What are the documents before the start of construction, and where can I find them?

Updated on society 2024-07-17
10 answers
  1. Anonymous users2024-02-12

    1. Project commencement report, construction permit, construction organization design, materials and equipment for review.

    2. Concrete mix ratio design and material inspection.

    3. On-site acceptance. Temporary facilities (schemes), safe and civilized construction preparations.

    4. Engineering survey and positioning records.

    Should be all prepared:

    Basic information table of construction projects.

    Construction approval materials (vertical approval documents required from the construction unit).

    Construction project planning permit (planning permit required from the construction unit), notice of winning the bid for the construction project (notice of winning the bid from the construction unit), construction contract (construction contract required from the construction unit).

    Supervision contract (supervision contract to the supervision unit).

    A copy of the qualification and personnel certificate of the construction unit.

    Copies of project supervision institutions and relevant certificates.

    A copy of the qualification and personnel certificate of the design unit.

    A copy of the qualification and personnel certificate of the survey unit.

    Copies of project construction institutions and related certificates (including qualification certificates, personnel employment certificates (constructors, budget officers, quality inspectors, safety officers, material personnel, labor insurance personnel, surveyors, samplers, data personnel, drainage, heating, electrical engineers, project managers).

    Drawing triage records and design change documents.

    Design documents and design changes before the start of construction.

    Construction site quality management inspection records and schedules.

    1. A package of quality responsibility system.

    2. The main professional types of work operation certificate (tower crane, scaffolding worker, gantry, electric welder, butt welder, straight rib, electroslag welder).

    3. The qualification contract of the subcontractor.

    4. Construction drawing review (construction drawing review certificate).

    5. Geological survey documents.

    6. Construction organization design, construction plan and approval.

  2. Anonymous users2024-02-11

    A lot of the information is provided by Party A.

  3. Anonymous users2024-02-10

    The start of a project requires three parties to prepare materials, namely construction, supervision and construction.

    First, the supervision unit preparation.

    1. Establish the entrustment contract (copy) and review it;

    2. The analysis conclusion of the construction unit's contract;

    3. The appointment and authorization of the director of the construction project by the supervision company;

    4. Composition and division of labor of the project supervision department;

    5. The approved supervision plan of the project;

    Second, the construction unit is ready to cover up suspicions.

    1. Construction project planning permit (including attachments);

    2. Review form for the commencement of the construction of chain bridge project;

    3. Construction project commencement certificate and construction permit;

    4. Notice of inspection of the red line of the building issued by the planning department;

    5. Specific supervision business procedures handled by the designated supervision agency;

    6. Design drawings and design documents reviewed and approved by the construction administrative department;

    7. Notice of winning the bid for the project (copy);

    8. The winning bid price of the project;

    9. Construction contract (copy);

    10. Original data such as leveling points and coordinate points;

    11. Engineering geological survey report and hydrogeological data;

    12. The representative of the construction unit on the site and the power of attorney;

    13. Construction drawing review and filing certificate for construction projects;

    14. Minutes of drawing review.

    15. If the project is allowed to be subcontracted according to law, the qualifications of no less than three subcontractors shall be provided as far as possible, so as to jointly study and determine the subcontractor;

    16. The agreement signed between the construction unit and the relevant departments.

    3. Preparation of the construction unit.

    1. Qualification certificate, business license and registration number of the construction unit (copy);

    2. National enterprise grade certificate and credit rating certificate (copy);

    3. Construction enterprise safety qualification examination and approval certificate (copy);

    4. Certificate of enterprise legal person (copy);

    5. Quality system certification;

    6. Laboratory qualification certificate provided by the construction unit (copy);

    7. Notice of winning the bid for the project budget (copy);

    8. Qualification certificate and employment certificate of project manager, chief engineer and management personnel (copy);

    9. Special operation worker's certificate (copy); Special operations include: electrical work, boiler stoker, pressure vessel operation, lifting mechanism operation, blasting operation, metal welding (gas cutting) operation, motor vehicle driving, motor ship driving, marine engine operation, construction elevated, coal mine underground gas detection, etc.

    10. The construction organization design (construction plan) of the self-examination procedures of the project is complete, and the person in charge of each department is visaged, and there are targeted and special measures (such as winter and rainy season construction);

    11. The name, specification, model and quantity of the first batch of construction machinery and equipment listed in the construction organization design (construction plan) according to the construction progress;

    12. The review record of the level point and coordinate point provided by the construction unit;

    13. Construction site quality management inspection records;

    14. Report on the commencement of construction projects;

    15. If the project is allowed to be subcontracted according to law, the qualification level and performance of the subcontractor shall be provided so that the relevant departments can study and select and determine.

  4. Anonymous users2024-02-09

    According to our Construction Law

    Article 7. Before the start of the construction project, the construction unit shall, in accordance with the relevant provisions of the state, apply to the people's construction administrative department at or above the county level where the project is located to obtain a construction permit; However, the exception is for minor works below the limit determined by the construction administrative department. Construction projects that approve the commencement report in accordance with the authority and procedures specified in the *** will no longer receive a construction permit.

