In the process of decoration of a new house, it is necessary to start the acceptance, and should not wait until the decoration is completed to accept. If the acceptance is unqualified, the wall is smashed, and the hole is dug, wouldn't it be even worse? Below the author will describe step-by-step what important project acceptances are and when.
What are the decoration acceptance projects? When is it accepted?
1.Renovation of the house.
House renovation belongs to the first project in the decoration, seemingly inconspicuous, there are many cases of smashing the wall workers to smash the sewer pipe, if not accepted in time, wait until the masons finish the bricks, the source of the smell is covered but not sealed, and then ......Can't find the ** odor. In addition to ensuring that the pipes are not damaged, you should also pay attention to whether the doors and windows are damaged, especially the lower part of the gate, whether there are cracks in the load-bearing walls and load-bearing beams, etc.
2.Hydropower component.
After the renovation, 10 out of 10 owners felt that the socket was not enough or that there was a problem with the position of the socket switch. Hydropower should be on site during construction to simulate life scenarios to ensure that switches and sockets are in place. At the same time, the on-site acceptance of the construction standardization, whether there is no foreign matter in the sewer pipe after the water test, whether the faucet is enough, whether the spacing between the shower outlets is the standard 15 cm, whether the lock or yellow wax pipe is used in the bottom box to wrap the protective wire, whether the water supply pipe is free of leakage during the pressure test, etc.
3.Masonry part.
The masonry part has the well-known waterproof water test inspection, which is only one of them, and whether the bathroom threshold stone part is painted with waterproof and waterproof flow to the living room, whether the semi-dry cement mortar is used when the floor tile is paved, whether the cement mortar is mixed with laundry detergent (mixed with laundry detergent is unqualified), whether the tile is left jointed, whether the caulking is used with a scraper (the one with a rag is directly filled with a rag is unqualified) and whether the steel bar is inserted when the new wall is built.
4.Carpentry part.
The carpentry acceptance part is not much, but it cannot be ignored. The more typical items that need to be accepted include whether there are seams in the gypsum board ceiling, whether the corners of the ceiling are made of 7-figure technology, whether the nail hole cannot be seen on the outside of the ecological board cabinet, and whether the inside of the wardrobe or other cabinets is horizontal and vertical.
5.Painter part.
The phenomenon of cutting corners in paint projects is very common, mainly putty is only scraped once, latex paint is used with expired latex paint, the corner of the wall is not 90 degrees, and whether the top surface of the wall adopts yin or yang corner lines.
6.Installation works.
The installation project is mainly based on water and electricity, and the all-inclusive owner mainly carefully compares whether the installation goods are the brand and style they want. In addition, it is necessary to carefully observe whether the wiring of the installation master is standardized, whether the screws are tightened, etc.
If you don't understand the decoration, you can ask a professional home inspector to help inspect the construction quality. Some projects, such as water and electricity, must be present in person and solve problems on the spot. Finally, thank you for the invitation, I hope the above can help you!
-
It is necessary to pay attention to the condition of the wall, pay attention to whether the tiles are hollow, pay attention to the situation of the bathroom, the situation of drainage, and pay attention to whether the pipes in the kitchen are unblocked, all of which must be checked.
-
Pay attention to the condition of the wall, whether the tile is hollow, pay attention to the situation of the bathroom, the drainage, whether the kitchen pipes are unblocked, and some places must be checked.
-
It is necessary to carefully check the size of the door gap, the gap below should not be less than 5 mm, and should not exceed 8 mm, and the door gap on the other sides should not exceed 3 mm. When checking the windows, open and close the windows flexibly to see if the glass is broken and the window frame is not deformed.
-
It is necessary to pay attention to the size of the door crack, do not check the window, check the tiles, be sure to pay attention to the inspection of water leakage, and pay attention to the inspection of the circuit, so as to better ensure safety.
-
How to accept the house decoration is really a headache for the majority of homeowners. When inspecting a house, many homeowners who don't know how to inspect it are sure to overlook a lot of details. As for how to accept the house decoration, the problems that need to be paid attention to in different areas are also different.
How to accept the house decoration after it is decorated? There are a few things to keep in mind:
Water and electricity belong to the hidden works of the house. Therefore, after the completion of the hydropower project, the acceptance should be carried out as soon as possible, and do not wait until all the projects are completed. Check whether the water and electricity lines are straight, whether there are protective materials on the surface, and whether you pay attention to the safety of the stove.
After the overall decoration, check whether the water and electricity can be used normally, and pay attention to whether the water outlet and drainage problems are smooth.
