How much does the second layer of 100,000 rural bricks and concrete cost? What should I look out for

Updated on Three rural 2024-07-14
8 answers
  1. Anonymous users2024-02-12

    In recent years, the brick-concrete structure has been welcomed by the majority of people due to its simple operation and low cost. The cost of a brick-concrete structure of about 100,000 yuan is not too expensive, about 70,000 to 80,000 yuan, but the area is not very large. Due to the two-story structure of brick and concrete housing, the audience is relatively small at present, and people do not particularly know them, so we should pay attention to the following three aspects:

    Do a good job of waterproofing, do a good job of seismic calculation, and do a good job in laying infrastructure such as water, electricity and heating.

    First, the waterproofing work of the second layer of brick and concrete.

    As we all know, it is very necessary to do a good job of waterproofing the house. Otherwise, when it rains every day, the house will be very damp, which is easy to breed bacteria, which is not conducive to people's health and living environment. When the groundwater level in the rural area where you are located is very high, the brick-concrete structure, its warm ditch should be waterproofed.

    To emphasize here, a warm ditch refers to the passage through which the heating pipe enters the room. Generally speaking, it is treated with a waterproof casing and then a concrete structure on the outside to prevent water seepage.

    Second, do a good job in the seismic calculation of brick-concrete structure houses.

    The brick-concrete structure is different from the conventional house structure in the past, so its seismic detection is very necessary. Generally speaking, it is necessary to ask the construction party to find a professional person to carry out seismic verification. When the seismic calculation is carried out, the rigid and flexible or flexible theory is generally used to calculate its seismic strength, and then the seismic calculation should pay special attention to the difference and category of the site.

    Only through the seismic calculation can we live safely and securely.

    3. Do a good job in laying infrastructure such as water, electricity, and heating.

    Doing a good job in laying infrastructure such as water, electricity, and heating is an important criterion for determining the comfort of our future life. Before construction, drawings should be drawn to determine the direction and arrangement of water pipes, electricity, heating, etc., and to design reasonable water and electricity measures such as faucets, sockets, plugs, and drains. U-shaped floor heating pipes are generally used for the laying of floor heating.

    In addition, if you plan to install ** air conditioner, you should reserve the water inlet and water outlet, plan the arrangement of the air outlet, and do a good job of moisture-proof treatment on the top floor.

  2. Anonymous users2024-02-11

    Depending on your design and structure, if it's just ordinary brick concrete, it's about 1000 1400. The main thing to pay attention to is the way you decorate and some of the materials you choose. And you're going to have to choose some frames according to your décor.

    Make a renovation according to your budget.

  3. Anonymous users2024-02-10

    The general cost is about 150,000 yuan, the first thing is to choose high-quality products, and we must find professional construction personnel, and it is necessary to formulate a good decoration style in advance and buy good decoration materials.

  4. Anonymous users2024-02-09

    About 1000 yuan. This standard is not very low, and the brick concrete in the community is only less than 1500.

  5. Anonymous users2024-02-08

    Looking at the consumption level of your village, it is about 1,000 square meters, including decoration, excluding soft furnishings.

  6. Anonymous users2024-02-07

    1. The quality is relatively good, generally about 800 yuan per square meter.

    2. Brick-concrete structure refers to the use of bricks or blocks for the walls and columns of the vertical load-bearing structure in the building, and the reinforced concrete structure for the transverse load-bearing beams, floor slabs, roof panels, etc. In other words, the brick-concrete structure is a load-bearing structure with a small part of reinforced concrete and a large part of the brick wall. Brick-concrete structure is a kind of mixed structure, which is a mixed structural system composed of brick walls to bear loads, reinforced concrete beams, columns, slabs and other components.

    It is suitable for buildings with small studio depth, small room area, multi-storey or low-rise buildings, and the load-bearing wall can not be changed, while the frame structure can be changed for most of the wall.

  7. Anonymous users2024-02-06

    It's all up to the market. It is negotiable

  8. Anonymous users2024-02-05

    It's hard to say this specific number, it depends on your budget.

Related questions
16 answers2024-07-14

Novel and trendy design, the open terrace on the second floor gives people comfort, and the eclectic shape gives people a unique beauty. This apartment is suitable for friends who have a separate kitchen, and there is no longer a kitchen indoors to ensure that it is clean and tidy. Small and upright and distinctive, beautiful lines, interconnected balconies are design, and the design of small louvers is full of modern villa characteristics. >>>More

4 answers2024-07-14

Generally speaking, self-built villas in rural areas are requiredload-bearing wallsIf the demolition is successful, the most immediate influencing factor may depend on the bearing capacity of the foundationThe presence or absence of a fine stone pump is not very harmful, even in today's newly created brick and concrete structures. >>>More

11 answers2024-07-14

The homestead has long covered an area of 90 square meters, but I don't know how much the studio and net width are, so we highly recommend the multi-suite type, and look forward to you looking for engineering drawings that suit the specifications of your homestead. In fact, the specifications of the newly handled homesteads in the countryside are basically not large, and the single-family houses of small houses may become popular in the countryside after that. Although the total area of the land is not large, if you build it against their engineering drawings, you can still build a single-family house with beautiful air and generous air. >>>More

9 answers2024-07-14

You can design your own ceramic tile as the background wall, after the tile is processed, the master will paste the tile into a diamond-shaped, and the stone will be used to wrap the edge, and then make a beautiful seam for the diamond-shaped TV background wall, and use the color of the beautiful seam to set off the ceramic tile TV background wall, and the grade will be improved instantly. If the living room is tiled throughout the house, the TV background wall is also decorated with tiles. One is to directly choose a complete set of TV background wall tiles from the business, which can be installed directly on the wall. >>>More

9 answers2024-07-14

This is also the case for most of our side, rich families build three-story buildings, and families with tight financial resources also borrow money to build three-story buildings, the reasons are more complicated, let's talk about the reasons. >>>More