The decoration waterway project is also known as the concealed project in the house decoration, which is very important for the quality acceptance of the project. It is the key to the intrinsic quality of the entire residential renovation, which is related to the safety, convenience and service life of the water after occupancy. Therefore, it cannot be ignored.
In particular, the acceptance criteria and steps of the waterway during the decoration are the same.
At present, the water supply pipeline is usually installed by the first merchant entrusted by the decoration company, and the first merchant should use on-site equipment to conduct pressure leakage detection, and issue a test certificate, which shall be kept by the decoration company, and submitted to the owner for preservation together with the actual pipeline route map and other information at the end of the renovation. Water supply pipes and valves should be securely fastened using pipe clamps.
There are the following items regarding the acceptance of water pipes. 1.Installation of water pipes:
The installation of water pipes should be ideal, i.e. close to each other and have a small joint. The tube should be straight and neat. Pipes should be laid with as little bending and overlapping as possible.
2.Different types of water pipes are different in different locations, 3It is necessary to pay extra attention to the faucet water pipes, and for the water pipes, it is necessary to pay attention not only to the connection and leakage of the water pipes, but also to the damage to the surface and fittings.
4.Attention should be paid to the levelness of the washbasin and toilet seat, generally requiring that the basin and the sitting side should be on the same level plane, and all water pipes should be tested after installation, and no water seepage or leakage should be allowed.
About the steps to test the waters. 1.First, the inspector will make a retaining wall about 15 cm high at the door of the room being inspected; Place 10 cm of water in the room and mark the water level at the same time.
2.After waiting for 24 hours, the acceptance personnel observe whether the water level has changed, and check whether the ceiling of the same room downstairs is leaking. If the above phenomenon does not occur, the acceptance personnel can consider that the construction acceptance of the waterproof project is qualified.
After the investigation, the above phenomenon was found, and the construction of the waterproof project was considered unqualified. If the acceptance is unqualified, the waterproofing project must be redone and re-accepted.
-
When decorating, the standard for accepting the waterway is to pour water. Soak for 24 hours. See if there is water seepage and dampness in the neighbor's house or downstairs.
-
When decorating, the inspection of the waterway must be subject to ***.
-
Be sure to do a test of pouring water next to the sewer.
-
You can fix the water pipes during renovation so as not to break them.
-
If you want to avoid flooding, it is best to choose a residential area with a relatively high road surface.
-
It is still necessary to see whether the sewer is up to standard, and it is to look at the quality problem.
-
Look for a professional to inspect it, especially sewer pipes.
-
How happy it is to have a warm and comfortable home, so when decorating a new home, it will take into account many places, such as the circuit of the whole family, whether it is safe or not, and also take into account the waterway at home, which is also very important.
The first is that the water pipes have to go to the sky。If the water pipe is on the ground, it is easy to break if it is trampled back and forth, and if it is broken, it will be more troublesome to rework. Moreover, the water pipes on the ground are also very difficult to repair, and the whole process is very troublesome, which will make the ground dirty and affect daily life.
The cost of water pipes will be relatively high, but the cost performance is relatively high.
The second is about the installation of hot and cold water pipes. When installing hot and cold water pipes, it is not installed randomly, this is a very strict regulation, and this regulation also has its certain truth, so it is necessary to abide by certain rules, that is, to make the left pipe hot and the right pipe cold, the upper pipe is hot and the lower pipe is cold.
The third is the installation of water pipes。After the installation of the water pipe, everything is not all right, and the following problems should be paid attention to. After installation, plug the pipe head with a pipe so that other debris does not fall in.
The sewer pipe should also be carefully inspected, and if any leakage is found, it should be solved immediately.
-
I really don't know much about this, but most of the houses now are finely decorated.
-
Just put the water in it and check if there is any leakage.
-
One is the pipeline pressure test, and the other is the kitchen and bathroom waterproof closed water test.
-
When decorating, this waterway should first check whether there is any water leakage.
-
The first is to check the quality of the layout and interface of the water pipe, and the second is waterproofing.
-
Generally speaking, when decorating the waterway, it is better to watch from the side.
-
When avoiding flooding the home with Jinshan decoration, it is important to do a good job of waterproofing.
-
The layout of water and electricity during decoration is still relatively complex and needs to be designed in advance.
Home water and electricity renovation.
It is not an easy task, and the following three aspects should be paid attention to when carrying out home hydropower transformation: 1. Design the renovation plan in advance 2. Do a good job of supervision during construction 3. Pay attention to the quality of hydropower materials. >>>More
Before we carry out the renovation of the rough house, we need to accept the rough house delivered by the developer, and only then can we continue to carry out the next rough house decoration under the condition of ensuring that there is no problem with the preliminary acceptance. When decorating, we also need to pay special attention to the overall pattern, the transformation of water and electricity, the experiment of waterproofing, and the creation of some software facilities such as tiles and carpentry. >>>More
Gas renovation involves future use safety issues and needs to be operated by the gas company.
1. Hydropower transformation: First, if you only consider a water heater, you must change the pipeline, two bathrooms The hot water pipe must take into account two bathrooms, and then the kitchen should also be connected to hot water. Then there is the problem of water pipes and electric pipe wiring, and the professional decorator should be fine. >>>More
Look at your ** positioning.