    Home improvement to water and electricity, line pipe to the ground and the top have their own advantages and disadvantages, the choice should be decided according to the specific situation.

    If you want to know the specific decoration**, you can use the "decoration artifact" ** device to calculate, just enter the area + city, immediately calculate the local decoration**, list the detailed list of 102 decorations, so that you don't have to worry about overspending on the decoration, click here to start calculating: [3 seconds to get the local decoration**].

    The advantage of walking the ground is that it is easy to install, there is no need to break the ceiling, and for owners who live in high-rises, it is more worry-free and labor-saving. In addition, the cost of walking the land is relatively low, generally between 100-200 yuan per square meter.

    However, there are some drawbacks to going to the ground. First of all, walking on the ground will take up ground space, which may affect the use of space for smaller houses. Secondly, the line pipe that walks the ground is easily damaged by external forces, such as the movement of furniture or the construction of the ground, which is easy to cause damage to the line pipe and needs to be repaired.

    In contrast, the advantage of walking to the top is that it does not occupy floor space, and the conduit is hidden in the ceiling, which does not affect the indoor use space. In addition, the line pipe that goes to the top is relatively safe and not easily damaged by external forces. However, the cost of going to the top is relatively high, generally between 200-300 yuan per square meter.

    In addition to the cost of wire pipes, home improvement to water and electricity also involves other costs, such as the cost of water pipes, wires, switches and sockets and other materials, as well as labor costs. According to the local market price, the cost of water pipes, wires and other materials is generally between 5-10 yuan per meter, and the labor cost is generally between 100-200 yuan per square meter.

    To sum up, there are advantages and disadvantages of home improvement to water and electricity, and the choice should be decided according to the specific situation. In terms of cost, the cost of walking the ground is relatively low, generally between 100-200 yuan per square meter, while the cost of going to the top is relatively high, generally between 200-300 yuan per square meter. In addition, there are other material and labor costs to consider.

    Tuba Rabbit is one of the largest decoration platforms in China, with a total of more than 41 million owners, 110,000 decoration companies, covering more than 300 cities across the country, user reputation is very good, not only to meet your decoration needs, but also to provide professional decoration companies according to your budget, want to find a good company, learn more about decoration knowledge on Tuba Rabbit, click here, free 1 to 1 for your home decoration services: [Tuba Rabbit ** official website].

    Kunming - [Kunming Decoration Strategy Guide].

    Suzhou - [Suzhou Decoration Strategy Guide].

    Hefei - [Hefei Decoration Strategy Guide].

    Fuzhou - [Fuzhou Decoration Strategy Guide].

    Beijing - [Beijing Decoration Strategy Guide].

    Dalian - [Dalian Decoration Strategy Book].

    Hangzhou - [Hangzhou Decoration Strategy Guide].

    Shanghai - [Shanghai Decoration Strategy Guide].

    Tianjin——[Tianjin Decoration Strategy Guide].

  2. Anonymous users2024-02-11

    Home improvement to water and electricity, is it better to go to the ground or the top? In house decoration, water and electricity renovation is a crucial step in the decoration, and a good foundation must be laid. No matter how good the decoration is in the later stage, if the water and electricity renovation is not good, everything will be in vain.

    1. The roof of the hydropower station.

    Hydroelectric ceilings are the installation of electrical wires on the suspended ceiling. The advantages of this approach are:

    The first benefit is to avoid complicated procedures. When the water is installed in the ceiling.

    When up, there is no need to groove in the floor, thus avoiding complicated procedures.

    The second advantage is ease of maintenance. Install the wires on top. If there is a problem that needs to be repaired later, the roof can be directly opened for repair or inspection. It's quick and easy and won't damage the wires.

    The third advantage is that the hydropower cap reduces the risk factor of short circuit electrocution due to water ingress into the line pipeline.

    2. Disadvantages of the roof of the hydropower station:

    The wall needs to be grooved, and the construction is difficult.

    The circuit leads to the top, and the switch socket is basically about about high. If you route from the ceiling, the walls will be damaged for a longer period of time and more wires will be used than the floor.

    If you use a ceiling, you need to hang the ceiling, otherwise the plumbing pipes hanging from the ceiling will affect the appearance.

    Hydroelectric power station fence.