At the time of acceptance, it is important to pay attention to whether the wall surface is flat and free of cracks. If it is latex paint, check whether the color on the wall is uniform, whether there are blisters, wrinkles, etc. If you are using wallpaper, you should also pay attention to whether the pattern of the wallpaper is spliced correctly, whether the wallpaper is cut smoothly, and there are no tear marks.
When inspecting the ground, it is not possible to see directly whether the ground is flat or not with the naked eye, so it can be verified by a vertical measuring ruler. The floor of the bathroom should have a slope of about 15 degrees and a floor drain at the lowest point, which is a qualified bathroom floor. If there are tiles on the floor, you can tap gently to check for hollow conditions.
Usually, hollow tiles account for about 20% of the total tile area, and these are qualified.
After inspecting the front part of the house, go and check the waterproofing in the house. In particular, bathrooms must pass a 24-hour closed water test to be considered qualified. The inspection of doors and windows in the home is also crucial, to see if there are any gaps, etc.
How to accept the house decoration and master the above four parts. Remember, after the completion of the water and electricity, it is necessary to check it as soon as possible, so as not to solve the problem in the first time after the decoration is completed. Waterproofing is the top priority, waterproofing is not done well, once there is leakage and seepage in the future life, it will be troublesome.
Doors and windows should be tight, walls should be free of cracks, and the ground should be flat.
You can get it for free
-
Introduction: After everyone renovates a new house, it always needs to be accepted, so you must also know the circuit at the same time as the acceptance. Many people don't have an electrical box when they are distributing, so it may also cause some routers to disconnect, resulting in no way to act on their own actions.
You have to take a look at the wall to see if there is a hollow phenomenon, some people find that the skin on the wall has fallen off soon after the renovation, which is also because you did not accept it at that time. <>
Many people will install a lot of sockets at home, if others do not get these right, it will also bring you a lot of potential safety hazards, which dismantle in the acceptance at the same time you also have to know what you should do. Some people will find that it has been raining in the house when it rains, so at the same time, you should also know that if these things are not repaired for a long time, it will also feel that you are inexperienced, and it will also bring you great danger. Roof leaks are something that everyone doesn't want to see, so if he doesn't do it for you and doesn't do it evenly, you have to get it all over.
The steps in the bathroom are very important, if you don't do a good job of waterproofing, it may cause the water you use to leak into someone else's home. At this time, the best way is to turn on all the faucets and turn them on to the maximum to see if there is any running water or bad things. When a person decorates, he must follow a fixed process, don't change everything blindly, and you may not pass the audit at all in the end.
When buying a house, you must sign a good contract, like if there is a problem with the house, you can also choose to go to them. Young people are lazy and like to buy a renovated house, but if you don't accept it at this time, you will feel a big loss when you buy the house. The difference in ability also represents what kind of house you will choose, so no matter what, you must make yourself more savvy while choosing.
-
Don't bring unnecessary trouble to yourself, and also pay attention to circuit problems, don't let the fire break out at home, and also pay attention to the separation of dry and wet, don't let the mold at home, but I believe that the most important point is that when accepting, you must pay attention to the problem of air leakage, and don't let the home be too cold.
-
Look at the thickness of the walls, the structure and sealing strips of doors and windows, the structure of the house, the water and water supply of the bathroom, the water and electricity and the wiring with a clear cavity stupid shirt problem, natural gas pipelines, water heater pipes, if you don't know, you can ask the people around you for advice or do a good job on the Internet in advance.
-
First of all, it is necessary to measure the size of the spine hall, talk about whether the size of the concealment is the same as what was said when buying, but also look at the quality of the wall, avoid the appearance of hollow walls, but also look at the pattern, but also look at the size of the glass window sill bathroom.
-
Look at the thickness of the walls, the structure and sealing strips of the doors and windows, the layout of the house, the uneven water in the bathroom, the results of water and electricity and wiring, the air pipes, and the water heater pipes.
-
After the decoration of the new house is completed, it is necessary to accept some parts of the house decoration. Which places are accepted after the decoration of the new house, these places must be known, otherwise it will affect the quality of the relevant floor decoration. But what must be paid attention to when accepting a new house?
Let's take a look at the precautions for accepting the house.
1. Acceptance of water supply and drainage pipeline projects.
After the decoration of the new house is completed, the installation of relevant water supply and drainage pipes must be accepted, otherwise there will be water leakage and non-standard quality in the later stage, which will affect the quality of the house decoration. The quality of pipes and fittings should meet the current standards; The valve installation should be upright, and the switch should be flexible; After the pressure test of the bending water of the world, all pipes, valves and joints should be free of water seepage and leakage.
