In the process of our renovation, we will encounter a lot of problems. For example, should the bathroom be made with a suspended ceiling first, or should it be installed with a bath bomb first? I think this question has bothered many people, so I will answer it for you below.
In the process of decorating the bathroom, it is necessary to first suspend the ceiling and install the bath bomb, which can well protect the bulb of the bath bomb from being damaged. And install the ceiling first, you can reserve the position of the lamp and bath bomb. After the installation will be more convenient, if the bath bomb lamp is installed directly, then we have to re-set a position for the ceiling, there will be a lot of problems, and there will be no master to do this.
It's the same with the kitchen. It is also necessary to install the ceiling before the range hood.
of installation. Because the ceiling of the kitchen is not directly related to the range hood, the range hood can be hidden inside our kitchen wall cabinet. And now many people will choose integrated stoves when decorating their kitchens.
As a stove, there is no need to consider the order of the ceiling or the range hood. In fact, this principle is easy to understand. When decorating the hole lamp in the living room, it is also necessary to do a good job of the ceiling first, and then position the lamp.
I've never seen a light bulb installed before even the top is hoisted, isn't that a mess? <>
When installing the ceiling in the bathroom, you need to pay attention to the direction of the circuit and reserve the corresponding installation holes in advance. And when the gusset is installed, a certain gap needs to be reserved. The keel of the ceiling should be selected to be strong and durable, the thickness of the gusset does not represent its quality, and the thickness can not only be considered when choosing, but more importantly, how durable it is.
There are also some issues that you need to pay attention to when installing a bath bomb. The first thing is to determine the height of the bath bomb, the height of the bath bomb box is about 200 mm. The mezzanine of the ceiling should be greater than 200 mm, if it is too high, it will make us unable to achieve the heating effect when taking a bath in winter, and if it is too low, it will also make us feel uncomfortable due to excessive heating.
-
When the bathroom is in the ceiling, you can install the bath bomb by the way, and now the bath bomb and the bathroom lamp are basically integrated. The kitchen should be installed first, when the hood is fixed, the kitchen can be directly loaded into the cabinet when doing carpentry or making the whole cabinet, which is both beautiful and does not waste space.
-
It should be done first to make a suspended ceiling; Because this is the normal installation process, reserve the place to install the bath bomb and range hood when the ceiling is suspended, and then install it after the ceiling is lifted.
-
Suspended ceilings should be done first; Because if you install a bath bomb and range hood first, there is a high probability that materials will fall from the ceiling when making a suspended ceiling, which may hit the bath bomb and range hood.
-
Many installers encounter this situation of the ceiling, the ventilation pipe is directly thrown on the ceiling and is not connected to the vent, at this time, check the exhaust fan function can check the suction, but in actual use can not extract the toilet moisture, remember to remember! If it is not opened, it is inconvenient to operate, and the ceiling can only be removed. Judging from the ** provided by the subject, it is an integrated ceiling, which can be disassembled and assembled.
This kind of gusset is inserted into the keel when the ceiling is suspended, and it can be removed by force downward.
After the overall decoration of the <>, the first building material in the home decoration is our integrated ceiling, starting from the kitchen and bathroom, and control the size in advance when installing the integrated ceiling! This size is generally and cabinets, sanitary ware, etc. to confirm that the ceiling height of the kitchen is subject to the strict requirements of the cabinets, the current kitchen cabinets are the overall customization, in the cabinet design will directly give the height of the later integrated ceiling, the later stage must do a good job of the ceiling, and then the cabinet can be installed, the integrated ceiling is a combination of metal square plate and electrical appliances, divided into heating module, lighting module, ventilation module, with the advantages of simple installation, flexible layout, convenient maintenance, etc., becoming the mainstream of bathroom and kitchen ceiling.
Many friends are seeing what to install when decorating, but they don't know that the decoration is also in order, and the unreasonable order will affect the process of the later decoration, and may also lead to the inability to carry out the work behind, or even dismantle and reinstall.
If the ceiling is completed in the later stage, the ceiling needs to be removed again for installation. Generally, the flue hole of the kitchen should be opened when the bricklayer is completed, and the smoke machine should be determined when the style and size are renovated in water and electricity, and the detailed size of the smoke machine should be provided when making cabinets. Therefore, when decorating, it is recommended that friends try to be careful and concerned about every detail.
-
Of course, the bath bomb is installed first, because the pipe of the bath bomb must be made, and the ceiling will be made after installation.
-
Now the decoration ceiling and bath bomb are installed at the same time, but now many families do not choose to use bath bombs, they are all warm air, and they will not be as dazzling as bath bombs.
-
Install the ceiling first, because you will know how high the bath bomb will be installed after installation.
-
Generally speaking, the kitchen installs the pipe of the range hood and the exhaust pipe of the water heater first, because these are hidden projects, and the ceiling can only be installed after the installation is completed. This is not only for safety reasons, but also for decorative reasons, to make the kitchen more aesthetically pleasing, and that the pipes are hidden so that they don't come out in the open.
