You must know that before opening a store, there is still a lot of work to prepare, so that the effect of the store can be better. Let's introduce you to floor leveling? Do you want to level the floor, if it is a floor tile.
There is no need for leveling, it can be leveled on the edge of the floor tiles, which not only saves time, but also saves costs. If it is a wooden floor, it needs to be leveled in advance.
<> if the floor is uneven, it may make a sound during future use, and the service life of the floor will also be affected. Before leveling the ground, we should do some preparatory work first, otherwise it will bring some unnecessary trouble, if the ground is wet with water, it can prevent cement mortar.
Absorbs water too quickly, resulting in some hollowing.
The cost of the works and materials is about 35 yuan per square meter. As for the leveling effect, I believe that friends with decoration experience should have a deep understanding, that is, no matter what the mason master did at the beginning, I feel that there are still some problems with leveling. Although the effect of being paved opposite is not great, since I have spent money, I have not done a good job, but I am still a little uncomfortable when I meet.
Floor tiling must be familiar to everyone, it is a general term in the process of tile shop plastering the floor. Ground leveling is the premise of tiling, because the tile is not sticky on the uneven ground, so it is necessary to level the ground in advance, so that the ground foundation is flat, so that the tile is firmly glued to the ground, so the ground leveling is before the tiling.
Do a detailed interpretation of the problem, I hope it will help you, if you still have any questions, you can leave me a message in the comment area, you can comment with me more, if there is something wrong, you can interact with me more, if you like the author, you can also follow me, your like is the biggest help to me, thank you.
-
Before laying floor tiles, the ground must be leveled, because in this way, the floor tiles can be laid very smoothly, and there will be no uneven situation of laying floor tiles, and the floor tiles can be durable and very easy to take care of.
-
The ground definitely needs to be leveled, because if the ground is not leveled before the floor tiles are laid, there will be unevenness after the floor tiles are laid, and the gaps will be too large, which is seriously unsightly.
-
Required; In this way, the floor tiles can be laid flat, and the cement below can be flexibly increased and reduced while laying the bricks, which is very beautiful.
-
The ground also needs to be leveled before laying floor tiles; Because only in the state of relatively flat ground, the protruding floor tiles are relatively flat and will not be uneven.
-
Before laying floor tiles, the floor can be leveled without leveling. If it is a floor tile, it does not need to be leveled, it can be leveled when the floor tile is pasted, which not only saves time, but also saves money. If it is a wooden floor, it needs to be leveled in advance, if the ground is uneven, it may make a noise during future use, and the service life of the floor will also be affected.
1. How to level the ground? Cement mortar leveling: suitable for all kinds of ground, all kinds of floor before the ground leveling.
The leveling thickness is too thick at 25 35mm, if the cement mortar ratio is not right, the surface layer will be pulverized and sanded, ash and cracks. The floor (composite floor) forms some gaps with the screed, and after people step on it, the dust on the ground is dispersed around, and then it escapes from the expansion joints and spreads out through the gaps in the baseboard, forming the phenomenon of dust. In addition, the cement mortar is not leveled in a detailed place, and there will be a hollowing phenomenon.
2. What should I pay attention to in ground leveling? 3. Summary.
-
First, a simple way to level the ground.
1. Before construction, it is necessary to moisten the wet surface and keep it in a state without open water. Check the flatness of the ground to ensure that the base surface is firm and free of dents and cracks. After that, the base surface is cleaned to remove debris, sand, dust and other substances.
2. Use the roller dipped in the interface agent to seal the construction base surface. Brush evenly to ensure full coverage and apply two coats.
3. After the construction of the interface agent is completed, it is necessary to wait for 1 to 3 hours to maintain natural ventilation, and wait for the interface agent to be completely dry before doing self-leveling construction.
4. Prepare a large enough bucket to stir the water and gypsum powder according to the mixing ratio, and use an electric mixer to stir it. Stir until it is homogeneous and fluid, without clumping and particles.
5. The stirred self-leveling should be used within two hours as much as possible. The self-leveling cement is poured on the ground, and then the self-leveling cloth is evenly distributed with a rake and rolled with a roller to release the air.
