Common sense of safe operation of tower cranes

Updated on society 2024-03-19
6 answers
  1. Anonymous users2024-02-07

    Before lifting, you should know the direction of the operation, second: when lifting, you should know the weight of the object to be lifted; Third: the object to be lifted shall not exceed the limit of lifting....

  2. Anonymous users2024-02-06

    Safety operating procedures and drivers do not hang.

  3. Anonymous users2024-02-05

    gb5144-2006

    Tower crane safety regulations.

    Go to the library to check.

  4. Anonymous users2024-02-04

    <> the key points of tower crane safety control are very critical, and the formulation of the key points is to implement the details to ensure the safety of construction, and the treatment of each link is very important. Zhongda Consulting will introduce the key points of tower crane safety control and Da Pei Bujia.

    1) Before the installation and dismantling of the tower crane, a detailed construction plan must be formulated according to its type characteristics, the technical requirements of the manual, and the operating conditions.

    2) The installation and dismantling of the tower crane must be carried out by the professional team with the corresponding qualifications, and the installation experience is qualified, and the "permit" issued by the relevant competent department can be put into use.

    3) The laying of the roadbed and track of the walking tower crane must be carried out in strict accordance with the provisions of its manual; The foundation construction of the fixed tower crane should be carried out according to the design drawings, and its design calculation and construction details should be one of the contents of the special construction plan of the tower crane.

    4) The torque limiter of the tower crane, the ultra-high, luffing, walking limiter, the hook insurance, the reel insurance, the ladder retainer and other safety devices must be complete, sensitive and reliable.

    5) When working with multiple towers on the construction site, a safe distance should be kept between the tower cranes to avoid collisions during the operation.

    6) In case of bad weather such as level 6 and above with town spike wind, the operation should be stopped and the hook should be raised. The walking tower crane should clamp the rail pliers. After the rain and snow, the operation should be carried out only after the test lifting should be carried out to confirm that the brake is sensitive and reliable.

  5. Anonymous users2024-02-03

    1. Before the operation, the rail wrench should be lifted, the obstacles on the track should be removed, and the splint screws should be tightened.

    2. When operating, the cab window should be opened and the command signal should be paid attention to. In winter, the heating in the cab should have fire prevention and anti-electric shock measures.

    3. For multi-machine operation, attention should be paid to maintaining the operating distance of each machine. The distance of the heavy objects suspended on the hook of each machine shall not be less than 3 meters.

    4. When the crane walks to the track limit switch, it should slow down and stop in advance. For hooks without limit switches, the top dead center must be greater than 1 m from the top of the boom.

    5. After the operation is completed, the tower crane should be parked in the middle of the track, the boom should not be too high, and the rail pliers should be clamped along the wind source to cut off the power supply.

    6. The self-elevating tower crane should also comply with the following regulations:

    1) When lifting objects, the counterweight must be moved to the specified position.

    2) The special elevator is limited to 3 people each time, and it is strictly forbidden to start the elevator when the boom rotates or lifts the operation.

    3) In the jacking, there must be a special person to command, take care of the power supply, and manipulate the hydraulic system and strong bolts. The cable must be loosened during jacking, and the relaxation length should be slightly greater than the total jacking height, and the cable reel should be fixed.

    4) When jacking, the lifting trolley and the counterweight should be moved closer to the tower cap, and the rotating part should be braked, and the tower cap should not be rotated.

    7. The crawler tower crane shall comply with the following regulations:

    1) The ground must be flat and solid, and the left and right track shoes should be stretched out before operation.

    2) The erection of the tower should be slow, and the front of the track should be solidified with iron wedges. When the tower body is erected to 90 degrees, the anti-backward tilt device should be loosened, and the tower body shall not collide with the anti-backward tilt device.

    3) It is strictly forbidden to walk when there is a load, the tower body should be slightly leaning forward when walking empty, and the upper body should not be turned and rotated during driving.

    4) After the operation, the tower body should be put down and the rotating mechanism should be locked.

