided, it should not be changed easily.

    Frequent changes to the design and construction plan of sports wood flooring will cause additional investment and even affect the construction period. Therefore, in the design of sports wood floor paving scheme, it is necessary to communicate and coordinate with sports wood floor manufacturers, clarify standards, and avoid unnecessary problems.

    2. Customized products should be in advance.

    The overall structure of the sports wood floor is basically all solid wood structure, and the moisture content of the floor will be done according to the climatic conditions and moisture content changes of the installation project site during production, which is generally about 6%-14% on average. Before ordering sports wood flooring, it is important to allow sufficient time for production in order to ensure the quality of the flooring.

    3. Avoid cross construction.

    Cross construction, that is, the paving of sports wood floors, is carried out at the same time as other construction projects of stadiums and conflicts with each other. The sports wood floor paving project should avoid cross construction, so as to affect the smooth progress of the sports wood floor pavement, or the construction of other stadium construction projects destroys the paved sports wood floor floor.

    4. Supervision and acceptance should be involved.

    Although it is said that the installation project of sports wood flooring is operated by the pavement engineer of the sports wood floor manufacturer. However, the stadium contractor and Party A should also arrange a special person to be responsible for tracking and supervision, and solve the problems in the installation of sports wood flooring in a timely manner.

  6. Anonymous users2024-02-07

    The concrete floor should be prepared for moisture first, and the keel should be laid before the wooden floor can be laid.

    There will be a lot of dust and impurities on the cement floor of the new house, which should be cleaned with a vacuum cleaner or cleaned with clean water, and then paved after being thoroughly cleaned. Otherwise, the floor is not smooth enough after paving, and it is easy to bulge and peel off the paint.

    Wooden flooring:

    1.The floor should be paved last, and it should not be cross-constructed with other projects. It should be sanded and painted as soon as possible after laying to avoid staining or moisture deterioration of the floor.

    Shape. 2.Before laying, the product will be disassembled and left on site for 2 days, and then paved after it gradually adapts to avoid expansion and contraction after laying.

    3.Before laying, it is necessary to prepare for moisture, especially in the humid place of the bottom layer, and be sure to apply moisture-proof paint or moisture-proof film and other products.

    4.The laying keel should be flat and stable, and it should not be reinforced with cement, but with expansion bolts and Meigu nails.

    5.The keel is best based on larch and liu'an, and the moisture content of the keel should be close to the moisture content of the floor. In addition, the distance between the keels should not be too large, not more than 30 cm. And the two ends of the floor should be fixed on the keel, not empty, and then nailed with nails.

    6.The floor should not be spread too tightly, and there should be a gap of centimeters around it. In addition, it is not allowed to lay ultra-wide, if the site is wide, it should be separated and cut off, and then press the copper strip to transition.

    7.The junction between the floors should be isolated and moisture-proof.

    8.The floor has a certain color, if there are special requirements, it is necessary to do a good job of sorting, and then take a gradual transition method to pave to reduce the sense of visual mutation.

  7. Anonymous users2024-02-06

    Yes, the ground is leveled first, and if the cement floor is directly paved, the composite floor is paved, which is the best choice for people who don't want to spend too much money on decoration, which is cheap and strong.

    Laying solid wood floors can not be directly laid on the ground, you must first install keels on the ground, and solid wood floors are much more expensive.

  8. Anonymous users2024-02-05

    Before laying the wooden floor, the cement floor should first treat the putty and latex paint on the ground, deal with the putty residue, clean the ground dust, clean the ground, and close the construction site before.

    1. Remove putty and latex paint from the ground

    When renovating a house, there will always be a lot of putty and latex paint on the ground, and you need to dispose of it first.

    2. Remove the putty residue at the intersection of the ground and the wall, as well as the loose part of the putty edge

    Usually when we scrape putty, workers will only scrape it to about the height of the baseboard from the ground, so the wall blocked by the baseboard usually does not scrape putty, it is recommended that when we carry out wall treatment, the construction personnel are required to scrape putty to the bottom of the wall.

    3. Clean up the dust on the ground

    If there is some small dust on the ground that is difficult to remove, you can first use a latex paint brush to brush all the walls and then clean them.

    4. Clean the ground

    If the floor cleaning work is not done well, it is easy to cause unevenness when laying wooden floors or tiles, arching and other phenomena, we need to wait until the ground is dry before laying when installing the floor.