6. According to the different temperatures, humidity and ventilation conditions, gypsum self-leveling needs 36-48 hours before it can be completely dried, and the next step of construction cannot be carried out before drying.
Second, the ground leveling quality control measures.
1. Before laying the leveling layer, the base should be cleaned and washed with water. When laying, there shall be no water accumulation in the base layer.
2. Gypsum mortar is best mixed mechanically, such as manual stirring, it must be stirred evenly. The construction should be smoothed with the paving, and the smoothing work should be completed before the initial setting of the gypsum.
3. When the surface of the base layer is smooth, it should be chiseled into a rough surface to facilitate firm bonding. When laying, brush a cement slurry first, and should be self-leveling with the plaster with the brush.
-
Yes, gypsum construction can be used, or leveling through the laying of cement slurry to ensure the flatness of the ground and avoid cracking.
-
Yes, only leveling the floor can make the floor tiles more flat and look more beautiful; I think you can use plaster floor leveling, which is more efficient, and the drying speed is relatively fast, so it will not have any effect on the surrounding height.
-
It is necessary to level through the construction skills or the laying of cement slurry, and be sure to choose good quality floor tiles, so as to avoid deformation.
-
Do I need to level the floor tiles before laying them? First there is water and electricity, then there is underfloor heating. Floor tiles can only be placed stably if they are at least 3 cm thick.
Therefore, it must be carried out during the leveling process. Even if the original soil is well leveled, it must be leveled. Otherwise, after the floor is laid, it will be slightly smaller than the piso tiles in other rooms, and steps will appear.
When paving floor tiles, adjust a small series of tiles, remind us that we must measure the flatness of the floor before paving floor tiles, and can only be installed normally after reaching the standard, whether it is paving tiles or tiles, we should pay more attention to the ground elevation, especially the thickness of the underground ash layer of sanitary pipes.
There is no need to level to a tiled floor. It can be leveled with turf bricks, which saves time and money, and if the floor is paved with wood, it needs to be leveled in advance. If the ground is uneven, the plan is to lay bricks on the ground.
The key to whether the floor tiles are flat or not is to level the ground. Some houses have floors that are not flat enough, so you need to level them first when renovating. Don't underestimate this connection.
There are strict technical requirements for construction personnel. Do you want to level before laying tiles? Personally, I don't think it's necessary, because I've seen it with my own eyes.
Even though there was a 10 cm difference in height between the floor of some friends' houses and the entry threshold, Mason did not do the leveling. In general, floor tiles do not need to be leveled as they can be leveled as the bricks fall. The following water bricks have dry floor method and frosted floor method, few people see that the secondary leveling must be carried out before laying the bricks, and the meaning of the estimated secondary leveling is not clear, and the mud slurry can be flexibly increased or decreased.
In addition, since the parquet needs to be leveled first, the floor laid with solid Madeira Piso does not need to be leveled.
When installing reinforced laminate flooring, bamboo and wood parquet, water and electricity, and floor heating should be placed at least three centimeters. Before laying the floor, it should be leveled so that the effect can be laid and the use of the floor will be extended. If it is not flat, there will be cavities underneath the piso, the soil will be irregular, and the floor above will not be solid.
After a long time, the flatness of the floor should be measured before the total PISO and floor are placed, and the specification can be reached before normal installation can be carried out. Whether laying hardwood floors or tiles, care should be taken to soil leveling, especially in sanitary facilities.
-
The setting time, strength development and moisture content of the ground cement leveling material are determined. It is recommended to spend more than a week on the regular decoration of the leveling floor, so that the screed layer can be fully maintained, and the moisture in the volatile pores with better growth strength can make the ground dry, smooth, clean and sand-free before paving.
1. The ground should be leveled with mortar, and the elevation should be equal, if a house is all used, it is relatively better, the living room floor tiles, and the bedroom floor should be accurately determined according to the thickness of the floor and the elevation of the living room floor tiles, otherwise there are steps at the joint. The following auxiliary materials must be paved flat.
The place of the interface must be done well, and if it is silica gel bonding, it must be cleaned after it is dry.
