  1. Anonymous users2024-02-13

    The decoration of the rough house should pay attention to the treatment of the wall and ground, the design and installation of the ceiling, the determination of the decoration style and materials, the transformation of water and electricity, and the planning and safety of the transformation of water and electricity.

    Now many houses are rough houses when they are delivered, the owners need to decorate the house after receiving the house, there are many places that need to be paid attention to, the treatment of the wall and the ground is very important, before dealing with the wall and the ground, you should think about whether the wall is painted with latex paint or tiled and the ground is tiled with floor tiles or wooden floors, and then according to these decorative materials, the necessary repairs to the wall and the ground need to be carried out, and the next step of construction can be carried out after the ground and wall are all leveled.

    1. Design and installation of ceilings

    If you do not ask a professional decoration company to pay attention to the design and installation of the ceiling when decorating the rough room, the bathroom and kitchen in the rough room need a ceiling, at this time the ceiling should have good waterproofness, mainly in light color, it is best to use aluminum buckle plate, it is not only simple and beautiful, but also very practical. If you want to install a ceiling in the living room, you should do a good job of modeling in advance, think about what materials to use, it is best to use gypsum board or other green materials, first the ceiling, and then you can brush paint or latex paint.

    Second, the determination of decoration style materials

    Rough room in the decoration should pay attention to the decoration style and the determination of materials, only after determining the decoration style, in order to know what kind of decoration materials are needed, if you are a decoration white, you can ask a professional designer to design the interior decoration for yourself, tell each other in detail about their own requirements, and only after getting the drawings can feed. But at this time, we should pay attention to the best decoration materials on the market, there are many different models and brands, and the quality is also uneven, we should pay attention to their quality identification when purchasing, and try to buy those economical, practical, cost-effective and green decorative materials.

    3. Precautions for hydropower transformation

    Hydropower renovation is an important project when the rough house is renovated, and the total water inlet valve must be reserved in the kitchen area during the hydropower transformation, and independent electric switches should be installed in the kitchen and bathroom, so that the design can ensure the safety of electricity in the future. When the circuit is renovated, it is best to go to the roof, which is safe and convenient, and the future maintenance can avoid the damp water vapor in the kitchen and bathroom affecting the circuit safety. Under normal circumstances, the sewer pipe does not need to be modified, and the sewer pipe should be wrapped with soundproof cotton when decorating, so that it can play a good business effect and will not be disturbed by the sound of running water after moving in.

  2. Anonymous users2024-02-12

    Before the decoration, we must determine the decoration style in advance, and then we must do a good job in hydropower transformation, do a good job in the sewer work, do not hurt the load-bearing wall in the process of decoration, do not damage the wall structure, replace doors and windows, and then determine the main color in advance; When making water and electricity pipe covers, try to take dark lines, and do a good job of preventing water leakage to ensure voltage.

  3. Anonymous users2024-02-11

    Attention should be paid to safety issues, stability issues, material issues, decoration style issues, and furniture placement issues. When doing hydropower transformation, we should pay attention to the problem of location, pay attention to the problem of dry and wet separation, and also look for professional personnel to help ourselves carry out hydropower transformation, which must be based on convenience.

  4. Anonymous users2024-02-10

    Decoration needs to pay attention to the problem of transformation, and should also pay attention to the problem of waterproofing, when doing hydropower transformation, you should choose waterproof materials to be painted on the wall, and you also need to transform the circuit, you should design the circuit according to the direction, and you also need to install sockets in each room.

  5. Anonymous users2024-02-09

    Note that before slotting, be sure to ask the plumber to mark all the hydropower directions on the wall, and remember to check the hydropower diagram to see if it is consistent. X0D X0A 6. When renovating the waterway, pay attention to the surroundings must be tidy. When concluding a contract for waterway renovation, it is advisable to indicate the materials used in the waterway renovation.

    In addition, in the renovation of the waterway, it is necessary to pay attention to the size of the sewer pipe in the original room, and the pipe connected to the external sewer pipe should be matched with the original sewer pipe. The hot and cold water pipes should be hot on the left and cold on the right, and the spacing should not be less than 20cm, depending on the spacing of the faucet hot and cold pipes. x0d x0a Fourth, during construction, the precautions and some conventional dimensions in the construction of water circuit renovation (emphasis added:

    X0D X0A 1, the general water change to the top does not go to the ground, the cold and hot water outlets must be horizontal, generally left hot and right cool, and the pipeline laying needs to be horizontal and straight. The layout direction should be safe and reasonable. , the position of the pipe clamp and the slope of the pipe should meet the requirements of the specification.

    The hole distance of the mixing valve is generally kept at 150mm (concealed) and 100mm (surface-mounted), and the location of the outlet should be determined according to the height of the room and the personal needs of the owner. X0D X0A 7. The water inlet and outlet of the toilet should be placed in a place where the view can be blocked by the toilet. The location of the outlet should be determined according to the model, and it should generally be left 200mm to the left of the middle of the toilet drain.

    X0D X0A 11. When designing the water pipe, the installation position of the faucet of the washing machine and the layout of the water should be considered. At the same time, pay attention to whether the location of the power outlet is appropriate. When placing a drum washing machine in the kitchen cabinet, be sure to determine the size of the washing machine and kitchen cabinet, so as to leave a good position for loading and unloading water.