    5. Close the construction site before the wooden floor enters to prevent dust pollution

    Then we need to seal the floor, wait for the floor to be laid, if the floor has not been laid for a long time, before the floor is laid, the surface dust needs to be removed.

  9. Anonymous users2024-02-04

    Solid wood flooring cannot be directly laid on the cement floor, and the floor will be wet when used in the future.

    If the ground base is good, you can not make a wooden keel, but you need to do a good job of moisture-proof treatment. First of all, the ground is wiped with a mop cloth and then dried, and then covered with moisture-proof film. When the original ground of the home is uneven or unsmeared with the leveling layer, it is not allowed to be paved directly, and the practice of wooden keel foundation should be chosen.

    The wooden keel generally chooses a cross-sectional size of 30mm 30mm, and a cross-sectional size of 40mm and 60mm is used in places where the amount of personnel activity is large. Before installation, the underside of the wooden keel was brushed with anticorrosive paint 2 or 3 times.

  10. Anonymous users2024-02-03

    If the original ground at home is uneven or not wiped dry and flat, it is not possible to lay the wooden floor directly, you can choose the wooden keel to lay the foundation, before installation, the bottom side of the wooden keel is brushed with anti-corrosion paint 3-4 times. After the installation of the wooden keel, it needs to be planed, and the solid wood floor needs to be fixed with spiral nails, and some insect-proof drugs are bought and placed in the keel, which can prolong the use time of the keel.

  11. Anonymous users2024-02-02

    Whether the solid wood floor can be directly laid on the cement floor, this problem should be seen according to the situation: if the ground base is good, you can not make a wooden keel, but you need to do a good job of moisture-proof treatment.

    1. First of all, wipe the ground with a mop cloth and dry it, and then lay the floor with moisture-proof film. When the original ground at home is uneven or unscreed, it is not possible to lay the wooden floor directly, and the wooden keel should be used as a base.

    2. The wooden keel generally chooses a cross-sectional size of 40mm and 40mm, and the cross-sectional size of 40mm and 60mm is used in places where the amount of personnel activity is large.

    3. Before installation, the bottom side of the wooden keel is brushed with anticorrosive paint 2 or 3 times. After the installation of the wooden keel should be planed, the solid wood floor should be fixed with spiral nails, and if possible, buy some insect repellent and place it in the keel, which can extend the service life of the keel.

    4. In the case of economic allowability, in places with a large amount of personnel activities (such as places where parties are often held), after paving the wooden keel, add a large core board on the keel, the effect is better, the foot feeling is very good, and the quality is not easy to have problems. After the wooden floor is paved, there should be an expansion gap of 5 to 10mm between the wooden floor and the surrounding wall, and it should be pressed with a baseboard to not expose the "horse's feet".

    5. The joints between the wooden floors should be tight, leaving no traces, the joint positions should be staggered, the sticking nails should be firm, and there should be no loose feeling when walking on it, and there should be no sound. The surface of the wooden floor should be polished smooth, without planing marks, thorns, scars, clear wood grain, smooth texture, and uniform color.

  12. Anonymous users2024-02-01

    The wooden keel for solid wood flooring will feel much better, the stability will be much better, and it is not easy to deform. There are also many people who do this directly on the concrete floor, but it is recommended that you choose a wooden keel, thank you.

  13. Anonymous users2024-01-31

    No, wooden things are easy to be damp or cooled and deformed, can not be directly laid on the cement floor, the floor must be paved below, separated from the ground, if directly laid on the cement floor, the floor will crack when it is cold, and the floor will bulge when it is hot! Can laminate flooring be laid? That can be paved directly on the concrete floor, if it is geothermal, it is better to pave the composite one!

  14. Anonymous users2024-01-30

    If the ground base is good, it is naturally possible, but it is not recommended. If you think about it, when you install the wooden floor, you have more requirements, and it is troublesome to install it badly, and it must be moisture-proof and insect-proof. It's better not to be more realistic, and you don't need this expense.

  15. Anonymous users2024-01-29

    1) If the thickness of the board allows, it is necessary to use the inlay form of tongue and groove, notch, cut or wrong mouth to increase the fastness.

    2) The back of the board retains a certain degree of roughness of the socks, which can increase the adhesion. (3) Use wooden boards (not laminate fibers, planing one or two grooves along the length of the back to avoid the bending of the plank's wings, and also increase the contact surface of the paste.

