-
1 Slatted keel.
Place the slats keel hanger on the large keel or fix it on the boom (when there is no large keel), hand the slats keel up, and make the lower end of the hanger buckle the slats keel.
2. Load the slat, hand the aluminum table gold bar up, so that its two losses and 6 hanging edges are buckled on the flange of the lower part of the slat's keel. If a slat plate is used, the slat plate is embedded in the seam of the slat.
3 Install the wall panels.
The installation of wall panels before or after the slats should be based on the construction. The wall board can be nailed to the wall embedded brick with a round nail, or it can be drilled in the wall and stuffed into the plastic expansion pipe, and after the wall plate is in place, it is screwed into the expansion pipe with a screw to fix the wall board.
-
Clause. First, the installation of the ceiling pre-construction preparation.
Before the construction of the ceiling, it is necessary to check whether the structural dimensions are consistent with the preparatory design drawings; Whether the equipment pipeline is installed clearly; Whether the ceiling installation materials and tools are complete.
Clause. Second, smallpox base treatment.
Before installing the ceiling, the ceiling should be inspected and remedial measures should be taken immediately if the quality does not meet the construction requirements.
Clause. Third, the ceiling elastic line positioning.
There are two kinds of ceiling elevation lines and keels respectively. The elevation line can mark the position of the ceiling plane with the water column method, and the elevation line can be popped up according to the position; The positioning of the keel should be arranged according to the size of the veneer and the position of the keel. In order to make installation easier, it is recommended that the centerline spacing should be about two millimeters in the size of the veneer.
When you are arranging the keel grid, try to ensure the uniformity and integrity of the keel grid, so that the ceiling has a more regular decorative effect in the later stage. First of all, draw the ceiling area in the drawing according to the proportion, and then arrange the ceiling keel on the paper according to the principle of keel arrangement. Once you have determined the location, position it on the wall.
Clause. Fourth, fix the boom.
The hanging piece is generally fixed with expansion screws or nails, and then the galvanized iron wire used to hang the keel is fixed on the hanging piece through the hole in the angle steel block. The suspension is recommended to be made of telescopic boom material. The types of telescopic booms are more diversified, and the more common ones are straightened with No. 8 lead wires, and the two lead wires are connected with a spring steel sheet with holes, and the spring steel sheet is mainly adjusted and fixed.
Clause. Fifth, install the keel.
The keel is divided into primary and secondary keels. Keel spacing can be measured with a die gauge. First of all, the main keel is hoisted, and then a temporary fix is made at a position higher than the elevation line, if the ceiling area is slightly larger, it is recommended to hoist several parts.
Then install the secondary keel between the main keel, which is often referred to as the cross-brace keel. The length is then measured using a die gauge and the installation is complete.
-
Foshan Meililong said that the installation of aluminum gusset ceilings mainly relies on keels and tie rods to carefully fix and control, so in some aspects must not be ignored! Do these five points, install the aluminum gusset ceiling without worry!
1. Install aluminum trimmed corners at the same height.
2. Lift the boom and the light steel keel at appropriate intervals, with the boom spacing below the meter and the light steel keel at the interval.
3. The vertical direction of the pre-installed boom on the triangular keel and the light steel keel is connected by the plate spacing, and the aluminum ceiling manufacturer said that the horizontal adjustment is very important as the last step. It is related to the smoothness of the overall ceiling.
4. The two sides of the square plate are pressed into the triangular keel joint in parallel, first install the transverse sides to find the right side, and then straighten them line by row. (Note that the side of the square plate has a small hole in the direction of inserting into the triangular keel).
5. Gloves must be worn when gusshing the plate. If you accidentally leave dirt on the board, wash it with clean water. Do not tear off the protective film when installing.
-
1. Use of materials and tools.
The size is 30*30cm square aluminum alloy ceiling.
Ceiling keel materials, including baseline light steel, ceiling.
Hanging wires for fixing keels, including height-adjustable steel bars, hooks, and screws.
A cutting machine for cutting keel material.
Second, lay the keel.
Install the footing. Because the keel is installed according to the standard of the baseline, the height of the baseline must be measured before deciding.
