-
Should hydropower go to the top or to the ground? What is the difference between the two? This kind of method is used by many people to feel that the construction of the project is simple, and the bill of quantities is not very large, so it will save some money. But this kind of method also has disadvantages, the first is that if the water pipe seepage is not easy to find, it is basically the downstairs next-door neighbor's roof flooded, and the next-door neighbor came to the door only to find out that it was their own home water seepage, and the damage would be higher if it was not discovered and repaired as soon as possible.
In addition, even if you deal with it in time, it is particularly cumbersome to overhaul it, first of all, it is difficult to determine which underground water pipe is leaking, but it is buried in the field. Therefore, the pavement has to be completely planed off, and sometimes the seepage point is not at the wet point, so it is necessary to smash the pavement again. It took a lot of trouble to find the seepage point, dismantle and repair it, and then refill the floor tiles and pave them again.
It will cost a lot of money to pave the pavement from planing, and if it causes damage to the downstairs neighbors, the cost of compensation plus the cost of maintenance is quite high. This is the disadvantage of hydropower projects going to the top.
Let's talk about hydropower topping, hydropower topping will increase some costs compared with topping, line topping pipelines will be more, engineering construction is more complicated than topping, so the construction cost may be a little more expensive than topping. The water pipe cable is laid underground, and the head of this water pipe is particularly thick, is it higher to find the ground level? Floor tiles are not to be pasted two or three centimeters high.
The pavement of the kitchen and bathroom is improved, and the concrete floor of each room and the large living room is also raised, and the level is improved, so will it cost more? From this point of view, it is not easy to lead to this situation when the line goes to the top, and the cost is not too high.
There are also hydropower projects buried in the ground, once the water seeps, the first worry is the water pipe, even if the sewer pipe bursts, in other words, the water seeping in from the window edge, you also think that the sewer pipe is only planed. If the water pipe is topped, you are unlikely to have this suspicion, and it is possible to find something else, and it is likely that you will find it right away. In addition, there is actually a safety problem when the electricity is buried in the ground, and there are more tap water in the cupboard, and if the cable is damaged, is it not very risky, naturally such a thing is not very widespread, but even if it is a millionth risk?
Is it all risky? What can be prevented needs to be minimized.
-
You can go to the top, the main difference is that the safety factor is not the same, the cost is different, and the time required for decoration is different.
-
If the budget is not particularly large, you can choose to go to the ground, the budget is sufficient, the floor height is appropriate, you can choose to go to the top.
-
Yes, the difference is that the wiring is different. Walking on the ground is easy to install and safe to construct, but the disadvantage is that it is very troublesome to repair if there is a water leak. It is difficult to go to the top for decoration, and there are many materials, but the maintenance in the later stage is simple.
-
1. Hydropower walks from the ground:Advantages: materials and construction costs are relatively economical, construction is convenient, and the construction period is short;
Disadvantages: If there is a problem, it is difficult to repair in the later stage, and the maintenance cost is high.
Hydropower walks on the ground).
2. Hydropower goes from the topAdvantages: easy to find and find problems, convenient for later maintenance;
Disadvantages: The material is used relatively more, and the cost is a little more.
Hydropower goes to the top).
Judging from the actual effect and follow-up feedback, hydropower is better than going to the ground as a whole.
-
Of course, it is underground, if you think about it, in the short term, it will not be a problem, but once it is after a long time, and when there is aging, if it is above, it will inevitably cause leakage, and at this time, it will cause damage to the building materials of the ceiling due to the gravity of the water, so it is recommended to be underground instead of top.
-
1.Water goes to the sky, electricity goes to the ground.
2.It is much easier to inspect and repair in the later stage of the water walk, and it is not easy to repair if there is a problem.
3.If the circuit goes to the ground, it will be more convenient when wiring, and it will not cause damage to the wall, and at the same time, the underground line can better realize the active line, save the height of the space and do not use a large area of the ceiling, and save the cost of decoration to a certain extent.
-
Water and electricity are best walked up, and it is troublesome to go to the ground for maintenance and repair.
1. The benefits of going to the top: Whether it is the aging of the pipeline or the aging of the circuit, it is very easy to replace and maintain.
2. If you can't go to the top, you can get from the wall, although the later repair and maintenance is not very easy to do, but it is only a small project, there will not be much action, and it will not be so painful to move.
3. If you go all the ground, you can imagine that you have to lift up all the floor tiles and floors when you are repaired, and you can make up that picture in your brain.
Therefore, the decoration should try to transform the bookstore from the top, and it is convenient to repair it slightly, so it will not be a big deal.
-
Both have their own advantages and disadvantages, and I personally think it's better to go to the top.
Overhead laying: advantages: 1, beautiful 2, easy to maintain 3, to avoid downstairs decoration damage Disadvantages: 1, installation is inconvenient, work at height and need to set up brackets 2, lintels and other places are not easy to save space, need to open holes.
Above-ground laying: advantages: 1, easy installation 2, high efficiency 3, relatively short of time: 1, inconvenient maintenance 2, pipeline crossing is not easy to deal with 3, or need to open a groove.
Hydropower decoration to go to the ground or to the top? Don't dwell on it, it's the right way to do it. >>>More
Housing decoration, water and electricity to go to the top or the ground? What are the advantages and disadvantages of walking to the top and going to the ground? Advantages and disadvantages of home renovation water and electricity topping: >>>More
Hydropower renovation is a must-do renovation project for every household, and when arranging the circuit wiring, it is divided into the ground and the wall. When decorating a new house, we should pay attention to not only the beauty and comfort of the home, but also the safety performance of some hardware facilities, especially the decoration of water and electricity at home is a very important thing, the living room and other dry rooms, about 300 socket wiring from the ground should go to the ground, with the shortest distance wiring, the circuit turn as little as possible three, some decoration companies to horizontal and vertical as the reason around the corner of the wall. >>>More
Home improvement to water and electricity, line pipe to the ground and the top have their own advantages and disadvantages, the choice should be decided according to the specific situation. >>>More
We will always have such and such questions when decorating the house, but as long as we do our homework well before decorating the house, we can avoid many detours. Just like the subject asked, in the process of installing the house, the water pipe is on the ground or the top, so I will answer it below. >>>More