    List of project tendering owners.

    List of Hainan Project Bidding Owners.

    List of Chongqing project bidding owners.

  6. Anonymous users2024-02-02

    As far as the use of tower cranes and the management of safety distribution are concerned, it mainly involves human factors. As far as the safe use of tower cranes is concerned, it mainly involves the technical level of the operator and his sense of responsibility. Operators should ensure their own health and understand the relevant working principles and rules of mechanical construction, so as to better grasp the technical performance of the tower crane.

    Maintenance and operation personnel should be trained accordingly and obtain the corresponding certificates before they can take up their posts. Because, the quality of tower crane operators is related to the safe use of tower cranes.

    Operation and maintenance personnel should regularly inspect the machinery before and during operation to ensure the normal operation of key parts, such as wire ropes, hooks and safety protection devices. The operator should inspect and maintain the tower crane according to the regulations, find and deal with the fault in time to avoid accidents. For tower cranes, they should be cleaned, adjusted, and tightened regularly to ensure their normal operation.

    Formulate safety operation procedures for tower cranes and establish corresponding systems, such as certificate system and maintenance system. For operators, it should be stipulated that they should not work fatigue or work under the influence of alcohol. In general, it is necessary to ensure that the crane management system is perfect and complete.

    When using tower cranes, it should be operated on the principle of "ten no, ten no-hanging". Similarly, in the process of hoisting, the lifting object should be estimated, and blind lifting is strictly prohibited to ensure night lighting.

    Tower crane foundation is crucial for tower cranes. If there are some problems in the foundation of the Tapeb crane, it may lead to the instability of the tower crane, resulting in major safety accidents. Generally, the problems of tower crane foundation can be mainly classified into the following categories.

    First, because the strength of the concrete does not meet the corresponding requirements, the construction site often ignores this point and carries out hasty installation in order to rush the construction period. Second, the ground endurance has not reached the normal level, in this case the installation of tower cranes, you can imagine what kind of results can be caused. Third, excavation in the foundation of the tower crane is easy to cause landslides, and serious will also lead to displacement; Or after excavation, a large amount of water will be formed, resulting in uneven settlement.

    From this point of view, the tower crane foundation needs our great attention.

    Tower crane is a kind of construction machinery widely used in construction sites, with the characteristics of high lifting and wide coverage, playing the role of vertical transportation. However, tower cranes also have the characteristics of high center of gravity and high danger, which are easy to cause various safety accidents. Only by strengthening the use and safety management of tower cranes can we better prevent the accidents of tower cranes.

Related questions
6 answers2024-03-19

The tower crane is composed of three parts: metal structure, working mechanism and electrical system. Tower cranes are divided into fixed type and walking type, and now the fixed type is commonly used in construction. The fixed tower crane has three directions of movement, 1, is the lifting movement, that is, the use of the lifting mechanism to achieve the vertical movement of the items under the mountain. >>>More

6 answers2024-03-19

Application of crane: Xinxiang Degong machinery crane is an important tool and equipment to realize the mechanization and automation of the production process in modern industrial production and lifting and transportation. Crane customization is in Xinxiang City, so the crane has been widely used in indoor and outdoor industrial and mining enterprises, iron and steel chemical industry, railway transportation, port terminals and logistics turnover and other departments and places. >>>More

9 answers2024-03-19

Overhead crane is a mechanical equipment used to lift various objects on the top of workshops, warehouses and open-air storage yards, usually called "overhead cranes" or "cranes". It is one of the most widely used lifting machinery in the machinery industry, metallurgical industry and chemical industry. In modern industrial enterprises, it is one of the important equipment to realize the mechanization and automation of the production process, reduce heavy manual labor, and improve production efficiency >>>More

3 answers2024-03-19

Crane safety device.

crane safety device >>>More

9 answers2024-03-19

The working class is a work characteristic that takes into account the degree of utilization of lifting weight and time, as well as the number of duty cycles. >>>More