    Before the start of construction (with the information of the conditions for the start of construction): construction permit (provided by the construction unit), construction pure tremor organization design (including application form, approval form), construction report (application for review), engineering geological exploration report, construction site quality management inspection record (for review), quality personnel qualification certificate (collection and review), special type of work certificate (collection and review), measurement and pay-off (rotten stove for review).

    The construction permit is a document issued by the competent administrative department of construction to approve the commencement of construction projects, it has a certain legal effect, and all construction projects that should be applied for a construction permit in accordance with this law cannot be started without a construction permit. At the same time, it also stipulates that certain conditions should be met for applying for a construction permit.

  5. Anonymous users2024-02-08

    1. Notice of winning the bid for construction; 2. Construction general contracting contract, 3. Construction permit, 4. Construction drawing review approval, 5. Engineering quality supervision registration form, safety supervision registration form, 6. Construction organization design, construction plan, technical disclosure, safety disclosure, 7. Construction qualification review, 8. Commencement report.

  6. Anonymous users2024-02-07

    The materials required for the start of the project include qualification review, construction organization design, commencement review, commencement report, technical disclosure, safety disclosure, etc.

  7. Anonymous users2024-02-06

    The construction unit needs to get it done 1,

    Planning permit for construction works (including annexes);

    2. Construction project commencement review form;

    3. Construction permit for construction projects;

    4. Notice of inspection of the red line of the building issued by the planning department;

    5. Specific supervision business procedures handled by the designated supervision agency;

    6. Design drawings and design documents reviewed and approved by the construction administrative department;

    7. Construction drawing review and filing certificate of construction project;

    8. Minutes of drawing review;

    9. Construction contract (copy);

    10. Original data such as leveling points and coordinate points;

    11. Engineering geological survey report and hydrogeological data;

    12. Letter of authorization from the representative of the construction unit on the construction site;

    13. The agreement signed between the construction unit and the relevant departments.

    The construction unit needs to get it done.

    1. Construction enterprise qualification certificate, business license and registration number;

    2. National enterprise grade certificate and credit rating certificate;

    3. Safety qualification examination and accreditation certificate of construction enterprises;

    4. ** certificate of enterprise legal person;

    5. Quality system certification;

    6. Laboratory qualification certificate of the construction unit;

    7. Project pre-bidding document and project bid price schedule;

    8. Qualification certificate and employment certificate of project manager, chief engineer and management personnel. (All the above materials are photocopies).

    9. Examination form and copy of employment certificate for special types of personnel in construction projects. (Safety officers and electricians must hold dual certificates of construction industry and labor department).

    10. Review records of leveling points and coordinate points provided by the construction unit;

    11. Submit and approve the construction organization design, and the construction organization design plan;

    12. Construction site quality management inspection records;

    13. Report on the commencement of construction projects.

  8. Anonymous users2024-02-05

    1: Project application report and approval.

    2: Feasibility study report and approval.

    3: Environmental Impact Report or Environmental Impact Report Form or Environmental Impact Registration Form 4: Annual Plan of Fixed Asset Investment Project.

    5: Approval of construction land.

    6: State-owned land use certificate and attached drawings.

    7: Demolition compensation and resettlement agreement.

    8: Construction land planning permit and drawings.

    9: Engineering geological survey report.

    10: Hydrogeological Survey Report.

    11: Construction project survey record book.

    12: Planning and design documents.

    13: Preliminary design, technical design drawings and descriptions.

    14: the relevant administrative departments (civil air defense, environmental protection, fire protection, cultural relics, etc.) approval documents or agreements 15: construction drawing design documents review opinions.

    16: Survey and design contract and notice of winning the bid.

    17: Construction contract and bid winning notice.

    18: Supervision entrustment contract and notice of winning the bid.

    19: Construction project planning permit.

    20: Construction project application review book.

  9. Anonymous users2024-02-04

    1. Project commencement report, construction permit, construction organization design, materials and equipment for review.

    2. Concrete mix ratio design and material inspection.

    3. On-site acceptance. Temporary facilities (schemes), safe and civilized construction preparations.

    4. Engineering survey and positioning records.

    5. Construction project planning permit (including attachments);

    6. Notice of building red line issued by the planning department;

    7. Engineering geological survey report and hydrogeological data;

    8. The design drawings and design documents approved by the drawing review company approved by the construction administrative department; 9. The reference point (leveling point) provided by the planning department;

    10. Basic measurement results such as coordinate points;

    11. Construction permit for construction projects;

    12. Building energy conservation record registration form;

    13. Construction drawing fire audit certificate;

    14. Construction contract (copy);

    15. Specific supervision business procedures handled by the designated supervision agency;

    16. Resident representative and authorization of the construction unit;

    17. The agreement signed between the construction unit and the relevant departments (testing, testing, monitoring, etc.).