2. The floor can not be too tight or too loose, the laminate floor needs to be leveled first, and the laminate flooring business will generally lay a layer of moisture-proof, and the keel is played below the solid wood floor, and the flatness requirements for the floor will be relatively low.
-
Tiling floor tiles generally do not need to be leveled on the ground, because while laying bricks can be leveled, the following cement mortar can be flexibly increased or decreased, and because of the first hydropower, then floor heating, to lay at least 3 cm thickness, the floor tiles can be laid safely, so when paving the floor tiles, by adjusting the thickness of the dry ash layer laid under the tiles can be leveled.
-
Today, I will answer to you, do you need to level the wooden floor before laying it. With the continuous improvement of the economic level, most of the furniture today is basically paved with flooring. This flooring has become everyone's first choice for decoration materials.
But laying the floor is not that simple, and there are many things to pay attention to. So, the following will take you to see if you need to lay the floor and level, and then lay the floor to understand the precautions. Is the floor to be leveled, and the floor is leveled, which is an important prerequisite to ensure the use of the floor.
Many people ignore this project and do not find a flat place to install the floor. Eventually, when the floor is used, the lock will be broken, and there will be dust in the corner. This process may seem simple, but it has a great impact on how well the floor is placed.
Precautions for laying floors, pay attention to the moisture of the cement floor when laying wooden floors, and keep the ground dry. If the moisture on the cement surface is not cleaned before paving, some moisture will be generated after paving, resulting in cracking of the floor, and the floor will warp after installation.
Investigate the direction of the floor first, and leave gaps in special places. In general, it is best to place the entire room in the direction from the other end of the room and then slowly turn to the other side. The assembled model should be done well for laying the floor, and special care should be taken to cut the floor.
The first few rows of flooring are usually used as the standard before paving, and the main purpose of this is to ensure that the entire floor is paved. Therefore, the first few lines of packaging must be done well, and the mated model must also be done well. In this way, the subsequent packaging work can be carried out smoothly.
-
Yes, it needs to be leveled, because then it will be better to lay the planks.
-
It needs to be leveled, so that it will be very convenient, and it is also very good-looking, and it will not cause unevenness, so it needs to be leveled.
-
It needs to be leveled, because it will be very convenient, and there will be no sequelae in the future, so it needs to be leveled, and it will not fall, and it will not be uneven.
When laying floor tiles in the living room, a room is particularly bright, and easy to clean, both environmentally friendly and safe, very practical, but it is relatively not resistant to dirt, and it is easy to break if it is not handled properly, and the wooden floor texture is better, good anti-slip, and quite natural, giving people a strong humanistic hee, and warm in winter and cool in summer, very comfortable, but after a long time it will appear moldy, and even turn up, it is particularly troublesome to replace, and it is particularly difficult to clean, and it is more expensive.
Precautions for flooring.
1. Overall trial paving: adjust the color difference of the floor. The floor with the same pattern and color can be placed in the living room, aisle or obvious place, and the slightly different ones can be placed under the furniture or in the corner, so as to achieve the overall aesthetic coordination. >>>More
You can use waterproofing agent, waterproofing agent is colorless permeability, waterproofing agent sprayed on the surface of the tile without any change, but the waterproof effect is particularly good, sprayed with waterproofing agent on the surface of the tile will form water droplets, water will not penetrate into the inside, in addition to the ground seepage from the brick joint, the brick joint is generally filled with cement or white cement, caulk, these three materials have no waterproof effect, so the brick joint is repaired with caulking paste, so the problem of water seepage in the brick joint is completely solved. There are also many bathrooms in the decoration, the gap between the ground and the wall is particularly large, which is also the place with the most water seepage, you need to use plastic steel mud to make waterproof edges, plastic steel mud is viscous, waterproof effect is good, once and for all. These three materials are produced by Shenyang Yijia Building Materials. >>>More
Tile repair fluid is an effective repair agent specifically for tile scratches. You can check it on the Internet, and the repair effect is still relatively obvious. If there are small pits in the tile, consider filling the pit with nail polish and then waiting for it to dry and wipe off the surface. >>>More
1.You can paint moisture-proof paint, but the effect is not so good. And it's easy to break. >>>More