    3. Advantages of water and electricity pipeline through wall installation:

    The water and electricity pipelines are not easy to be damaged during the construction of the wall, and the construction is also very convenient.

    If there is a problem at a later stage, it is also easy to repair. Compared with suspended ceilings, pipes are laid on the wall, which can save decoration costs and do not require a large area of suspended ceilings.

    Is it better to walk on roofs, walls, or the ground in a hydropower retrofit? You'll understand after reading it.

    4. Disadvantages of hydropower walls:

    During installation, it is necessary to groove horizontally, which can damage the wall.

    At the same time, if there are grooves in the walls are painted with latex paint.

    The probability of cracking at the groove position is greater than that at the non-groove location.

    5. Advantages of ground hydropower installation:

    It is convenient to lay water and electricity on the ground, the overall effect is very simple, and the construction of workers is relatively safe.

    When the walls are decorated with pendants, there is no need to think about the safety of the line.

    Compared with suspended ceilings, it can save space height, no need for large area suspended ceilings, and can save decoration costs.

  3. Anonymous users2024-02-10

    Good walk. It's not easy to slip the line when walking on the ground, so let's go to the ground for the sake of safety.

  4. Anonymous users2024-02-09

    The difficulty of going to the top is higher than the difficulty of going to the ground, so it mainly depends on the personal installation needs, if it is to go to the top, it will definitely increase the amount of work, so it should be more difficult to go to the ground, simpler, and ** is also different.

  5. Anonymous users2024-02-08

    When changing the home renovation to water and electricity, it is better to go to the top of the line pipe, which can avoid complicated procedures and is also convenient for maintenance.

  6. Anonymous users2024-02-07

    In the case of hydropower transformation, is it better to go to the top or to the ground? Let's take a look!

    Because generally speaking, if you talk about water and electricity decoration to the top, maintenance and replacement are the biggest advantages. If the line is leaking, the location of the leak can be quickly discovered, and the chef can remove a few ceilings and replace the broken line, and it can be replaced. Low maintenance costs.

    This method is basically a non-destructive repair method, and there is no need to damage the floor or bricks of the bathroom kitchen, which can avoid water leakage downstairs. Hydropower goes to the top, and there are also disadvantages, the disadvantage is that the labor cost is a bit high. The advantage of the water pipe to the floor is that it is low and saves the manual cost, but the disadvantage is that the later maintenance is particularly troublesome.

    In fact, at the beginning of the year, he usually went to the ground level to make indoor pipelines. In the event of a leak, if it floods downstairs, the problem of waterproofing the water pipes is not clear. To find the leakage, both floor and wall tiles are used.

    In addition to the hassle, the cost has increased unknowingly! In addition, if a slotted fixed stamping is required, the beam may be damaged, causing a safety hazard. In terms of circuits, whether to go to the top or step on the ground, in fact, the difference is not very big.

    Generally speaking, the electrician master recommends the line, neither high nor low, which is his professional safety consideration. If you get close, you may have water accumulation and damage to wet wires, and you may have an electric shock accident if you are worried about being damaged by leakage.

    After the pipeline is not good, it is not easy to be damaged in the later construction work, which is convenient for construction protection. Temporary problems with plumbing are also easy to repair, and walls are damaged and are easier to repair than ceilings and floors. Compared with the ceiling, the pipe can save the decoration cost and do not require a large ceiling.

    If it is not an installation line, the maintenance cost is low, and it is easier to repair than walls and floors. If the installation can realize the field line, the decorative surface of the interior will not be damaged during maintenance.

    The biggest impact of the pipe walking wall is to destroy the wall and increase the probability of wall paint cracking. For routes, you may want to implement field circuits because of the many right angles and corners used in the "horizontal and vertical" routing. There are potential safety hazards, and it is easy to punch holes through the wall when you need to install pendants and decorations on the wall when you live in the future.

    Walking on walls, turning too many and increasing pipes can lead to energy loss. The wiring should be at the top, the winding beams, the structure of multiple beams may be damaged, the wiring needs to be blocked by the ceiling, the height will be reduced, and the space will be suppressed.

  7. Anonymous users2024-02-06

    Hello, dear, I am glad to answer for you Answer: Decoration of water pipes and wires on the top or the ground, there are the following advantages and disadvantages: a:

    Advantages of water difference compass electric pipe: the ground does not need to be slotted, in case there is a leakage of finger water, you can quickly find the location, to avoid the imaginary number of disasters downstairs. Relatively safe.