    For sanitary ware such as column basins without cabinets below, the height of the reserved mouth should generally be set at about 500-600mm on the ground. The downwater outlet of the column basin should be set in the center of the bottom of the column or behind the column, and be covered by the column as much as possible. The drain pipe of the wall-hung washbasin (no column, no cabinet) must be set up in a horizontal row with an elbow leading from the wall (that is, the sewer pipe enters the wall).

    The coffin of X0D X0A circuit transformation should be selected to meet the national standards of brand products, and the materials must be consistent with the name listed in the decoration company's project **. There should be complete plugs, switches, sockets, and leakage circuit breakers for temporary electricity at the construction site, and cables must be used for temporary electricity. The circuit design should be multi-channel, so that the air conditioner, kitchen, bathroom, living room, bedroom, computer and high-power electrical appliances are wired separately; Sockets and switches are separated, and leakage protectors should be used independently in each circuit except for general lighting and wall-mounted air conditioners; Strong and weak are separated, and the design of weak current lines such as audio, multi-current, and broadband networks should be reasonable and standardized.

    x0d x0a Tips: Waterway renovation is the most common hidden project in the home, whether it is the decoration of the blank house or the renovation of the second-hand house, the waterway renovation is an indispensable construction link. During the construction process, there are many matters that need the attention of the owner.

  6. Anonymous users2024-02-08

    Nowadays, most of the houses we buy back are commercial houses, as long as they are not finely decorated or fully decorated, we get the key to see the rough house, and the water and electricity transformation of the rough house is also the first step of decoration. In fact, for the rough house, some people may not understand its definition, in fact, the initial decoration of the house, water and electricity renovation is a major event in our home decoration, so what should be paid attention to in the water and electricity transformation of the rough house? Next, let's take a look at the relevant content of the water and electricity transformation of the blank house.

    Hydropower renovation of blank house 1,

    During the construction process, try to minimize the unnecessary joints of the pipe body in the wall, and there is no way to connect the external faucet, toilet, and basin. Wrap all the piping joints with hemp silk and white paint, tighten them, and distribute them in place in accordance with the horizontal and vertical distribution, if there is a ground pipeline crossing, the secondary pipe must be installed under the bridge under the main pipeline, so that the overall water pipe distribution is maintained on a horizontal line.

    Blank house water and electricity renovation 2

    Precautions for the decoration of the blank room: All water places must be installed sewer pipes and floor drains, and the pipes of the PVC pipes must be coated with special PVC glue when they are connected, and they must be evenly covered. And pay attention to the horizontal drop when connected to the main sewer pipe embedded in the original blank house, it should be kept static for 6 hours.

    Hydropower renovation of the blank house 3

    Precautions for the decoration of the blank roomAfter the pipe bucket roll is distributed in place, the pipe must be stuck at the turn or where there is a standing faucet, so as not to loosen. Special pipe clamps are required for water pipe fixing.

    Rough house water and electricity renovation 4

    The aluminum-plastic pipes or PPR pipes used must be qualified products that have been inspected and shipped out of the factory. Different colors should be used for hot and cold water pipes.

    Blank house water and electricity renovation 5

    Try to use light and rigid keel for water pipes, and cement board tiles are the most problem-prone places, so pay attention to the ceramic tiles soaked in water in place, and choose the best cement.

    Hydropower renovation of the blank house 6

    Precautions for the decoration of the blank room, kitchen hygiene, so that the slots need to be waterproof.

    Rough house water and electricity renovation 7

    If the main sewer pipe embedded in the original blank house is not enough or not ideal, not in place, it can also be re-opened in the floor according to the actual situation to lay the sewer pipe, re-seal the pipe with fireproof mortar, and use cement mortar potato pin lead to enclose a 10mm high circle in the newly sealed place, after 48 hours of solidification, the circle is filled with water, and after 24 hours of infiltration downstairs to see if there is water seepage around the newly installed sewer pipe.

    For example, if it is not certified, the new pipeline will be qualified, otherwise it will need to be re-treated and the water seepage test will be done until it is qualified. In addition, in order to facilitate maintenance in the future, the number of hours of water pipe is reserved, and the manhole is slightly larger.

Related questions
13 answers2024-07-28

What do you need to pay attention to in the decoration of the rough house? What should I do first? >>>More

4 answers2024-07-28

The renovation process consists of three stages. At first, it is the design stage, which requires the main decoration designer to communicate to understand the style that the owner likes, and integrate the popular trends into it, and determine the design plan before starting to screen the decoration company. >>>More

7 answers2024-07-28

First, we must first look at the wall of the house, it is best to take a small piece of wood in our hands, knock on the wall, listen to see if there is a hollow drum sound, this is easy to hear, if the wall is not real, it will make an empty sound. Finally, it should also be noted that after the house inspection, the problems found must be counted in writing, and the property management office must be informed of the existing problems, and the solution and time must be agreed. Keep a fresh mind and use legal means to protect your legitimate rights and interests. >>>More

7 answers2024-07-28

The steps and methods of water and electricity decoration of the blank room are as follows: >>>More

10 answers2024-07-28

Point 1: It is particularly important to carefully check the quality of the house, and when checking the quality of the house, you need to pay special attention to the following points: use a ruler or wooden board to measure whether the ground is flat, if it is not flat, there will be trouble when laying the floor in the future; Check the walls of the house and the connections to the balcony for cracks. >>>More