What should I do if I accept the rough house? How to accept the blank house

Updated on home 2024-07-16
7 answers
  1. Anonymous users2024-02-12

    First, we must first look at the wall of the house, it is best to take a small piece of wood in our hands, knock on the wall, listen to see if there is a hollow drum sound, this is easy to hear, if the wall is not real, it will make an empty sound. Finally, it should also be noted that after the house inspection, the problems found must be counted in writing, and the property management office must be informed of the existing problems, and the solution and time must be agreed. Keep a fresh mind and use legal means to protect your legitimate rights and interests.

    In the precautions for the inspection of the rough house, the inspection of the wall is very important, and the inspection should be done by gently tapping the wall with your hands, judging whether the wall is hollow from the sound, and visually inspecting whether there are cracks on the wall. The four common cracks: strength cracks, settlement cracks, temperature cracks and the basis of each link, and standards, this need of friends can be collected and preserved, compared to the so-called free house inspection of the decoration company is a hundred times more professional, this is for the inspection of the house, many free house inspection of the decoration company is a gimmick.

    Since it is a rough room, you only need to pay attention to two points, the first is to see if there is a water leak, such as the balcony, bathroom and kitchen, the main thing is to see if there is a watermark on the ceiling, this is the most important thing, otherwise it will be very troublesome in the later stage. In addition, if there is no time to go to the designated place to go through the relevant closing procedures within the agreed time, from a legal point of view, it is generally deemed that the developer has actually delivered the house to the buyer, and the buyer should bear all the risks and responsibilities and taxes from the deadline of the notice.

    The hardcover room is also known as the "finished room". Hardcover requires "refinement and integration", while not losing the status and identity of the protagonist, as well as his personality and taste. The hardcover room pays attention to the scrutiny of every detail, as large as the overall space structure of the house, the choice of decoration style, small yuan door, corridor, etc., and then look at the door, window, ceiling, wall, air, wall tiles, floor tiles, high and low water, waterproof water storage, strength and weakness, each period, ventilation, exhaust, and finally check the closed water storage experiment, water meter idling and other issues must be cooperated with the upstairs and downstairs neighborhoods.

  2. Anonymous users2024-02-11

    First of all, we have to bring our own house collection tools, such as tape measures, small hammers and the like, etc., and then we begin to check the details of the house, such as walls, ground, doors and windows, drainage, waterproof circuits, etc., especially waterproofing here must be carefully checked, if there is a problem, they can also be dealt with in time, and then after the house is checked clearly, we can sign the housing inspection handover form, and make an appointment for the next acceptance.

  3. Anonymous users2024-02-10

    1. Remember to ask for "three books and one table". 2. Sign the "Property Management Convention" before signing the acceptance form. 3. The rough house inspection should look at the six sides of each room of the house.

    4. The rough house inspection should take a closer look at the cracks. 5. The inspection of the rough house focuses on waterproofing. 6. The doors and windows of the rough house inspection are very important.

  4. Anonymous users2024-02-09

    First of all, we should pay attention to the selection of materials for the rough house, but also pay attention to the overall structure of the rough house, but also whether the operation is firm when accepting, and some home decoration should also pay attention to whether it is moisture-proof and waterproof, and the layout of the rough house should also be strictly carried out.

  5. Anonymous users2024-02-08

    We can use the level to check the flatness of the ground, be sure to check whether the wall is vertical, check whether the plastering is smooth, whether the partition window is leaking, rain leakage, whether the pipe is blocked, etc.

  6. Anonymous users2024-02-07

    Since the rough house is a house that has not been renovated, it is necessary to pay attention to all aspects of acceptance. So how to accept the rough house? Let's take a look.

    1. All exterior finishes, including the exterior finishes of balconies and rain covers, should be completed according to the design documents. When handing over the house, the real estate developer should provide three books, one certificate and one table, namely, "Construction Project Quality Certificate", "Residential Instruction Manual", "Residential Quality Assurance Certificate", "Real Estate Development and Construction Project Completion Comprehensive Acceptance Certificate", and "Housing Construction Project Completion Acceptance Record Form".

    2. Common parts, public facilities, various pipelines (supply, drainage, rainwater, heating, heat), electrical equipment (distribution boxes, cabinets, panels, socket sections, switches, lamps, etc.) should be completed according to the design documents, and various test items should be completed according to the regulations.

    3. All kinds of pipelines in Hongling should also carry out acceptance work such as water passing, pressure test, ball test and heating thermal commissioning.

    4. Carry out water storage and water drenching tests for roofing projects.

    5. If the prefabricated floor slab or cast-in-place slab roof is used in each room within the door, it should be leveled without plastering and putty, and the slab seams are dense and crack-free, and the surface is smooth, the color is basically uniform, and the line angle is straight. The concrete of the base floor of each room within the door should be smooth and compacted to achieve firm bonding and no cracks.

  7. Anonymous users2024-02-06

    Home inspection should be paid attention to: 1Check the wall, see if the wall is cracked, use the ruler to close to the wall to check the flatness, the gap is reasonable within centimeters, and hit the wall with a hollow drum hammer, and the empty drum in a room can not exceed two places.

Related questions
11 answers2024-07-16

Introduction: For owners who are not connoisseurs, it is a very troublesome thing to accept the rough house. But as long as you master some tips and bring the tools of the house inspection, it is not difficult to accept the rough house. >>>More

4 answers2024-07-16

The renovation process consists of three stages. At first, it is the design stage, which requires the main decoration designer to communicate to understand the style that the owner likes, and integrate the popular trends into it, and determine the design plan before starting to screen the decoration company. >>>More

1 answers2024-07-16

We first have to look at the wall of the house,it is best to take a small piece of wood in our hands,knock on the wall,listen to see if there is a hol

10 answers2024-07-16

Clause. 1. Check the direction of the water pipes in the house, and carefully check whether there is any possibility of water leakage and seepage along the way, and be sure to strangle this possibility in the cradle to see if there are any complaints downstairs. This is critical. >>>More

9 answers2024-07-16

1).Check the wall and hit the wall with your hand to determine whether the wall is hollow; >>>More