Whether the crane needs to apply for a use certificate after passing the inspection

Updated on society 2024-07-11
16 answers
  1. Anonymous users2024-02-12

    Yes, you must apply for the certificate of the Quality and Technical Supervision Bureau, or someone else will be fined if you report it.

    Crane refers to a multi-action lifting machinery that lifts vertically and carries heavy objects horizontally within a certain range. Also known as a crane. At present, the major domestic hoisting Guangdong Shunfa heavy equipment has gradually canceled the lifting function.

    The main feature of the tire crane is that its driving cab is combined with the lifting control room.

    First, it is evolved from a crawler crane (crawler crane), which turns the crawler and walking bracket part of the walking mechanism into a chassis with tires, which overcomes the shortcomings of the crawler crane (crawler crane) track shoes that cause damage to the road surface, and belongs to material handling machinery. Some of the working characteristics of lifting equipment are to do intermittent movement, that is, in a working cycle of reclaiming, moving, unloading and other actions of the corresponding mechanism is alternately working, the development and use of cranes in the market is more and more extensive. Due to the lack of outriggers and lifting heavy driving, there are often some accidents, and the speed of travel is faster than that of crawler cranes (crawler cranes); The operation is stable, the lifting capacity is large, and the lifting can be carried within a specific range, but the road must be smooth and solid, the tire pressure meets the requirements, and the lifting from the ground shall not exceed 50cm; It is forbidden to walk long distances with loads.

    In order to ensure the safety of the operation, it is basically forbidden to carry out hoisting operations without outriggers in China.

  2. Anonymous users2024-02-11

    Before the installation of the crane (special equipment), it is necessary to inform the local quality and technical department before it can be installed. After the installation is completed, after passing the inspection by the relevant technical quality inspection department, you can go to the quality inspection department to apply for the use of the certificate, and the general use of the certificate is done by the use of the unit.

  3. Anonymous users2024-02-10

    The user unit shall apply for the use license and registration with the inspection certificate and the unit certificate to the geological inspection agency.

  4. Anonymous users2024-02-09

    Yes, if you are in Guangdong, you should use the account number of the user unit to first report the equipment use registration application in the "Guangdong Construction Lifting Machinery and Special Operations Personnel Qualification Management System", fill in the information inside, and then prepare the information according to the list inside and take it to the quality inspection department, and they will give you a registration certificate. You can entrust a tower crane company to help you handle it, but only if you give them the account number of the user unit to report the relevant information.

  5. Anonymous users2024-02-08

    To drive a crane, you need to apply for a special work permit.

    Personnel conditions for special operation certificate:

    1. Be at least 18 years old and not exceed the statutory retirement age.

    people. 2. Have a junior high school education level or above (hazardous chemicals.

    Special workers should have a high school education or above or equivalent).

    3. Good health, no hypertension.

    Heart disease, epilepsy.

    Other illnesses and physical defects that affect work, such as vertigo.

    4. Have the necessary safety technical knowledge and technical ability.

    5. Other conditions specified in the corresponding special operation.

  6. Anonymous users2024-02-07

    The lifting machinery unit does not need to apply for the safety production Xuyuan orange family certificate, but it must apply for the manufacturing license of special equipment for construction lifting machinery.

    According to Order No. 397 "Regulations on Work Safety Permits.

    Article 2 stipulates that "the state refers to mining enterprises, construction enterprises and hazardous chemicals.

    Manufacturers of fireworks and firecrackers and civil blasting equipment shall implement a safety production licensing system. Enterprises that have not obtained a safety production license shall not engage in production activities. ”

  7. Anonymous users2024-02-06

    Does the lifting machinery unit need to apply for a safety production license? I think what he said, since it is this kind of lifting machinery unit, their unit should also have a history of bending, and the three-limb boring factory should need to handle the certificate according to the excavation license of the casual certificate.

  8. Anonymous users2024-02-05

    Summary. Hello, the truck crane is also required to provide the certificate and inspection report to the construction site.

    Hello, the truck crane is also required to provide the certificate and inspection report to the construction site.

    Hello, lead god because this is an indispensable measure to ensure construction safety. All machinery involved in safety needs to be fixed and excited by the third party with this qualification for technical safety appraisal, load specification and verification and issuance of "certificate" or "inspection report", within the validity period of the certificate can be carried out bidding, insurance and construction operations.