Of course, there are also some decorators who install the gusset of the ceiling first. But when these masters are installing, they will reserve the location of the pipe in advance.
If you want to reserve the location of the pipe, the decorator must be very experienced, so that he knows how much space to reserve and where to reserve. Therefore, the requirements for the master are relatively high.
If you use a gusset ceiling, in fact, the problem of installing it successively is not big. Because even if the gusset of the ceiling has been installed, it can be removed piece by piece.
As for the bathroom, you should first let the plumber master keep the position of the wires and switches of the bath bomb, and then install the ceiling and then install the bath bomb during construction. Because if the bath bomb is installed first, there is a risk that the bulb of the bath bomb will break.
If the ceiling is installed first, there will be no such situation when the bath bomb is installed directly. When installing, pay attention to the distance between the ceiling and the bath bomb, otherwise it is easy to conflict, and it will be difficult to adjust.
When installing the bath bomb, pay attention to ensure that the bath bomb is in a closed state, and other equipment should also be turned off as much as possible, otherwise it is easy to have accidents during the installation process. When installing, try to find the highest point of space to install, so as to maximize the use of space.
-
The bathroom should be suspended first and then the bath bomb should be installed, and the kitchen should be installed with a range hood first.
-
I think we should make a ceiling first, and then install a bath bomb and so on.
-
The kitchen should generally be installed with a range hood and bath bomb first, and then a suspended ceiling.
-
Let's do the ceiling first, and then install something else, it might be better.
-
I think it's better to hang the ceiling first, do the top first, and then do something else.
-
Kitchen and bathroom first to do the ceiling or install the bath bomb and range hood first? Why? Under normal circumstances, the construction personnel will first do a good job of the ceiling of the kitchen and bathroom, reserve the position of installing the bath bomb and the range hood, and take into account the pipe of the range hood when the ceiling is installed, and the pipe of the range hood is generally hidden in the ceiling.
1. Why?
Because the height of the kitchen ceiling will be subject to the strict requirements of the cabinets, the height of the ceiling will be directly given when designing the cabinets, and the cabinets can be installed only after the ceiling and the cabinets match, the range hood will be installed according to the wall cabinets in the cabinets, so that the installation position and height of the range hood will be more accurate, and all the installations of the whole kitchen will be more coordinated. For the bathroom, the decoration company is only responsible for the ceiling part, and is not responsible for the installation of bath bombs, if you need to install bath bombs, then you have to pay an additional fee, and the quality of bath bombs provided by the decoration company can not be guaranteed, after the ceiling is done, specially to buy a good bath bomb, and then ask someone to install it, it is also very perfect.
Second, install other items after the ceiling.
When decorating the kitchen, the cabinets normally need to be customized, only the ceiling is done first and then the cabinets are installed, so that the cabinets and the ceiling are more perfectly matched, and the owner will sign when he accepts the acceptance, and the acceptance is qualified. It will not destroy the finished product, whether it is the kitchen or bathroom, there are many finished product installations, as long as the installation is completed, it is a finished product, but these installations are basically on the wall and the ground, only after the ceiling is installed first, then the items on the wall and the ground are installed, so that these things will not be damaged, if the ceiling is installed after the installation of the wall and the ground, then it is easy to destroy the items installed before.
III. Conclusion. There are a lot of trivial things when decorating, if you have time, then it is good to supervise on the spot, if you don't have time, you will hand over the entire decoration to the decoration company, and you also need to check it from time to time. After all, there are problems with the qualifications of many decoration companies, and it is very important to find a regular decoration company that guarantees quality.
-
The first to do the ceiling in the installation of bath bombs and range hoods, because this decoration is not only very good-looking, but also will not affect the overall layout effect, can make the installation position and height more accurate, make the installation effect more coordinated, to achieve the most beautiful effect.
-
Suspended ceilings should be done first; Because the work of the ceiling is relatively cumbersome, it is necessary to measure the size to ensure the maximization of the space, and then install the bath bomb and range hood on the basis of the ceiling.
-
It should be done first, so that the overall decoration effect will not be destroyed, and the decoration situation can be guaranteed, so the ceiling should be chosen.
In the process of renovating the bathroom and kitchen, in general, we will first lay the bricks and then install the door. This order is based on several reasons. First of all, the installation of the door needs to be carried out under the condition of a flat wall, and the paving of bricks can make the wall more flat, which is conducive to the installation of the door. >>>More
If you don't know much or have no experience, it is easy to get worse and worse, especially the waterproof problem, so the bathroom is backfilled or waterproofed first? >>>More
When decorating a house, it is common to install doors first and then lay tiles. Renovation can generally be carried out by following these steps: >>>More
Bathroom decoration is good with tiles first; If the toilet is installed first, it will affect the laying of tiles, which will also cause waste of materials, if the tiles are then laid, so that the tiles can be cut according to the size of the toilet, and it will not affect the appearance and will not cause waste.
For bathroom decoration, first paste the wall tiles, pave the tiles, confirm that the tiles are cured and dry, and level the tile gaps to the waterproof and beautiful joints according to the process order, and then install them in the toilet. >>>More