How to accept the blank room and what are the precautions?

Updated on home 2024-07-14
11 answers
  1. Anonymous users2024-02-12

    Introduction: For owners who are not connoisseurs, it is a very troublesome thing to accept the rough house. But as long as you master some tips and bring the tools of the house inspection, it is not difficult to accept the rough house.

    If the inspection is not carried out at the time of the inspection, then anything will happen in the later stage, and the merchant will not admit it. So the topic I want to share with you today is how to accept the rough house and the matters to be paid attention to. <>

    For rough houses, the real estate developer will notify the owner of the delivery time relatively early, so there will be a lot of people who come to collect the house on that day. When the building is accepted on site, try to ask the other party to show the quality certificate. Then see if the documents are complete, and then measure the area to see if it is in line with the contract, and be sure to verify the facilities and equipment indicated on the sales contract to check whether there are any omissions.

    Moreover, the acceptance of water and electricity is also a very important project, which can be used by the decoration company to conduct a pressure test to see if there is any water leakage. The main acceptance of the wall is to check whether it is flat, and it is easy to dry and crack, so it is very troublesome to paste wallpaper in the later stage. <>

    If there are wooden objects in the house, you must pay attention to the inspection, many people will ignore these. It is also very important to inspect doors and windows, mainly to see whether there are signs on the glass of doors and windows, and to check whether the sealing strips of doors and windows are in good condition. Check whether the reading of the water and electricity meter is normal, if there is a situation where the number is too large, you must find the merchant in time to deal with it.

    Otherwise, if there is a quality problem with the house in the later stage, the developer will not admit it when looking for a developer, and it will be very unpleasant. <>

    And when the rough house is accepted, we must look inside and outside the house, and then see whether the floor drain has reached the phenomenon that there is no water leakage. When inspecting the wall, you can use a small hammer to tap the wall, if there is no sound of emptiness, and also check the flue in the kitchen. If the flue is not smooth, it will cause great trouble when using the kitchen in the later stage.

    Check that the doorbell and peephole, as well as the holes between the key and the lock, are clear.

  2. Anonymous users2024-02-11

    When accepting the rough house, we must pay attention to safety issues, don't let ourselves be injured, but also pay attention to quality problems, don't let the house collapse, and also pay attention to the wiring problem, don't let the fire at home, and also pay attention to the design of the kitchen, don't let the kitchen leak, but I think the most important point is that when accepting the rough house, you must pay attention to the wall problem, don't bring unnecessary trouble to yourself.

  3. Anonymous users2024-02-10

    First of all, the other party is required to show the quality certificate, check whether there is any omission of the equipment and facilities marked, carry out water and electricity acceptance, let a special maintenance company to test, and check whether the sealing strips of some doors and windows are in good condition, and when the equipment and facilities marked in the contract are checked to see if there is any omission, pay attention to the inspection line problem, but also check the wall, do not bring unnecessary trouble to yourself.

  4. Anonymous users2024-02-09

    When the building is accepted, try to ask the other party to show the quality certificate to see if the documents are complete, and then read it a few times to see if it is in line with the contract, and be sure to verify the facilities and equipment indicated in the sales contract and the purchase contract, and check whether there are any omissions; It is very important to pay attention to the wood in the house, inspect the doors and windows, and check whether the sealing strips of the doors and windows are in good condition.

  5. Anonymous users2024-02-08

    When accepting the rough house, it is necessary to ask the merchant to show various certificate documents, and then look at the relevant contract, check whether some equipment in the contract is missing, and check the water and electricity, doors and windows, sealing of the room, etc.

  6. Anonymous users2024-02-07

    Buying a house has always been the persistent goal of the people, and the personalized decoration needs make many owners not choose the renovated house when buying a house, but choose a rough house that they can show their talents. So what should we pay attention to in the acceptance of the blank house? The acceptance of the rough house mainly includes the overall structure, internal decoration acceptance, functional area and circuit acceptance.

    Let's pay attention to explain them one by one.

    First, the overall structure.

    The acceptance of the rough house should first observe the overall structure of the house, whether the division of the functional area, partitions, balconies, etc. are in place, and whether they are the same as promised at the time of purchase.

    Second, the interior decoration acceptance.

    Wall: Check the paint on the wall, whether it is smooth and crack-free, you can touch the wall with your hands to see if the wall is smooth and clean, and the wall needs to reserve the position of the pipe hole of the air conditioner.

    3. Acceptance of functional areas.

    The acceptance of the blank room should first check the drainage and water outlets when accepting the toilet to see whether the drainage and water outlets are smooth. Check again whether there is water seepage on the ceiling, whether the wall is flat and whether there is blistering or paint peeling, and whether the exhaust fan is installed. Whether the toilet and sink are smooth and smooth, and whether there are cracks.

    If there is a bathtub, you should also check whether the bathtub is leaking and whether the water is smooth.

    The acceptance of the blank room should pay special attention to whether the circuit can be used safely, whether the switch has been changed, the circuit layout of the distribution box, and whether the position of the power panel is reasonable. At the time of acceptance, it is necessary to carry out the brake and power-off test to see whether the power has been completely cut off after closing, whether the branch lines can be used normally when it is opened again, and whether the lamps and lanterns can be lit. It is also necessary to check whether the various sockets can be used normally and whether the location distribution is reasonable.

    The acceptance of the rough house about the use of the householder after the use of the feeling and convenience, must not be careless, sloppy and casual, otherwise, no matter how much painstaking decoration will be in vain.