    Hello, lead god because this is an indispensable measure to ensure construction safety. All machinery involved in safety needs to be fixed and excited by the third party with this qualification for technical safety appraisal, load specification and verification and issuance of "certificate" or "inspection report", within the validity period of the certificate can be carried out bidding, insurance and construction operations.

  9. Anonymous users2024-02-04

    Summary. The tower crane can not be used, and the tower crane registration and filing system needs to be strictly implemented. Vertical transportation equipment such as tower cranes already owned or newly purchased by the construction unit shall be reported to the safety supervision department for registration and filing as soon as possible.

    It is strictly forbidden to enter the construction site without a production license, no product certificate, shoddy production, and inferior quality tower crane products, and tower cranes without registration shall not be used at the construction site.

    Hello, I am inquiring for you here, please wait a while, I will reply to you immediately

    The tower crane can not be used, and the tower crane registration and filing system needs to be strictly implemented. Vertical transportation equipment such as tower cranes already owned or newly purchased by the construction unit shall be reported to the safety supervision department for registration and filing as soon as possible. It is strictly forbidden to enter the construction site without a production license, a macro rolling certificate, a leakage of ignition, no product certificate, shoddy, and inferior quality tower crane products to enter the construction site for installation and use, and the tower crane shall not be used at the construction site without registration.

    I hope mine can help you, and I wish you a happy life and all the best!

    If you're satisfied with me, please give me a big thumbs up

    Overhead cranes.

    It's all the same, and it can't be used without registration.

    5 tons passed the first inspection, but the report has not yet been issued, and the registration procedures cannot be carried out, so it can be used.

    The crane is a special equipment, and it cannot be used without registration and filing of more than 3 tons, and it can only be used after passing the test of the special inspection institute.

    It doesn't work, dear.

    Because the 5-ton crane belongs to special equipment, and the tonnage is very large, it cannot be used before the report is released.

    Can you not use it within 15 days after passing the inspection, because there is no way to go through the procedures if the report does not come out.

    The law has provisions, the slow annihilation as far as possible not to violate the law special equipment safety supervision regulations "Article 99 stipulates the basic concept of all kinds of special equipment, the new directory in the "special equipment safety supervision regulations" within the scope of the basic concept, in the form of definition and list, clear into the supervision of the types of special equipment and the specific scope of the varieties of punching, since the implementation of the new catalog, quality and technical supervision departments at all levels in accordance with the division of responsibilities, responsible for the safety supervision and management of special equipment within the scope of the new catalog.

    I hope mine can help you, and I wish you a happy life and all the best!

  10. Anonymous users2024-02-03

    To drive a crane, you need to apply for a special work permit.

    Personnel conditions for special operation certificate:

    1. Persons who have reached the age of 18 and have not exceeded the statutory retirement age.

    2. Have a junior high school education or above (special hazardous chemicals operators should have a high school education or above, or equivalent).

    3. Be in good health, without hypertension, heart disease, epilepsy, dizziness and other diseases and physical defects that affect work.

    4. Have the necessary safety technical knowledge and technical ability.

    5. Other conditions specified in the corresponding special operation.

  11. Anonymous users2024-02-02

    To drive a crane, you need to apply for a special operation certificate.

    Personnel conditions for handling special operation certificates.

    1. Be at least 18 years old and not exceed the national statutory retirement age.

    2. Have a junior high school education or above (hazardous chemicals special operators should have a high school or equivalent to a high school education or above).

    3. Be in good health, without other diseases and physiological defects such as high blood pressure, heart disease, epilepsy, vertigo, etc. that hinder the operation.

    4. Have the necessary safety technical knowledge and skills.

    5. Other conditions stipulated in the corresponding special operations.

  12. Anonymous users2024-02-01

    The crane belongs to special equipment, and the special operation certificate is handled by the Safety Supervision Bureau.

    1. Requirements for hoisting machinery operation certification:

    Over 18 years old, not more than 60 years old for men and 55 years old for women; Junior high school or junior high school degree or above, 2. Lifting machinery operation certification materials:

    Bring the original and 1 copy of your ID card; 4 one-inch bareheaded color photos.

    3. Training content:

    1) Professional and safety knowledge of lifting machinery operation.

    1. The classification, scope of application and technical performance of portal cranes.

    2. The main parameters of the portal crane.

    3. Crane lifting mechanism, luffing mechanism, walking mechanism and rotating mechanism 4, crane safety device.

    5. Installation and technical requirements of electrical and electrical protection devices.

    6. Safe operation process of crane installation operation.

    7. The use of safety protection equipment.

    8. Cable installation and technical requirements.

    9. Emergency measures for emergencies.

    10. Operational test and technical requirements.

    2) Basic knowledge of lifting machinery operation.

