Wall demolition, water and electricity renovation, waterproofing, including risers, waterproofing, gypsum board ceilings in living and dining rooms, TV background walls, finished gypsum lines in bedrooms, and wall paint for the whole house. That is, you only need to pay according to the contract, and you don't have to worry about the rest, all the materials and manpower are borne by the decoration company, which is suitable for friends who have economic strength and no time to ask for decoration. If you think what I'm saying is too simple, here's a detailed version.
<> clear, half-pack and full pack. The cleaning package only contracts the labor and does not package the materials, and the auxiliary materials and main materials are purchased by the owner himself. Half package means that auxiliary materials such as cement, yellow sand, wires, water pipes, putty and so on are provided by the decoration company, and the main materials such as wall and floor tiles, floors, cabinets and wardrobes are purchased by the owner.
Tile purchase, wood floor purchase, cabinet purchase, door purchase, aluminum alloy door purchase, wallpaper wall covering purchase, diatom mud shell powder purchase, custom cabinet purchase, switch and socket panel purchase, downlight, LED light strip, main lamp, wall lamp purchase, sanitary ware bathroom purchase, etc.
Even if you give it all to the renovation company, you can't completely be the shopkeeper, after all, you and the renovation company only have a relationship with money, and there is only one transaction. So you can't expect them to serve you as God, all the contracts are signed clearly, the money is distributed and paid, and you have to pay more attention to the whole package depends on how to define it, it is divided into whole and bag check-in. Generally, the whole assembly includes the main materials, auxiliary materials and labor, that is, the commonly said contracted labor and materials, and the main materials.
Generally, it does not include furniture, household appliances, and soft furnishing accessories.
In other words, all material procurement and construction are the responsibility of the construction party. Therefore, for the owner, this is one of the most worry-free decoration methods. It is a form of "one-stop service" provided from design to purchase materials to construction.
It is necessary to package the materials used in the project of a qualified decoration company and the wages of the contractor. Raw materials. of the material.
Deadline for delivery. Be sure to sign a contract with the quality requirements you are asking for. When you complete the acceptance, you must find a qualified person to help you accept the acceptance first and see what the problems are.
-
The whole package repair includes the project, the purchase of raw materials, such as water pipes, cables, sockets, switches, lighting fixtures, etc., as well as engineering projects, which include the demolition of old walls, new walls, bridge racking, decoration of toilets, living balcony walls, bricks and floors, etc., and the full package repair content includes the labor costs and labor wages of interior decoration, and the decoration of all-inclusive auxiliary materials includes the meaning of full-package repair, that is, contracted labor and materials, and the decoration company in accordance with the provisions clearly proposed by customers. to purchase raw materials that are often necessary in engineering projects, including engineering construction.
-
Including the construction of the wall and the construction of the ground, there are some details such as water and electricity, as well as the partition design of the house, some of which also include the purchase of furniture, and some heating, Internet, and TV line configurations.
-
Including water and electricity renovation, design modeling, construction and purchase of furniture, and it is a choice of materials, wall demolition, wall modification, etc., these are all full-package projects.
-
The whole package repair is generally to include all the decoration in your home, mainly including the main materials, auxiliary materials, construction and labor and other projects, this all-inclusive decoration is very convenient, do not worry, directly all included.
-
Include a lot of things, such as your doors, windows, floors, suspended ceilings, cabinet wallpaper, tiles, light fixtures, which are all included.
-
Including materials, including labor, including design, including management, including soft furnishings, including cleaning, these are all included in this project.
-
The whole package of the decoration company is the contractor and the material, which includes not only the main materials and auxiliary materials, but also the construction and decoration; All-inclusive is the most worry-free way to decorate, so the majority of owners choose this type of decoration.
Click here to intelligently match 3 professional decoration companies for you, free ** design and comparison: enter the area, and get the local decoration company with one click.
1. Main material. Commonly used main materials are flooring, including wooden skirting; wall tiles and floor tiles in ceramic tiles, etc.; sinks, water purifiers, etc. in cabinets; toilets, bathtubs, ceiling materials, etc. in sanitary ware; All kinds of lamps in lamps, such as spotlights, downlights, ceiling lights, etc.; Hardware includes hardware pendants, drying racks, door locks, etc.; finished doors, wardrobe doors, sliding doors, etc. in doors and windows; There are also other main materials such as curtains, decorations, wallpaper, etc.