    You can get it for free

  7. Anonymous users2024-02-06

    Hello, pay attention to the following points when accepting:

    1.Inspect the written materials related to the house. You can go directly to the property to view, focusing on whether the necessary information for building acceptance, such as the residential quality assurance certificate, instructions for use, and completion acceptance form, is complete and standardized, and can be taken in the property about the layout and area of the house, the distribution of lines, etc., and can be carried away as much as possible.

    2.The floor and walls should be level. After entering the room, after the owner determines that the actual house type is consistent with the purchase agreement, he should first make a detailed observation of the walls and floors of each room, focusing on whether the wall line of sight is flat, whether there are cracks and scratches, whether the waterproof and moisture-proof layer of the ground is reasonably designed, whether the surface angle is vertical, whether the wall and the ground are hollow, etc.

    It can bring its own small hammer, feeler gauge, tape measure, etc. for measurement.

    3.The installation of doors and windows should be thorough. Focus on whether the door and window glass is in good condition, whether the locks are complete, whether the glass strip and spacing are practical, whether the shape of the door and window is vertical, and whether there is a small gap between the door and window and the glass.

    When accepting the balcony, it is necessary to pay attention to the height of the guardrail, the spacing of the railing, the tightness of the glass, etc.

    4.The exhaust of the line should be scientific. If you are not professional enough in circuit design, ventilation and exhaust knowledge, you can use the tools you carry to perform a simple test.

    For example, if you put a lit paper 10 cm below the kitchen flue, if the smoke can go up the flue quickly, it means that the ventilation and exhaust are better, and the gas duct can also be used in the same way to test whether the alarm device is sensitive. When checking the electricity, you should be extra careful, focusing on checking whether the socket is in good contact with the power supply, whether the socket position is appropriate, whether the safety performance of the ground insulation is complete, etc., and you can use the shake meter to test.

    Pay attention to the details. The handling of some details is often the blind spot of the owner's house inspection. In fact, the flexibility of the doorbell, the normal use of the video intercom, whether the anti-theft door is scratched, the closure of doors and windows, and the smoothness of the bathroom drainage pipe, etc., will affect the excitement of the use of the house.

  8. Anonymous users2024-02-05

    Special attention should be paid to the following during home inspection:1Check the wall, see if the wall is cracked, use a ruler to close the wall to check the flatness, the gap is reasonable within centimeters, hit the wall with a hollow drum hammer, and the hollow drum in a room can not exceed two places.

  9. Anonymous users2024-02-04

    Share the relevant matters that need to be paid attention to when the acceptance of the rough house, and solve the problems in a timely manner, so as to avoid unclear responsibilities after the acceptance and signing, which will affect the occupancy.

  10. Anonymous users2024-02-03

    1. In the process of receiving, it is necessary for the developer to prepare "two books and one table", without these three things, the owner can refuse to accept the house, and track down the developer's breach of contract for delaying the delivery of the house.

    2. The developer must present the "Measured Area Table" of the unit purchased by the owner. The error between the measured area and the tentative area at the time of pre-sale is classified as a useful error within 3%, and the excess and deficiency shall be refunded according to the price on the purchase contract. If the owner encounters income and expenditure in the area and purchase contract, he should ask the developer to provide the "House Area Measurement Table" to protect his rights and interests, if he cannot provide it, then the owner has the right to refuse to accept the house.

    3. Generally speaking, we all expect to be able to inspect the house before paying the fee. But in some cities, it is the other way around, pay the fee first and then inspect the house.

    4. Public repairs should be collected in the process of applying for two certificates, but now many of them are handed over to public repairs in the process of receiving houses. It should be noted that the developer has no right to collect this fee, and it is handled by the ** part on the spot and entrusted to the bank to collect it.

    5. If you deal with the real estate certificate, you can handle it yourself, or it can be handled by the developer.

    6. After the house inspection, the part that needs to be repaired for quality problems shall be filled in clearly on the house inspection form according to the specific location, area and processing time, etc., and the property and the owner shall sign and acknowledge it on both sides, in duplicate.

  11. Anonymous users2024-02-02

    When I inspected the house, I found a professional home inspector to experience the whole house, and I will also issue a legally recognized home inspection report.

Related questions
7 answers2024-07-14

Precautions for the delivery of rough houses: (1) First check the developer's "Residential Quality Assurance Certificate", "Residential Instruction Manual", "Construction Engineering Quality Certificate", "Real Estate Development and Construction Project Completion Comprehensive Acceptance Certificate" and "Completion Acceptance Record Form". (2) Inspect the house first and then go through the procedures. >>>More

8 answers2024-07-14

Precautions for rough house inspection are:

1) Pay attention to see if the documents are complete: >>>More

7 answers2024-07-14

The steps and methods of water and electricity decoration of the blank room are as follows: >>>More

4 answers2024-07-14

The construction acceptance of the paint can also be seen from some small details. >>>More

6 answers2024-07-14

The first is the acceptance of certificates: when the developer delivers the commercial house, it should show the buyer the "Record Registration Certificate for the Completion and Acceptance of the Commodity Housing", and the "Housing Quality Assurance Certificate", "Residential Instruction Manual" and the measured area report of the house must be provided to the buyer; If the above relevant information is not presented, the buyer may refuse to accept the house and complain to the construction administrative department. The second is on-site acceptance >>>More