    1. Commonly used electrical parameters in mechanical engineering.

    2. Knowledge of safe electricity use.

    3) Lifting machinery operation regulations, standard knowledge and safety technical specifications 1, technical standards for portal cranes.

    2. Crane installation and acceptance specifications.

    3. Regulations on safety supervision of special equipment.

    4. Crane supervision and calibration procedures.

  13. Anonymous users2024-01-31

    This certificate is required to be examined, which is divided into two parts: theory and practice, and is issued by the Quality Supervision Bureau. Theoretical theory is a question in the question bank, and then you need to learn, I looked at the software of the test assistant at the time, and read all the questions once and passed the test, and the practical operation depends on your own ability.

  14. Anonymous users2024-01-30

    Requirements: 18 to 60 years old.

    Be in good health and have no bad habits.

    The exam is simple, the cycle is short, and there are exams every week.

  15. Anonymous users2024-01-29

    Hello, does the truck crane need to provide the certificate and inspection report to the construction site: mandatory. This is an indispensable measure to ensure construction safety.

    All machinery involved in safety, such as lifting equipment, piling equipment, road repair equipment, elevators, winch equipment, ships, etc., need to be regularly identified by a qualified third party for technical safety appraisal, load specifications and verification issued "certificate" or "inspection report", within the validity period of the certificate can be carried out bidding, insurance and construction operations. The national standard also stipulates that if the equipment is overhauled during the validity period or has been transformed for other reasons, it is necessary to apply for inspection and obtain a certificate again. So this certificate is equivalent to a recent health certificate of equipment.

    As the construction party A or the leasing party has the right to ask Party B or the leased party of the equipment for the certificate, and a responsible equipment owner is also obliged to provide the relevant certificate to the tendering party or the other party to the contract.

  16. Anonymous users2024-01-28

    Legal analysis: within 30 days from the date of acceptance of construction lifting machinery, the construction unit shall register with the construction administrative department or other customs departments.

    Legal basis: Regulations on the Administration of Work Safety in Construction Projects

    Article 18 If the use of self-erecting erection facilities such as construction lifting machinery and overall lifting scaffolding and formwork reaches the inspection and testing period stipulated by the state, it must be tested by an inspection and testing institution with professional qualifications. If the test is unqualified, it shall not be continued to be used.

    Article 19 The inspection and testing institution shall issue a safety certificate for the self-erecting erection facilities such as construction lifting machinery and overall lifting scaffolding and formwork that have passed the test, and shall be responsible for the test results.

Related questions
6 answers2024-07-11

Application of crane: Xinxiang Degong machinery crane is an important tool and equipment to realize the mechanization and automation of the production process in modern industrial production and lifting and transportation. Crane customization is in Xinxiang City, so the crane has been widely used in indoor and outdoor industrial and mining enterprises, iron and steel chemical industry, railway transportation, port terminals and logistics turnover and other departments and places. >>>More

6 answers2024-07-11

The tower crane is composed of three parts: metal structure, working mechanism and electrical system. Tower cranes are divided into fixed type and walking type, and now the fixed type is commonly used in construction. The fixed tower crane has three directions of movement, 1, is the lifting movement, that is, the use of the lifting mechanism to achieve the vertical movement of the items under the mountain. >>>More

2 answers2024-07-11

In order to ensure the safety and reliability of the lifting operation, the crane is equipped with a more complete safety device, so as to protect the parts or remind the operator to pay attention in case of accidents, so as to play a role in safety protection. >>>More

6 answers2024-07-11

Before lifting, you should know the direction of the operation, second: when lifting, you should know the weight of the object to be lifted; Third: the object to be lifted shall not exceed the limit of lifting....

2 answers2024-07-11

1. Lifting machinery refers to the mechanical and electrical equipment used for vertical lifting or vertical lifting and horizontal movement of heavy objects, and its scope is specified as a lift with a rated lifting capacity greater than or equal to; Cranes with a rated lifting capacity greater than or equal to 3t (or tower cranes with a rated lifting moment greater than or equal to 40t·m, or loading and unloading bridges with a productivity greater than or equal to 300t h) and a lifting height greater than or equal to 2m; Mechanical parking equipment with more than or equal to 2 floors. >>>More