2. Auxiliary materials. Auxiliary materials such as water pipes and fittings, wires and wire pipes used in water pipe decoration; ceilings and wall decoration will be used in various materials keel, paint, latex paint, paint, etc.; The more commonly used cement, sand and gravel will also be provided; All kinds of base boxes, as well as adhesive tapes are also in the auxiliary materials.
3. Decoration construction.
Construction includes more, home walls and decoration, demolition, wall masonry, baseboard and other construction;
Hydropower transformation, laying of wires and waterways, laying of toilet water pipes, and leveling construction of the ground;
Waterproofing will also be done, pay attention to the wall waterproofing should not be lower than the meter effect is better;
Ground leveling is mainly for the ground leveling treatment of each room;
The construction of tiling involves wall tiling and ground paving, and each space of the house will be involved, pay attention to the gaps and smoothing of the brick surface;
Wall construction will also involve gypsum, putty and other issues, and the surface layer of latex paint will be brushed only after it is done;
After that, it is woodworking, and the carpentry needed at home is mainly cabinets, wardrobes and TV cabinets, etc., and other woodenware can also be made, but the moisture-proof problem should be considered. At the time of production, the requirements for the craftsmanship of the carpenter master are too high;
The rest is the installation and construction, mainly the installation of sanitary ware and hardware pendants, as well as the installation of lamps and curtains throughout the house.
Hope it helps
-
The full package repair includes the following items:
1. Basic decoration, that is, the demolition and construction of walls for civil engineering transformation; Tiling of brick-cutting works; Ceilings, cabinets, TV walls, and background walls for woodworking projects.
Latex paint for modeling and painting work.
base and bottom coat construction; waterproofing and water pipes for kitchens, bathrooms and other spaces; bedroom floors, etc.
2. There are five main materials: doors and door sets.
Cabinets, sanitary ware, flooring, floor tiles.
Among them, the basic decoration includes the installation cost of floor tiles, and the rest is installed by the first business package.
3. Soft decoration: including wallpaper, decals, curtains, fabrics, decorations, etc.
4. Furniture: It is a large cost of all-inclusive projects, and many decoration companies are now doing so.
All-inclusive furniture does not include all furniture, only sofas, wardrobes, beds, etc., excluding coffee tables, entryway cabinets, TV cabinets, etc.
5. Home appliances: mainly TVs, refrigerators, washing machines, air conditioners, microwave ovens, kitchen and bathroom stoves, bath bomb ovens, computer speakers, etc., and there are very few decoration companies that include all-inclusive household appliances.
Precautions for full package repair.
1. The material information should be written comprehensively.
Decoration materials determine the quality of construction, and decoration materials determine construction. For this reason, the information of the materials in the contract must be clearly written, with specific brands, specifications and models. In addition to the main material, we must also pay attention to the details of the auxiliary material.
Therefore, the materials should be scheduled. Ensure the overall quality of the project and arrange the cost reasonably.
2. Specify the time and frequency of supervision and quality inspection.
As we all know, the renovation company will be equipped with supervision and quality inspection, and they will supervise the construction quality and project progress.
Generally, the renovation company will assign the project to each construction team to complete, and the time interval between their on-site inspections is particularly important to the quality of the project. Supervision and quality inspection should be present every 2 days.
3. Specify the responsible party for the construction.
Who is responsible for any problems with the use of materials, and who is responsible for poor construction quality? These must be clearly stated in the contract, and these must be clearly written in the contract. Generally, the warranty period of the decoration company for the project ranges from three months to one year, and the company with a longer warranty period should be chosen as much as possible.
-
The whole package repair includes main materials, auxiliary materials, construction and labor projects. This decoration method basically does not need the owner to worry about it, saving worry, time and effort. Although it is a full-package repair, the decoration company will design according to the needs of the owner, and all purchased materials will be purchased with the consent of the owner.
Full packing repair list.
Wall modifications: demolition of old walls, trunking and beating, masonry walls, and downspout isomers. Wire (strong current, weak electricity), water pipes (cold and hot water pipes), air pipe materials and installation and laying.
Toilets are laid with drainage pipes, and lightweight materials are backfilled and leveled. Bathroom, kitchen, balcony wall (not less than meters), floor waterproofing. The floor of each room is leveled.
Floor tiles in the living room and balcony with a view. Kitchen, bathroom, living balcony floor tiles, wall tiles paving. Scrape putty on the top and wall bases, and brush latex paint on the surface. bathroom sanitary ware and hardware installation; All the lamps in the room are installed.
Disadvantages of all-inclusive renovation.
The disadvantage of all-inclusive is that the construction party is afraid of shoddy. Due to the high cost, the materials and the variety are complex, for novices, even if the decoration company is empty, the owner is difficult to identify.
