    Hydropower decoration to go to the ground or to the top? Don't dwell on it, it's the right way to do it. 

    When many owners are decorating their houses, the question of whether water and electricity go to the top or go to the ground is very entangled! I asked a lot of people, some people said it was good to go to the top, and some people said it was good to go to the ground. Listening to this, I was even more entangled! 

    In fact, don't care whether he goes to the ground or the top, let's take a look at what the pros and cons of their differences are, and understand the principle clearly in order to prescribe the right medicine! 

    Generally speaking, if the water and electricity decoration is said to go to the top, because the convenience of maintenance and replacement is the biggest advantage, in case of pipeline leakage, you can quickly find the leakage location, the kitchen and bathroom can dismantle a few ceilings, replace the broken pipes on the OK, the cost of maintenance is low, this way is basically non-destructive repair method, do not need to destroy the floor tiles or wall tiles of the bathroom kitchen, and can avoid water leakage downstairs, to avoid unnecessary neighborhood disputes! 

    There are also disadvantages to the top of hydropower, and the disadvantage is that the labor cost is more expensive. 

    If the water pipeline goes to the ground, the advantage is that the cost is low, and the manual cost will be saved, but the disadvantage is that the later maintenance is particularly troublesome, in fact, he did the decoration pipeline in the early years, and once the leakage water flooded downstairs, the problem of water pipe or waterproof is not clear. To repair and find the leakage, you have to spend all the floor tiles and wall tiles. In addition to the trouble, it also invisibly increases the cost!

    In addition, if slotted fixed holes are required, the beam may also be damaged, bringing safety hazards. 

    Generally speaking, the electrician master will suggest the line, go high and not go low, which is their professional safety consideration, if you get closer, you are afraid that there will be water accumulation or wet wires in the later life will be damaged into leakage, and electric shock accidents may occur. 

    Based on the above circumstances, water and electricity to go to the top is a better choice, the advantages are more obvious, but try to reduce the roof slotting, along the wall and the foot of the top of the walk, through the living room and bedroom water pipes can be suspended, or with a gypsum line to cover the seal, will not affect the appearance. The kitchen has a suspended ceiling, which hides the water pipes well. 

    Maybe your decoration budget is not much, but water and electricity cannot be saved, and the money that should be spent still has to be spent, otherwise it will be more troublesome to move in later. If you want to save money, you can do less in soft decoration and buy less electrical appliances. When the economic conditions are good, these can be added slowly.

    Kitchen and bathroom water and electricity renovation is a hidden project, it is recommended that you can fully communicate with the workers in the process of construction, construction quality and material quality.

  2. Anonymous users2024-02-05

    Under the operation of a professional hydraulic or electrician, consumers should check whether all the reconstructed lines are smooth, whether the layout is reasonable, whether the operation is standardized, and reconfirm the actual size of the renovation.

  3. Anonymous users2024-02-04

    Hydropower decoration to go to the ground or to the top? See what 30 years of experience plumbers have to say.

  4. Anonymous users2024-02-03

    Hydropower engineering is very important in the interior decoration, because it is a concealed project, so in the installation process more need to pay attention, not only need to dig the trench buried pipeline, but also require horizontal and vertical arrangement, not only that, in the wiring access through the ground, wall and other places are also strict requirements, generally from the ground or the top position to wiring, so hydropower installation to the top or the ground? Let's take a look.

    First, the installation of hydropower to the top or to the ground.

    Hydropower installation generally follows the principle of going to the top and not going to the ground, that is, it can be wired from the ceiling and not from the ground and the wall, which is mainly due to the problem of maintenance costs in the later stage, hydropower problems, it is very convenient to check from the ceiling, especially the gusset ceiling, which can be directly disassembled, and the maintenance cost is basically negligible.

    2. What problems need to be paid attention to in hydropower installation.

    1. Pay attention to the power of electrical appliances.

    When installing water and electricity early, the power of indoor electrical appliances should also be clearly understood, especially for high-power electrical appliances such as refrigerators, air conditioners, microwave ovens, etc., the wires used in connection are strictly required, and safety must be ensured, but also to avoid tripping, overheating and other phenomena.

    2. Pay attention to the material of the water pipe.

    Now there are copper materials, stainless steel materials and PPR materials for water pipes, etc., among which PPR materials are more used indoor water pipes, and this kind of water pipes are of different grades, which can be selected according to the pressure of the water pipes.

    3. Pay attention to the water pipes and wires that must be buried in a pipe pit.

    When installing water and electricity pipelines, you can't be greedy for convenience, the water pipes and wires must be buried in a pipe pit, which is very unsafe, the water pipes are generally based on the top, and they need to be fixed with pipe clamps, and the spacing can not be too large, when the water pipes and the circuit have crossed and overlapped, the circuit should be on and the water pipes should be on the bottom.

    Summary: The above is the introduction of hydropower installation to the top or the ground, I hope the content shared can give you some reference, if you want to know more about the relevant knowledge, you can **** Qeeka Home information.

  5. Anonymous users2024-02-02

    Hydropower is good.

    From the point of view of safety, it is recommended that everyone go to the top. Generally speaking, the failure of the water pipe is mostly water leakage, if the water pipe is on the top, then if there is a water leakage, we are easy to detect, and the safety is slightly higher. If the water pipe is on the floor, then it is not easy for us to detect the leakage, and sometimes it will not be noticed until it seeps downstairs.

    If your home circuit is also on the ground, it is easy to have circuit failures once it leaks.