    The maintenance of the top surface of another water circuit is more convenient and less expensive than the maintenance of the ground; Disadvantages: The texture of the water and electricity pipes is soft, so they must be fixed firmly, and sometimes they need to punch holes in the beam, plus the wires through the beam holes and some ** air conditioning openings, there is some damage to the beam body, and the pipeline will be relatively long, increasing the decoration budget. Long-term exposure of water pipes to the air will shorten the lifespan of the pipe, which is theoretically buried in the ground2 3.

    2: Advantages of water and electricity pipes on the ground: water pipes are installed on the ground quickly, and the water and electricity pipelines are shorter and cost less.

    Disadvantages: Sometimes it is necessary to slot the wall, especially the bathroom slotting is easy to damage the waterproof layer and cause water leakage, which is not suitable for timely discovery and maintenance. It is recommended that the toilet water pipe go to the top, the biggest benefit is to facilitate later maintenance and replacement.

    The meaning of going to the top is not to groove in the roof, but to walk along the corner of the wall and the top, through the living room or bedroom water pipe can be suspended or covered with gypsum line, without affecting the appearance, if the kitchen does the ceiling, the water pipe is well hidden. If necessary, the outside of the water pipe can be covered with a layer of insulation material, which is not only easy to repair in case of problems, but also does not affect the floor heating.

  8. Anonymous users2024-02-05

    When many users renovate their houses, they don't know whether hydropower should go to the ground, or whether it is better to go to the top, what are the advantages and disadvantages of going to the top and going to the ground? How should we better carry out hydropower transformation? Some users propose hydropower retrofit:

    Can water pipes and wires go at the same time? Professional masters, you can go at the same time, but for the sake of safety and maintenance, try not to go at the same time, let's take a look at the advantages and disadvantages of hydropower roofing and landing.

    First, from a security point of view.

    1. Walk to the top: Why choose to go to the top by water? Because the waterway can be found in time to find the problem of water leakage, the safety will be higher, so most decoration companies go to the top of the waterway.

    The circuit and the waterway are separated, the safety will be higher, and the water leakage will not affect the circuit problem. The circuit goes to the top, and the ground is waterproof.

    2. Walking on the ground: It is difficult to find the water leakage problem when the waterway is walked, and it is already very serious when it is detected, and it is more troublesome to do waterproofing in the bathroom; However, if the circuit goes to the ground at the same time, it may cause circuit failure if it is not done well during construction.

    Second, from the perspective of maintenance.

    1. Go to the top: If you go to the top of the water, you can better conceal the wires and water pipes of the water circuit through the ceiling modeling, and the waterway can be found in time, and it will not cause serious water leakage to be found, because the aluminum buckle plate of the ceiling shape is not afraid of water, so you don't have to worry about the ceiling problem, and the waterway is easy to maintain.

    2. Walking the ground: The water circuit goes to the ground, and the original installed floor must be dismantled, and then buried in the cement, which is not cost-effective. It's more cumbersome to repair.

    3. From the perspective of avoiding disputes.

    1. Go to the top: If you leak and flood your own home, it is nothing more than a problem of self-maintenance, and it will not affect the harmony of the neighborhood.

    2. Go to the ground: affect the harmony of the neighborhood, once the water and electricity leak even downstairs is a scourge, then not only to smash the ground for maintenance, but also to be responsible for the maintenance of the downstairs residents, as well as money and human compensation.

    Fourth, from the perspective of cost.

    1. Going to the top: The water circuit is very waste, and for the sake of safety, there are still many users who choose to go to the top. However, for construction workers, they have to stand on the stool and work with their heads up, and they have to fix the clamps, and the lintels have to punch holes, which is very troublesome, so it is very labor-intensive. For example, the waterway is slotted, and the water on the toilet is generally left on the ground for 30cm, and the ground is to open a 30cm slot, but the top will be more than 2 meters, plus if the pipe is laid across other rooms, it may be necessary to do additional ceiling shielding along the top part, and the pipeline required to go to the top is relatively long and the elbow used is more than the ground, and the elbow is actually increased the probability of the problem.