Measure the length of the footline according to the dimensions of the room.
After installation, the footing must be flat and close to the edge of the tile.
After installation, in order to ensure the smoothness of the foot line, you have to use a level to measure it again.
Install the hanging wire. According to the actual size of the room, measure and determine the appropriate installation location.
Use an electric drill to drill a hole and then drive the hanging wire into the hole. The depth of the hole is about 3cm to ensure the firmness of the hanging wire.
What it looks like to install the hanging wire. The flatness of the hook at each lower end of the hanging wire can be ensured by adjusting the screws.
Since the hanging wire bears the weight of the entire ceiling, you can experience its firmness with your own hands.
Install light steel. Use a chainsaw to cut out light steel material that fits the length of the room.
Fix the light steel on the hanging line. A light steel must be fixed with hanging wires at both ends to ensure firmness.
After the light steel is installed, the two ends of the light steel should also be flat.
There is a distance between the light steel and the footing after installation, which is left for the keel installed below.
Laying the keel. Wear the keel between the footline and the light steel, and fix both ends on the footline.
The junction of the keel and the light steel must be fixed with a special metal joint to ensure that it does not loosen.
When installing, always pay attention to the spacing between the keels and make adjustments. The spacing is just 30cm in width of the ceiling.
It can be seen that the keel spacing after installation and adjustment is very even.
3. Install the ceiling.
Install the ceiling. The edge of the aluminum alloy ceiling is sandwiched into the gap of the keel.
Forcefully lift the ceiling upwards so that the edge of the ceiling is completely fixed in the crack.
Refer to the position of the adjacent ceiling, adjust the position of the ceiling in time to achieve neatness.
The edges of the two adjacent ceilings are completely submerged in the keel gap, so as to ensure that the ceiling is firm and not loose.
Installation of corner edge ceilings.
The dimensions of the ceiling edges are not the same as the size of the ceiling and must be cut before installation.
Due to the wall blocking, it is inconvenient to fix the ceiling interface, and the workers have to fix the ceiling from many aspects.
Break off the metal buckle on the foot line against the edge of the ceiling, so as to ensure that the edge of the ceiling does not arch and seam.
After the construction of the above process, the ceiling is installed. It can be seen that the gap between the ceilings is horizontal and vertical, and there is no arching phenomenon at the edge.
Hope the above can help you
-
Aluminum alloy decorative slatted wall coveringThe strips are becoming more and more diverse. Some homes use wall protectors to protect the walls. This not only protects the walls from damage, but also creates a personalized living space.
Next, install the wall-mounted strips and wall-mounted aluminum alloy strips.
How to decorate aluminum alloy decorative partition walls.
Aluminum alloy ruined decorative slatted wall coveringThrough wood decoration aluminum alloy decorative strip wall aluminum alloy line.
Aluminum alloy wire rod has excellent strength, wear resistance and corrosion resistance. The surface is anodized with a clean metallic luster, good light and weather resistance, and the surface is covered with a transparent film of strong electrophoretic paint. Plastic decorative lines are divided into angle lines, edge pressing lines, edge banding lines, etc., their shapes and specifications are the same as wooden lines, and the fixing method of plastic decorative lines is generally fixed by screws or binders.
Aluminum alloy decorative slatted wall coveringOrdinary wood.
Decorative plastic lines are divided into pressure lines, pressure lines and edge sealing lines. The shape and size are the same, and the decorative plastic wire fastening method and neckline are usually fixed or bonded with screws for the characteristics of corrosion resistance, friction, water resistance, and excellent decorative effect of the stainless steel wire production line. The decoration material is high-end, mainly used for the pipeline pressure receiving line, and the decorative line is pressed in all corners of the column corner.
Aluminum alloy decorative slatted wall coveringOrdinary wood.
Attention should be paid to the installation of aluminum alloy decorative strip wall, the installation is more beautiful, the space is too large, and it can be filled, so the error does not exceed 1mm. Pay special attention to the width of the wall line when connecting the wall line with the cylinder. The upper and lower flat wires should be carefully inspected.
