  1. Anonymous users2024-02-07

    When decorating a house, it is common to install doors first and then lay tiles. Renovation can generally be carried out by following these steps:

    Week 1: Commencement procedures, self-measurement, pre-design and budgeting.

    The second week: the main body is demolished, the wooden door manufacturer comes to measure, and the cabinet is measured for the first time.

    Week 3: Plumbing renovation, waterproofing of toilets.

    Week 4: Carpentry of the main ingredients.

    Week 5: Tiling (installation of window sills, floor drains), installation of sleeve hood machine cabinets for the second measurement.

    Week 6: Painting the walls and ceilings in the kitchen and bathroom.

    Week 7: Gas and cabinet installation (sink and gas stove installed at the same time).

    Week 8: Wooden door installation, floor installation, wallpaper installation (radiator installation).

    Week 9: Switch and socket installation, lamp installation, hardware and sanitary ware installation, window pole installation, pioneer cleaning.

    Week 10: Furniture Arrival, Home Appliance Installation, Home Accessories, Moving.

    Door installation must be planned and measured in advance, because it can take up to a month to customize the door. Follow the steps above to install the door and tile the floor at the eighth week, so as to avoid damage and contamination of the tiles. There are several issues that need to be paid attention to in floor installation:

    1. Before the floor is installed, let the manufacturer come to the door to survey whether the ground needs to be leveled or partially leveled.

    2. Before the floor is installed, the ground should be cleaned and dry. On the second day of floor installation, you can make an appointment with wallpaper to pave. It is recommended that on the day of wallpapering, the floor should be protected first.

  2. Anonymous users2024-02-06

    The bathroom must be tiled first. After the tiles are laid, the bathroom door is customized according to the height of the floor. Otherwise, if the tiles are raised high, the door will not open!

  3. Anonymous users2024-02-05

    First tiles, then door frames, and finally doors.

  4. Anonymous users2024-02-04

    It is recommended to first doors and windows, and it is not easy to make mistakes in closing efforts, and the tiles are easy to adjust. Look].

  5. Anonymous users2024-02-03

    It is basic common sense that the bathroom should be tiled first and then the door should be installed.

  6. Anonymous users2024-02-02

    First: If it is a wooden door, it is necessary to paste the brick first and then install the door cover and door, so that the edge is better and more beautiful.

    Second: is an aluminum alloy door or a plastic steel door, it is necessary to install the door first and then paste the brick, because the aluminum alloy and plastic steel door is a relatively simple door, it only has the door frame without the door sleeve, and the edge of the brick can not be closed, so it is necessary to install the door first and then paste the brick door edge to look good. If it is a wooden door, it is necessary to paste the brick first and then install the door cover and door, so that the edge is better and more beautiful; If it is an aluminum alloy door or a plastic steel door, it is necessary to install the door first and then paste the brick.

    Aluminum alloy and plastic steel door is a relatively simple door, it only has the door frame without the door sleeve, can not close the edge of the brick, so it is necessary to install the door first and then paste the brick door edge to look good.

  7. Anonymous users2024-02-01

    Generally, tiles are installed first, and the door frame can also be wrapped with wall tiles in the later stage.

  8. Anonymous users2024-01-31

    In the process of renovating the bathroom and kitchen, in general, we will first lay the bricks and then install the door. This order is based on several reasons. First of all, the installation of the door needs to be carried out under the condition of a flat wall, and the paving of bricks can make the wall more flat, which is conducive to the installation of the door.

    Secondly, if the door is installed first, it may affect the paving of the bricks and may even cause damage to the door. Finally, the installation of the door is usually carried out in the final stage of the renovation to prevent unnecessary damage to the door during the renovation process.

    The specific decoration of the house can be calculated here, just enter the area + city, calculate the decoration in 3 seconds, know the real ** in advance, and easily grasp the decoration company: [Click here, free decoration**].

    In the local market, the price of bricks usually ranges from 30-300 yuan per square meter, depending on the material, brand and specifications of the bricks. The ** of the door ranges from 500-5000 yuan per door, depending on the material, brand and design of the door. These ** are for reference only, and the specific decoration cost also needs to be determined according to the actual situation and personal needs.

    When decorating, it is recommended that you first find a professional renovation company or worker, who will provide you with a reasonable renovation plan and budget according to your needs and budget. At the same time, it is also recommended that when choosing bricks and doors, you should not only consider **, but also consider their quality and durability to ensure the effect and longevity of the decoration. During the renovation process, it is also necessary to pay attention to protecting the facilities that have been installed to avoid damage to them during the decoration process.

    Finally, it is recommended to recommend our "Tuba Rabbit", Tuba Rabbit has 110,000 decoration companies and first-class businessmen in his hands, and the direct sales of building materials are affordable. Tuba Rabbit is selected for decoration, and Tuba Rabbit can accompany the signing of the contract for free, "decorate first and then make payment", reducing the worries of the owners. For more decoration information, welcome to visit:

    Click to enter, professional customer service free consultation good company].

    Kunming - [Kunming Decoration Strategy Guide].

    Suzhou - [Suzhou Decoration Strategy Guide].

    Hefei - [Hefei Decoration Strategy Guide].

    Fuzhou - [Fuzhou Decoration Strategy Guide].

    Beijing - [Beijing Decoration Strategy Guide].

    Dalian - [Dalian Decoration Strategy Book].

    Hangzhou - [Hangzhou Decoration Strategy Guide].

    Shanghai - [Shanghai Decoration Strategy Guide].

    Tianjin——[Tianjin Decoration Strategy Guide].