    4) The cement floor should also be kept rough.

    5) First apply one or two times of cold base oil on the cement floor (asphalt and jiji oil are 3:7 and 1:1 are combined), and then lay wooden boards on it.

  16. Anonymous users2024-01-28

    1.Unlike other flooring materials, cement floors must be kept moist when laying them. Therefore, before starting the construction, we must sprinkle water evenly on the ground so that the ground is completely wet.

    Only in this way is the cement less susceptible to cracking because it is too dry in the subsequent process. Some friends ignore this, and in the end, due to insufficient draft, the adhesion between the cement and the base layer is greatly reduced.

    2.Before laying the cement floor, we also need to prepare, that is, with cement. Maybe some friends don't know that cement is not directly used.

    It needs to be mixed with sand in a certain proportion to form the cement that we often use. So what's the ratio? In general, the ratio of cement to sand is about 1:

    5。This is the best ratio of sediment, so that the cement effect of mixing is the best.

    3.After completing the above two steps, we can start to stir the mortar. When mixing mortar, the uniformity of the mortar must be ensured, and there must be no local thickness and local thinness, because this is related to the use of mortar.

    If the mortar is mixed unevenly, the laid ground will be uneven. If the ground is uneven, it will be serious to carry out the later steps.

    4.After laying the mortar, we need to level the ground. The main purpose here is to compensate for some of the problems caused by the depression of the ground and to level the laid concrete floor.

    Usually, cement scraping tools are used for one-way construction. In this step, it must be noted that leveling should be completed before the mortar solidifies, otherwise the mortar will not be able to be carried out after solidification. Only by leveling the ground can the problems caused by the depression of the ground be compensated.

    5.The final step is to maintain the concrete floor. Generally speaking, after the cement floor is laid, it needs to be watered two or three times a day to make the cement floor dry naturally.

    In addition, if we want the cement floor to have a light transmission effect, we also need calendering. This step can only begin after the cement floor has dried and cured for four or five hours. By calendering, the concrete floor will have a light transmission effect.

Related questions
12 answers2024-07-13

Cement floors are self-leveling. Otherwise, after paving the floor for a long time, the sand under the floor will wear and leak the mat under the floor, which will directly lead to the damage of the back plate of the floor, resulting in the phenomenon of bulging on the surface of the floor, even if it is a small hole, it will also affect the beauty of the floor. >>>More

6 answers2024-07-13

When it comes to the best of PVC plastic flooring, you can learn about Beijing Youshang Anaibao Building Materials, Beijing Youshang Anaibao Building Materials is a comprehensive strength of strong productive enterprises, sports treasure - professional sports flooring brand, Anaibao - commercial plastic flooring, well-known brand, yoso Youshang - professional production of dance floor brand, Hasbro - professional children's flooring brand, factory direct sales, covers an area of more than 50 acres, 10 large-scale PVC flooring production lines, complete products, A professional team of 300 people, 11 offices across the country, more convenient and thoughtful service, 7 days no reason to return and exchange, 24-hour after-sales service, professional installation workers, can be installed nationwide, self-provided trucks, self-provided drivers, spot issued within 12 hours, 520,000 square meters of inventory spot, welcome to call **** inquiry, consultation**: 400675....

10 answers2024-07-13

It's too arbitrary to say that's good! Solid wood floor is a floor directly processed from wood, solid wood flooring is also called the original ecological floor, with no pollution, natural pattern, elegant and heavy, rich texture, elastic and real advantages, is the preferred material for floor laying in home decoration. Its disadvantages are large color difference, not wear-resistant, and easy to lose luster. >>>More

15 answers2024-07-13

Three-layer wood composite is more wear-resistant, and parquet** is relatively inexpensive and simple to install. >>>More

5 answers2024-07-13

1. Floor specifications.

In terms of the stability of the plank, the smaller the size of the floor, the better the resistance to deformation, so it is necessary to choose a shorter, narrower solid wood floor, and minimize the bending, twisting, scooping, shrinking, arching and other phenomena of the solid wood floor. Flooring experts believe that the short one is better than the long one; The narrow one is better than the wide, and it is cheap. But now the market is popular wide plate, the wide plate is more beautiful than the narrow plate, generous, the texture is relaxed, the pattern is complete, but the qualified wide plate must go through strict material selection and quality acceptance. >>>More