For rectangular columns, there should be no cracks, the quality is mainly concentrated on the door or window frame, decorative lines are strictly prohibited, and they must be kept beautiful. Please lay a good floor before installation to avoid unclear space. The wall line of the exterior wall is used indoors.
Please pay attention to the time of elaboration. Do not pierce the walls. Do not dig into the wall to keep it clean.
What is the installation method of wall decoration strips and wall trim strips introduced here, I will try my best to find the answer to the question of dating decoration and architectural decoration. Take a look at other aluminum alloy trims.
You can get it for free
-
The ceiling will not only be installed at home, but also installed in many large public places or companies, the ceiling area in the home is generally smaller, and the ceiling process steps and materials used are relatively few, but for the place where the ceiling area is relatively large, the ceiling used is generally the aluminum strip ceiling, many users and friends do not know much about the aluminum strip ceiling, and it is not clear how to construct it, so today I will introduce the information on the construction of the aluminum strip ceiling.
What are the preparations for the construction of aluminum strip ceilings
After installing various pipelines and equipment in the ceiling, determine the location of lamp positions, vents and various lighting orifices; Before the installation of the roof cover panel, the wall and floor wet operation project should be completed; Set up the roof construction operation platform shelf; Before the large-scale construction of the light steel skeleton roof, the model room should be made, and the camber, light trough, curtain box, and vent of the ceiling should be constructed, and then the large-scale construction should be carried out after identification.
The specific steps of aluminum strip ceiling construction
Springline: According to the floor elevation level, according to the design elevation, play the ceiling elevation line along the wall, and find out the center point of the room, and along the elevation line of the ceiling, draw the keel binning position line on the wall with the center point of the room.
Install the main keel boom: after the elevation level line of the roof and the keel position line are played, determine the elevation of the lower end of the boom, install the pre-processed boom, and the boom installation is fixed on the roof with Pa expansion bolts. The boom is made of round steel, and the spacing of the boom is controlled within the range of 1200mm.
Install the main keel: the main keel is generally C38 light steel keel, and the spacing is controlled within the range of 1200mm. When installing, the hanging parts matched with the main keel are used to connect with the boom.
Installation side keel: according to the ceiling net height requirements, the 25 25mm paint keel is fixed with cement nails around the wall, and the distance between cement nails is not more than 300mm.
Install the secondary keel: according to the specifications and dimensions of the aluminum gusset plate, install the secondary keel matched with the plate, and the secondary keel is hung on the main keel through the hanging piece. When the length of the secondary keel needs to be extended by multiple continuations, the secondary keel connector is used to connect the opposite ends while hanging the secondary keel, and is straightened and then fixed.
Cleaning: After the installation of the aluminum gusset, all the surface of the plate should be wiped clean with a cloth, and there should be no dirt and handprints.
In today's article, you can see that we are around the construction of the aluminum strip ceiling to introduce, before the formal construction of the aluminum strip ceiling, we need to seep to know what preparations we have to make, there is no kind of ceiling engineering is not required to prepare in advance, after the preparation steps are completed, we can start the construction, the specific aluminum strip ceiling construction steps we have listed, we can directly use it in the process of construction, but the unclear part must be clear in advance.
You can get it for free
-
1.Set the springline. Use the level to copy out the horizontal point in the corner of each room, and pop the horizontal line out, and use the pink line to pop up the horizontal line along the wall column is the lower skin line of the secondary keel of the ceiling.
2.Fix the boom pendant. The length of the ceiling rod should be less than 1000 mm, and then the reverse support should be set.
The boom can be used disc bar or cold wave bar, if the disc bar is used, the disc bar should be straightened by machinery.
3.Hang members are arranged on the beam. The selected hanging rod should have sufficient bearing capacity, if the rod needs to be extended per mu, it must be welded firmly when building, and the weld needs to be full.
4.Install the keel. When installing the keel, the keel should be hung on the boom, the spacing of the keel should be between 900 mm and 1000 mm, the direction of the keel should be parallel to the length of the room, and the suspension of the hip section of the keel should not be greater than 300 mm.