  9. Anonymous users2024-01-30

    There are two situations, 1. It is a wooden door, and it is necessary to paste the brick first and then install the door cover and door. In this way, the edge is better and more beautiful; 2. It is an aluminum alloy door or a plastic steel door, it is necessary to install the door first and then paste the brick, because the aluminum alloy and plastic steel door are relatively simple doors, it only has the door frame and no door sleeve, and the edge of the brick can not be closed, so it is necessary to install the door first and then paste the brick door edge to look good.

  10. Anonymous users2024-01-29

    Install the door frame first and then put the tiles, my kitchen and bathroom do this, the rest of the place is wooden flooring, first install the door, and finally lay the wooden floor.

  11. Anonymous users2024-01-28

    I'm a home improvement guy.

    Generally, the ground is paved first.

    If there is no time to install the door for the time being.

    You can ask the brick laying master to lay the wall tiles in the bathroom and kitchen to a position where there is only one brick away from the door, and then make the door.

    The bricklayer master finishes up.

    Relatively easy to do.

  12. Anonymous users2024-01-27

    Generally, the door is installed first and then tiled, because the tiles on the side of the door need to be cut and then poured at a 45-degree angle.

  13. Anonymous users2024-01-26

    Generally speaking, it is to put the bricks first and then open the door, unless you have some other advanced needs

  14. Anonymous users2024-01-25

    There are two situations, 1. It is a wooden door, and it is necessary to paste the brick first and then install the door cover and door. In this way, the edge is better and more beautiful; 2. It is an aluminum alloy door or a plastic steel door, it is necessary to install the door first and then paste the brick, because the aluminum alloy and plastic steel door are relatively simple doors, it only has the door frame and no door sleeve, and the edge of the brick can not be closed, so it is necessary to install the door first and then paste the brick door edge to look good.

  15. Anonymous users2024-01-24

    Of course, it is to be tiled first, and there is no objection to this!

  16. Anonymous users2024-01-23

    First the door cover, then the tile, and then the door frame.

  17. Anonymous users2024-01-22

    It is best to paste wall tiles in the bathroom first to achieve "wall tiles pressing floor tiles", which can improve the waterproof effect of the bathroom and ensure the quality of home decoration.

    First, if the floor tiles are pasted first, it is easy to cause wear and tear of the floor tiles when the wall tiles are pasted, and the quality of the floor tiles will be counterproductive and cause unnecessary losses, so you can only start with the wall tiles first.

    Second, if you stick the floor tiles first, when you paste the wall tiles, it is easy to cause the wear and tear of the floor tiles, and the quality of the floor tiles will be counterproductive and cause unnecessary losses, so you can only start with the wall tiles first.

    3. If you want to complete the statement of "wall bricks pressing floor tiles", then you can try to paste the wall tiles from a high position of a brick from the ground, and then paste the wall tiles upwards in turn, until the height that needs to be pasted, and then start to paste the floor tiles, paste all the floor tiles, and finally paste a row of wall tiles at the bottom layer, so that you can complete the statement that the wall presses the ground, and can greatly improve the waterproof effect of the toilet. And because the floor of the bathroom is designed with a certain slope, the water flowing to the ground will also flow along the slope to the floor drain. Of course, this method is also difficult to build, as the owner, we can clearly put forward our own requirements, and can carry out on-site supervision to ensure the quality of home decoration.

  18. Anonymous users2024-01-21

    Floor tiles are a kind of floor decoration material, also called floor tiles. It is made of clay firing. A variety of specifications. Hard, pressure-resistant, wear-resistant, moisture-proof. Some are glazed and have a decorative effect.

  19. Anonymous users2024-01-20

    The bathroom should be plastered with wall tiles first, because if you put the floor tiles first, the dust that falls when you put the wall tiles will fall on the floor tiles, and it will be difficult to clean up, so, in order, you should put the wall tiles first.

  20. Anonymous users2024-01-19

    The tiles in the bathroom are generally pasted to the wall first, and then to the floor tiles.

  21. Anonymous users2024-01-18

    Paste the wall tiles first, how can there be the floor tiles first? Unless the old house is renovated, there is no floor tile first.

  22. Anonymous users2024-01-17

    Lay the floor tiles first, and then paste the wall tiles, so that the bath water in the bathroom can be left along the wall and can be slipped directly into the sewer, and it is not easy to seep water down.

  23. Anonymous users2024-01-16

    Of course, the wall tiles should be pasted first, because it is the right choice from top to bottom.

  24. Anonymous users2024-01-15

    The inside of the bathroom should be plastered with wall tiles first, and then with floor tiles.

  25. Anonymous users2024-01-14

    The bathroom is plastered with wall tiles first, because the cement and sand are constantly falling below, you should want to work below, and wait for the wall tiles to be almost dry, and then paste the floor tiles.

  26. Anonymous users2024-01-13

    Most of them are plastered with wall tiles first and then floor tiles.

Related questions
21 answers2024-04-03

In order to avoid unnecessary trouble later, there are also bathrooms in addition to paving floor tiles The wall should also use tiles, because this is to prevent water from directly touching the wall, which is also a kind of protection for the wall.

16 answers2024-04-03

1. Bathroom waterproof construction steps.

Step 1: You can use slightly coarser cement as a primer first, and wait for the cement to dry before brushing the waterproof coating. But in painting money, the ground should be flat and there should be no grooves. Water is then sprinkled on the ground to expel the gas from the small holes. >>>More

19 answers2024-04-03

When it comes to interior decoration, we generally do the laying of floor tiles before installing sliding doors. There are several reasons for this order. >>>More

12 answers2024-04-03

OK. Waterproofing is actually best done at the end. The last thing to do is to be able to test the waterproofness completely.

25 answers2024-04-03

The bathroom wall also needs to be waterproof, and the tile selection tile has a low water absorption rate, generally speaking, the high quality ceramic tile has a low water absorption rate, so that it can dry quickly. Therefore, it is recommended to paste all tiles.