    From the point of view of maintenance convenience, if you go to the top, then we only need to disassemble the ceiling for maintenance during maintenance, and the aluminum buckle plate used in the ceiling is not afraid of water, and the maintenance is relatively simple and convenient, and will not generate secondary costs. If the water pipe is on the ground, then the maintenance needs to disassemble the wooden floor, pry the tiles, etc., and after the repair, it is necessary to re-level and lay the floor, which is a huge cost.

    From the perspective of dispute responsibility, if you are going to the top, you only need to repair it yourself; But if you are walking on the ground, the water leakage will affect the life of the residents downstairs, and then not only will you have to smash the ground for repair, but also be responsible for the maintenance costs of the downstairs residents, and to a certain extent, it will also affect the neighborhood relationship.

    From the point of view of maintenance costs, if you go to the top, it is more difficult for workers to maintain, and the labor cost is high. If it is to go to the ground, although it can save labor, the process is more complicated, and the maintenance cost is also very high.

  6. Anonymous users2024-02-01

    Housing decoration, water and electricity to go to the top or the ground? What are the advantages and disadvantages of walking to the top and going to the ground? Advantages and disadvantages of home renovation water and electricity topping:

    Advantages: First of all, it is a problem that can be found immediately, if the underground water pipe leakage is leaking in your own home, it is beneficial for the water pipe to go to the top and is a well-sought after problem. It can be detected and repaired at the first time, and it does not affect the next-door neighbor.

    Reduced the difference between going up and down the stairs. Good maintenance, the vast majority of water and electricity roofs should be covered with decoration ceilings, such as once water seepage, decoration ceiling repair is much easier than floor tile repair.

    Flaw; The cost of going to the top of the line is very good, but it is a bit expensive, and the cost of water and electricity is more than twice or even more than twice the cost of going to the top. The construction requirements are high, and the water and electricity installation of these projects must understand the steps of the line to the top.

    Advantages and disadvantages of hydropower installation and topping: the difficulty coefficient of hydropower engineering topping is low, and it is low, and the project can be constructed in accordance with the basic construction process. The water pipe goes to the top, the material is less than the top, and the water outlet point of the heating pipe is close, which reduces the heat discharge of boiling water in the case of transmission and saves water resources.

    Flaw; When the water and electricity bills go to the top, it is very easy to damage the masons in the case of entering the stage, floor tiles, bricks, laser cutting machines, these heavier decorative building materials and special tools, once placed unreasonable or careless in the construction of the project, it is very easy to cause damage to the pipe fittings of the hydropower project, so in the construction process of the medicinal materials beware of care, do a good job in the maintenance of hydropower projects. If the water seepage on the top of the water pipe of the hydropower project can directly seep into the bottom of the building, you are not allowed to find it. Be sure to be reminded by the downstairs neighbor, it is very easy to endanger the harmony of the neighborhood.

    If the top pipe of the hydropower project is excessively gathered, it is easy to cause the wall to be hollow, so it is necessary to pay attention to it during the construction process. Is it better to go to the top or go to the top of the line for hydropower installation? Generally speaking, the selection of the line to the top will be stronger, through the comparison of the advantages are obvious, but try to avoid slotting on the roof, towards the wall and the foot of the top along the walk, large living room, dining kitchen and bedroom can be through the decoration of the ceiling or plaster lines to block the water pipe, not unaesthetically pleasing, but the details still have to be in-depth analysis, if the floor of the home is insufficient, or the line is inconvenient to go to the top, there is only the top.

  7. Anonymous users2024-01-31

    I think it is more safer to go to the ground, the disadvantage is that there is no way to maintain well, the top can be better repaired, the disadvantage is that it requires more costs.

  8. Anonymous users2024-01-30

    It should be easier to decorate on top. The advantage of going to the top is that there is a fault in the later stage, which can be better repaired, and it can also be better solved, and it can be decorated without damaging the wall. There will be no impact on the renovation.

    The disadvantage is that it is more expensive, the cost performance is not particularly high, and it is more troublesome to decorate.

Related questions
10 answers2024-03-13

It is necessary.

In fact, when it comes to hydropower retrofits, most users retain the water circuits that developers are equipped with. On the other hand, the quality of the water and electricity pipelines equipped by the developer is basically up to standard (especially **), and even better than the products purchased by some users. >>>More

2 answers2024-03-13

1. Technical regulations and technical regulations for waterway construction: >>>More

4 answers2024-03-13

1. The material process must meet the requirements of the company's specifications: all wires are made of famous brands such as pigeon brand BV wires, lighting circuit sockets air conditioners 4mm2, kitchens, bathrooms 4mm2, and grounding wires, especially emphasizing that DAEX general light (16) pipes or DAEX (16) B pipes, round tees, direct, locks, and yellow wax pipes should be used in the threading, and bellows, elbows, and equal diameter tees are never allowed. 1 16 pipes can only be used for one circuit, 20 can only be used for 6mm21 circuits and the circuit between the toilet bomb and the switch. >>>More

11 answers2024-03-13

Renovation does not necessarily require water and electricity renovation, but if it is a rough house, it is recommended to hire a plumber to carry out water and electricity renovation, because some of the sockets, switches and water outlets set up by the developer are often incomplete or do not meet the owner's preferences. >>>More

8 answers2024-03-13

Our teacher talked about it

1.The water flow of the Three Gorges is rapid. Argument: Or the king's order is urgently announced, sometimes the white emperor is sent to the court, and the twilight goes to Jiangling, during which 1,200 miles, although he takes the wind, he does not take the disease. >>>More