-
The ceiling has a great impact on the effect of decoration, so many users are more cautious about the choice of the ceiling, there are many kinds of popular ceiling materials, different materials show different ceiling effects, characteristics and performance are not the same, the current more popular solid wood ceiling, gypsum ceiling, and aluminum ceiling. The most common aluminum ceiling is used in the kitchen and bathroom ceiling, the effect of aluminum plate ceiling is better, and the life of use is also very long, the following is the installation method of aluminum plate ceiling.
Springline
According to the floor elevation level, use the ruler vertical vector to the ceiling design elevation, bounce on the roof on the keel position line, and bounce the elevation line of the roof on the wall.
Install the main keel boom
After the elevation line of the roof and the position line of the main keel are played, the elevation of the lower head of the boom is determined, and the one end of the boom without bolt slag is fixed under the floor slab with an expansion bolt according to the position of the main keel such as the mausoleum and the hanging spacing; 6m steel bar (8mm flat steel) for the boom.
Install the main keel
Assemble the boom nut, precipitously code the hanger on the main keel, assemble the main keel of the hanger, make the hanger penetrate the corresponding boom bolt according to the position of the gear line, tighten the nut, connect the main keel, install the connector, adjust the elevation and straightening of the cable, install the hole and attach the main keel, and set up and connect the clamping.
Install the secondary keel
According to the bounced secondary keel binning line, the secondary keel triangular hanger is clamped, the wooden keel is used, and the spacing of the secondary keel is 600mm; According to the spacing of the main keel specified in the design, the secondary keel is hung on the main keel through the triangular pendant; When the length of the secondary keel needs to be extended by multiple threads, the secondary keel connector is used to connect and straighten and fix the secondary keel while hanging the secondary keel.
Install the side aluminum strips
The specification of the side aluminum strip is: 25mm*25mm, and the elevation of the installation ceiling requires that the aluminum strip on the side of the wall is fixed with cement nails.
Install the aluminum gusset
When installing the ceiling aluminum gusset, press lightly along the flanging part, completely card both sides of the square plate into the secondary keel, and then push it tightly, and it is strictly forbidden to barbaric loading and unloading; And straighten the side aluminum strip card while fixing the edge aluminum plate. According to the design requirements, the ceiling of this project adopts 600mm*600mm perforated aluminum gusset.
Install light fixtures and vents
According to the ceiling plan, arrange the lamps and vents; At the same time of installing the aluminum gusset, open holes according to the size of the lamps and vents, and install the lamps and vents.
Compared with other ceiling materials, the construction of aluminum plate ceilings is relatively simple, but the basic construction process is not much different, and it is also installed through the skeleton. Whether the effect of the aluminum plate ceiling is good or not mainly depends on whether the construction process is fine, and every step of the aluminum plate ceiling must be carried out strictly to ensure the flatness of the installation and the firmness of the ceiling. The aluminum plates are connected by clamp strips, so we must pay attention to the treatment of the seams when installing, so as not to cause safety accidents.
You can get it for free
Aluminum profile protective door is used for safety protection around all kinds of automated production equipment, robots, punches and other equipment in the factory workshop. In some areas, doors or passages will be installed to facilitate the entry and exit of goods and personnel maintenance. Aluminum profile protective door can not only be customized according to the needs of the site, but also due to the diversity of industrial aluminum profile varieties and connection methods. >>>More
Hello! The strength of the aluminum plate is an indication of how much MPA pressure or tension the material will deform under the pressure or tension, and if you want to check the strength, you can use a tensile testing machine to check. When deformation occurs, the maximum weight that the aluminum plate can bear can be determined by looking at how much force n is used. >>>More
Skirting boards. installation for home improvement.
It is not a big project, but it should not be underestimated, the baseboard is mainly to protect the wall from the impact and balance the indoor visual effect, the baseboard installation effect is not good, its role can not play a role, and even affect the overall effect of home decoration. I believe everyone wants to know the specific installation method and installation of the baseboard, and the following Tuba Rabbit will come together for everyone: >>>More
Aluminum alloy plates are divided into domestic and imported. >>>More
The ceiling lamp is installed on the gypsum board ceiling, and the installation bolts can not be difficult and easy to fall off, so I suggest that the method is to use extended expansion screws. >>>More