    Supplement: Construction site quality management inspection records and schedules:

    1. A package of quality responsibility system.

    2. The main professional work operation certificate (tower crane, scaffolding worker, gantry, welder, butt welder, straight ribbing, electroslag.

    3. The qualification contract of the subcontractor.

    4. Construction drawing review (construction drawing review certificate).

    5. Geological survey documents.

    6. Construction organization design, construction plan and approval.

  10. Anonymous users2024-02-03

    Construction techniques.

    1. Commencement conditions:

    1. Check whether the planning permit, building land approval procedures and other materials of the construction project are complete;

    2. Check whether the construction permit has been obtained before the start of construction, and whether the content of the construction permit is consistent with the content of the project contract;

    3. Check whether the date of the commencement report is consistent with the date of the construction permit.

    2. The project management team is equipped with:

    1. Check the construction management personnel of the project department in place according to the list of management networks in the approved construction organization design;

    2. Check the validity of the certificates and certificates of the project manager, technical leader, constructor, quality officer, safety officer, data clerk and other personnel.

    3. Construction organization design and special plan:

    1. Check whether the preparation, review and approval procedures of the construction organization design are complete;

    2. Inspect the preparation and approval of special construction plans for deep foundation pit support, pile foundation, earthwork, large-volume concrete, formwork, prestressed concrete, roofing, waterproofing, decoration, installation and other projects;

    Roofing engineering construction plan, environmental protection plan.

    Formwork special construction plan, large-volume concrete construction plan, waterproof engineering construction plan, measurement plan.

    Special construction plan for seasonal construction.

    3. Whether the special construction plan for the safety of the project with greater risk has been reviewed by experts;

    4. Inspect the construction organization design and the implementation of each special construction plan.

    4. Review of construction drawings

    1. Check whether the construction drawing design documents have been approved by the competent department for the review of construction drawings;

    2. Check whether the construction drawing review report, drawing self-review, review minutes and other data collation are timely and effective;

    3. Check whether the records, materials and procedures for modification, change and negotiation of construction drawing design documents are complete.

    5. Construction technical standards:

    1. Inspect the implementation of the quality management system and construction quality inspection system and evaluation and assessment system of the project department;

    2. Check whether the corresponding standards, norms, procedures and mandatory provisions of the project department are complete and effective;

    3. Check whether the enterprise standards and management systems are complete.

Related questions
20 answers2024-07-17

Characteristics of garlic:

Garlic is a fibrous root system, and the main root groups are concentrated in the topsoil layer within the range of 25 cm, and the transverse root is within the range of 30 cm, and the root system is shallow and the root quantity is less. During the vegetative growth period, the stems are shortened and disc-shaped. After differentiating the flower buds, flower sprouts are extracted from the tip of the stem plate, but do not bloom, or only small purple flowers are produced without seeds. >>>More

5 answers2024-07-17

Friend, I'm a person from the past, I'll give you a few suggestions, the first textbook definition and example questions are all done, and they are particularly proficient, and the cultivation is the feel of doing the questions rather than being limited to doing them, because this is a special book is not anything else, the special book is to be an excellent rate, efficiency, and the correct rate, so you must do the question to have a feel as soon as you see the question, you have to know what knowledge to test, what method to use, start directly, this is a high number, English, you will find out the real questions of the past four or five years, do you know the real questions, It's not a mock question, do the real question, and then memorize the real questions skillfully in the past few years is not a question, because each set of English real questions contains more than 70% of the vocabulary required by the exam syllabus that year, as well as the test center, so every exam is the same knowledge point just a different method, including the composition also to memorize, although the test has to be memorized, the memorization is the method, especially proficient recitation, do you know that I will memorize this real question in the last two weeks, and it is not particularly proficient from about 40 points to 75 points, Although the score is not high, but it has reached my highest record, I have never had this result in school, the following is to do the question, you just buy a set of more suitable test questions (I use Tianyi Education) that test paper I did it 3 times and browsed twice, I scored 90 points in the high math test, so you must see through a set of test papers thoroughly, not to finish the work, there is such a set of test papers, plus the textbook is enough, the questions are not more but fine, plus the later stage of the exam to send you an exam syllabus There are two sets of exam mock questions, You see, because that's the latest development, if there is a new type of mock question, you can solve it immediately, learn ideas and methods, I'm from science and technology, so I don't know much about politics, but the English method can be moved up, and the mathematics can be moved up, and the professional course will rely on your own ability, okay, the senior will say this, if you have any questions, then ask it!

9 answers2024-07-17

Hope for Jackie Chan

Dragon and phoenix species: Longde in the field: >>>More

10 answers2024-07-17

Now it seems to be used for washing the face or applying makeup, and it is said that it has a whitening effect, but before using it, it is necessary to soak it in warm water for 2 hours, and then put on the fingers to wash the face and apply makeup, to be honest, I don't think the effect is very good, and it is troublesome, this is my personal opinion.

9 answers2024-07-17

Baby Babe - Sun Meng.

Homesick song - made by Yi people. >>>More