Second, the wall and ground acceptance.
When the ground and wall are inspected for a new house, it is necessary to check whether the decoration materials are environmentally friendly and whether they meet the relevant brand materials purchased according to the needs. The level of the wall and floor should be consistent with the direction of the tiles or floors, and the height difference between them should not exceed 2mm, without defects and hollowing.
3. Acceptance of walls and corners.
Accept the verticality of the wall and the corner, otherwise it will affect the beauty of the appearance of the wall of the house, and also check whether there is a problem with the structure of the wall. For example, the seams of wallpaper and wall cloth should be lapped at the shady corners, and the corners should be compacted at the sunny corners, and there should be no seams. Wallpaper, wall cloth and hanging mirror line, door and window covers, curtain boxes, baseboards, etc. are close together, and there must be no gaps.
Fourth, the acceptance of the carpentry structure.
The carpentry part of the house decoration is indispensable, so when you accept the carpentry, you must check whether the carpentry structure is straight and flat. Woodworking modeling, our woodworking projects should have a flat surface, with no bulging or breakage. Symmetry carpentry projects should be symmetrical.
Fifth, the acceptance of the electrical box.
The installation standard of the electric leakage box stipulates that the electrical box and switch box should be installed upright and firm, and shall not be inverted or skewed; The installation of the electrical box should be vertical; The vertical distance between the bottom and the ground should be greater than or equal to less than or equal to; If there are multiple electrical boxes, the distance between the electrical boxes should not be less than 30mm. The specifications of the electrical box can be checked with a support and angle ruler.
That's all about:
-
When the new house is renovated and accepted, check whether the doors and windows are damaged, whether they are flexible, whether the ground is hollow, whether the circuit is qualified and whether the various sewers are unobstructed.
Many people do not know how to accept the new house after the decoration is completed, most people may look at whether there are some quality problems, and hurriedly pay money to the decoration company, but in fact, there are many details that need to be paid attention to, otherwise it is difficult to find the decoration company for theory if there is a problem in the later stage.
1. Acceptance of doors and windows.
First of all, we need to check whether the installation of the doors and windows is firm, and how flexible the door opening and closing is. The second is whether the hardware on the doors and windows is complete, it is best to be some popular brand hardware, which is not easy to have problems in the later stage, check whether the sealant of the glass is uniform, and whether the selection of the sealing strip meets the national regulations, so as to avoid water leakage in rainy days in the later stage. Finally, look at whether the door frame and the entire window frame are horizontal and vertical, and whether there is any skewed condition.
2. Line acceptance.
The acceptance of the line is a very important part, if there is a problem with the line, it is easy to have a safety accident. First of all, in the case of power failure, check whether the circuit lines in all rooms are in line with the regulations, under normal circumstances, the general lighting circuit requirements are not less than square millimeters, and some high-power kitchen requirements should be higher. Secondly, look at whether the circuit of each socket is unblocked, and finally turn on the main switch to check the operation status of each place.
3. Drainage acceptance.
The acceptance of the drainage condition is a part that cannot be ignored, if there is a sewer blockage, but in the future, it will not only affect their own living life, but also will have a certain impact on the residents downstairs. Therefore, be sure to check whether the drainage of the sewer pipes is smooth, whether there is any leakage, especially some floor drains, toilets and balcony showers, drain the water from the faucet to the ground and wait for a period of time to see if there is any leakage.
Sockets must be reserved in the following places. TV wall, air conditioning port, balcony, bathroom, kitchen, entrance, bedside table. Sockets must be reserved in these places.
1.Glue. Formaldehyde plays a stabilizing role in glue, and glue cannot exist without formaldehyde. >>>More
The balcony should be waterproof, and the gap between the balcony is easy to leak on rainy days; The kitchen and bathroom should be done, and there is water on the floor after bathing; Floor heating should be waterproof, which can increase the service life; The slotted part of the waterway renovation should be waterproofed.
What are the common problems and key points of hardcover house inspection: decoration concealment project, decoration concealment project includes water and hydropower transformation, ceiling structure and toilet waterproof engineering project. The structure of the ceiling is not indicated in the as-built drawings, but the side of the fine decoration, the lamp position or the ventilation hole of the air conditioner can be seen in the structure, according to the regulations, the decoration concealment project decoration ceiling must be made of light steel keel partition wall. >>>More
If the style can be matched, the entrance door cover, the living room door cover, the balcony door cover, these do not need to be the door, and want to do the position of the door cover, you can consider using the stainless steel door cover. Wooden door sets are not cost-effective, it is the majority of the money made by manufacturers and installers, and sometimes a door cover is more expensive than the door.