What tools do you need to decorate the door frame and how to decorate the door frame

Updated on home 2024-07-15
3 answers
  1. Anonymous users2024-02-12

    1. Prepare tools: hammer, ruler, wood (brick) block, rope, pencil, Matson force door cover, special sturdy.

    connectors, etc. 2. Remove the plaster: Before installation, remove the old powder or lime at the place where the wooden bricks need to be set up, and leave the original brick wall.

    or concrete walls.

    3. Sleeve board combination: Place the sleeve board on the ground, fix it with special connectors, and then pull the vertical line calibration.

    Positive size, and vertical triangle correction through angle bracket fixed.

    4. Vertical sleeve board: Before standing the sleeve board, the wall and the inside of the sleeve board at the wooden brick place must be coated with special glue, and then the sleeve board should be put into the door opening and the position and verticality should be corrected.

    5. Place wooden bricks: coat the wooden bricks with special glue, pad the position of the sleeve board and the wall, and use small nails.

    Wooden bricks are fixed with sleeve boards.

    6. Install the door edge: After the styrofoam cures (generally 2-3 hours), dismantle the triangle on the sleeve board.

    Bracket, after blanking the actual door edge line size, apply special glue to the groove of the sleeve, and then connect the door edge line with the door sleeve.

    The plate is gently tapped. (If the door edge line and the groove fit loosely, you can use the inside of the door edge line to plug tightly).

    7. Install the door leaf.

    Harbin Songbird Decoration is ready to answer your questions about decoration.

  2. Anonymous users2024-02-11

    Tools used: electric hammer, small electric saw, hand electric drill; Hand tools include: wire cones, angles, hammers, screwdrivers, pencils, and more! Thank you!

  3. Anonymous users2024-02-10

    Methods and key points of decorating door frames:

    Door frame installation is the basic construction technology of decoration, and a good door frame construction technology will reflect the detailed decoration design of the room. The construction process of door frame installation is mainly divided into two types: first vertical installation construction and rear plug installation construction. The door opening should be set aside according to the location and size of the room decoration drawing, and the opening is 16 20 mm larger than each side of the room door; When installing, first stuff the door frame into the door opening, the wooden wedge is temporarily fixed, after the line hammer and the level are corrected, nail it firmly, each wooden brick should be nailed with two nails, and the nail cap is smashed flat and rushed into the mullion.

    Lack of work for the installation of the mold sail at the first stand: before the decoration at the standpoint, the center line and edge of the door frame should be drawn to the ground and wall according to the decoration drawings, and then the door frame should be erected in the corresponding position, supplemented by support. The elevation should then be checked so that it can be corrected at any time; The support should not be dismantled prematurely, and should be dismantled after the wall is built; The door frame of the same wall should be installed neatly, and the door frame at both ends can be erected first, and the other frames should be erected according to the through line, so as to ensure that the position and elevation of the door frame in the same row are consistent.

    Rear plug installation construction: The installation of the rear plug brings certain difficulties to civil construction, and the size of the reserved door and window openings for civil construction must be accurate. Aluminum alloy doors and windows are framed first, and then sashed.

    This part of the installation mainly includes aluminum alloy casement doors, aluminum alloy casement windows, and aluminum alloy shutters. The door opening should be set aside according to the location and size of the room decoration drawing, and the opening is 16 20 mm larger than each side of the room door; When installing, first stuff the door frame into the door opening, the wooden wedge is temporarily fixed, after the line hammer and the level are corrected, nail it firmly with nails, each wooden brick should be nailed with two nails, and the nail cap is smashed flat and rushed into the mullion.

Related questions
6 answers2024-07-15

Wireless routing is the same as ordinary routing, but there are more wireless signals, so that devices with wifi function can be connected wirelessly. >>>More

4 answers2024-07-15

Page similarity detection tool.

Check the similarity of two pages (penalties may be imposed if the similarity is more than 80%) >>>More

12 answers2024-07-15

It depends on what grade of road you are constructing, and high-grade roads generally use synovial membrane. >>>More

5 answers2024-07-15

1. The technical design is different

After the new console Xbox One, the world's attention is all focused on the performance and user service of the new console, but in addition to the console, I believe that the biggest attention of the original Xbox 360 players is the Xbox One controller. >>>More

6 answers2024-07-15

If you want to learn systematically, you can consider signing up for a live online class, and recommend CGWANG's online class. The teacher speaks carefully, you can watch it back after the class, and there are also the same type of recorded classes that you can learn for free (give away lifelong VIP). >>>More