Decoration half package. Semi-package means that the decoration company or construction party is responsible for design, auxiliary material procurement and construction. The owner is responsible for purchasing the main materials such as tiles, flooring, sanitary ware, cabinets, etc.
Half package suitable for people: have a certain ability to identify the main materials of decoration, and have time to buy, and at the same time to sign a detailed decoration contract with a regular decoration company to avoid omissions and changes in construction.
-
It mainly includes hydropower projects, masonry projects, carpentry projects, paint projects, tile walls, doors and windows projects, sanitary ware projects, ceiling projects, cabinet projects, hardware projects and so on.
1. The basic decoration in the decoration package includes wall modification, water pipe and wire laying, waterproof engineering, room ground leveling, floor tile wall drilling and paving, wall treatment, bathroom sanitary ware installation, lamp installation, etc.
2. The modeling part includes the modeling design and installation of the TV background wall; Living room, dining room, master bedroom, entrance, cloaker ceiling project.
3. The carpentry part, mainly shoe frames, cabinets and TV cabinets, these parts can be purchased as finished products, or they can be customized for the decoration company, depending on the owner's personal preferences and habits.
Precautions for decoration package:
1. Although the decoration package is worry-free and labor-saving, it should be noted that because the time for the owner to participate in the whole process is relatively small, the construction unit may lie about the materials and earn the price difference.
2. Home decoration should not only look good, but also have practicality, if you encounter a construction company with little experience or laziness, it may only do superficial work, and lack of practicality, so when looking for a decoration company, you should pay attention to finding a good decoration company.
The villa master provides you with local building policies, building drawings, and villa design drawings;
Villa appearance renderings service, thousands of popular drawings for you to choose.
Villa Master.
-
The general all-inclusive package includes the following:
1. Main materials: floor tiles, wooden floors, ceilings, stones (door stones and bay window stones), doors, door sleeves, baseboards, cabinets, sanitary ware (toilets, showers, bathroom cabinets).
2. Auxiliary materials: sand, cement, tile adhesive, putty powder, wall paint, waterproof materials, switch panels, of course, these items are adjusted according to the price they can accept. If the price is high, the main materials also include custom cabinets and stoves.
-
Furniture and appliances are not included in the full package.
The full package repair includes the doors and windows, cabinets, tiles, ceilings, paints, wallpapers, lamps, hardware and some auxiliary materials, but does not include the reeds and electrical appliances of the family, furniture and electrical appliances are to be purchased by themselves, and are not within the scope of the decoration package. Among them, furniture includes: beds, sofas, wardrobes, curtains, TV cabinets, etc., electrical appliances include kitchen appliances and household appliances, and the electrical appliances in the grandson room of Chusen Town usually refer to:
Microwave ovens, dishwashers, wall breakers, electric ovens, induction cookers, etc., household appliances usually refer to: washing machines, refrigerators, air conditioners, electric fans, etc.
The whole package of the decoration company is the contractor and the material, which includes not only the main materials and auxiliary materials, but also the construction and decoration; All-inclusive is the most worry-free way to decorate, so the majority of owners choose this type of decoration. >>>More
1. Decoration can not be arbitrarily pierced in the load-bearing wall, remove the wall connecting the balcony and doors and windows, and expand the original door and window scale or build another door and window, this practice will form a high-rise building * crack and seriously affect the seismic ability, and then shorten the life of the high-rise building. >>>More
Decoration is a big project, people know that there are more details to pay attention to when decorating, if you want to be very careful in each step, the basic decoration mainly includes the following major items: Ground engineering, including chiseling tiling bricks and waterproofing Wall engineering, including wall demolition, wall building, putty, grinding, latex paint, and TV wall base and other top engineering, mainly ceiling engineering, including wood keel or light steel keel, integrated ceiling and other wood engineering, mainly including door cover base, shoe cabinet and wardrobe production and other painting works, Mainly on-site wood paint treatment and other auxiliary materials used, such as putty, cement, river sand, woodworking board, gypsum board, latex paint, wires, PPR pipes, etc., are included In addition, waterway and circuit transformation, garbage removal, etc. are also basic decoration, but most decoration companies are separate.
If you want to know the specific decoration**, you can use the "decoration artifact" ** device to calculate, just enter the area + city, immediately calculate the local decoration**, list the detailed list of 102 decorations, so that you don't have to worry about overspending on the decoration, click here to start calculating: [3 seconds to get the local decoration**]. >>>More
What items are included in the construction project are explained below:Construction works include: civil works. >>>More