    2. Walking the ground: bending down can be completed, of course, it saves labor, so the salary is definitely cheaper than going to the top; Don't consider the beauty of the car roll problem, you can go directly on the ground, the use of the pipeline is slightly less than the top, and a small amount of money should be saved on the pipe, but the waterway is also separated from the groove and not slotted, and the slotting needs to be added to the slotting cost and backfill cost; No slotting, if you want to lay wooden floors, you need to add leveling costs in the later stage.

    5. Advantages and disadvantages of hydropower roofing and landing.

  9. Anonymous users2024-02-04

    Waterway renovation is an important part of home decoration, generally water pipes are hidden in the wall, so for waterway renovation must be decorated at a high level to avoid hidden dangers, so in the process of waterway transformation, the water pipe is better to go to the top or the ground? In the past, I liked to walk the ground, but now it is gradually becoming popular to go to the top, so which one is better, let's take a look at the rules for waterway renovation water pipe routing.

    First, it is better to go to the top or the ground of the water pipe

    1. The water pipe goes to the ground.

    The pipeline installation is the easiest, and the materials are not much, but if there is a water leak, it is not easy to find, and the maintenance is the most troublesome and may cause major losses (such as soaking the floor, destroying the cabinets and ceilings of the downstairs neighbors), and the installation will destroy the ground waterproofing.

    2. The water pipe goes to the top.

    The pipeline installation is the most difficult, with more materials, such as water leakage maintenance is easy, and water leakage is easy to find, not easy to cause major losses, will not damage the ground waterproof, if through the hall, there should be a ceiling or gypsum line to cover.

    3. The water pipe goes to the wall.

    The pipeline installation is difficult, the materials are minimal, if there is a water leakage, it is easy to repair, and the water leakage is easy to find, and it is generally not easy to cause major losses, but it is difficult to slotting and will damage the wall more, and will not damage the ground waterproofing.

    Second, the waterway renovation water pipe routing rules

    1. Design positioning: According to the actual use of the kitchen and bathroom, the decoration water pipe routing should reasonably determine the position of each water point such as valves, faucets, showers, angle valves and the direction of the pipeline, and draw the line positioning.

    2. Correct slotting: the depth of the chiseled wall and groove should ensure that the concealed pipe is in the wall and the ground, and the thickness of the cement mortar sealing should meet the construction requirements of the water pipe in its culvert, and the water pipe shall not be higher than the wall. The shorter the route, the better, the fewer elbows the better, you can use 45 elbows without 90 degree elbows, you can walk flat as much as possible not to use bridge bends, and the water pipe routing must go to the top, so as to facilitate future maintenance, and can avoid the destruction of the waterproof layer.

    3. Pipeline quality: The hot melting process of PPR pipe does not require the number of underground pipe joints, because it is one to survive, there are quite a lot of underground pipe heads, and one or two more joints are also the same probability, the key to the problem is the specification of the joint process, and the quality of the water pipe must meet the standard.

    4. Convenient and beautiful: the discharge of the waterway dark valve should consider the convenience and beauty of the valve. The position of the dark valve should be based on the owner's usage habits, combined with the cabinet drawings, to avoid the corners of the cabinet. When laying hot and cold water, special attention should be paid to hot up and cold, left hot and right cold.

Related questions
6 answers2024-07-13

Hydropower decoration needs to be installed with live wires. According to the local market price, the best range of water and electricity decoration is between 200-400 yuan per square meter. >>>More

9 answers2024-07-13

The position of the switch is generally easy to operate, the switch height has industry standards, and the wiring is also specified, you can check it.

1 answers2024-07-13

Decorating houses will be designed and installed wires, but there are many types of wires, so it is best to see what methods are available when installing, and it is best to understand when wiring, and the selection of some evil wires also needs to be mastered, thenHome improvement wire connectorsWhat are the methods? What are the methods of selecting and dismantling home improvement wires? Let's introduce it to you. >>>More

3 answers2024-07-13

First, the layout of hydropower.

1. Horizontal and vertical. >>>More

10 answers2024-07-13

If you simply use electricity, you can use this tube. The usage is as follows: pull the wire, and then let a person look at the other side, if the wire moves, it means that this one is through, you can tie the wire and the wire and then pull the wire at the other end to lead the wire out. >>>More