-
When decorating your home, you can first paste the floor tiles, and then lay a mat on the floor tiles to paint the wall.
-
Brush the wall first, and then stick the disadvantages of the floor tile: the dust generated in the "making" process of the cement mortar of the paving layer, the careless "material splash", and the "stains" such as the cement mortar splashed in the process of paving the floor tiles, the activity range is large and there is the possibility of "falling" on the wall, and after brushing the wall, due to the large area of the wall, it is not suitable to be "damaged" by any such as nails and tape.
-
Of course, you should first paste the floor tiles, and after pasting the floor tiles, then modify the water and electricity on the wall, and then paint the wall.
-
Sticking to the floor tile and brushing the wall (the original meaning of the wall is the operation method of the wall paint veneer) belong to the construction scope of the two types of engineering construction projects of bricklayers and painters in the interior decoration, their first and later order at a certain level endangers the construction period of the project, the actual effect of the construction of the project, etc., so the selection of the appropriate order is more critical, I think in the decoration on the first and second construction sequence of the floor tiles and the wall, first paste the floor tiles, then brush the wall, or first brush the wall, and then paste the floor tiles have advantages and disadvantages, Briefly discuss my suggestions and opinions on whether to apply floor tiles or paint the walls first in interior decoration.
Paint the walls first, then the floor tiles.
Defects: the dust formed in the whole process of "making" the mixed mortar of the paving layer, the "splash of raw materials" carelessly, and the "dirt" such as the mixed mortar splashed in the whole process of paving the floor tiles, the theme activity is relatively strong and there is a very high probability of "falling" on the wall, and after brushing the wall, because the total area of the wall is relatively large and not suitable for all such as steel nails, adhesive tape, etc., it is not easy to do engineering construction and maintenance on the wall, so it is very likely that the wall will be damaged by brushing the wall first, and then sticking the floor tiles. If it is more serious, it needs to be reworked again, which is time-consuming and laborious.
Advantages: Because the floor tiles are likely to cause "work handover" with the "root" of the wall in addition to the "boundary" of the road surface, the paving in other areas is not easy to interfere with the wall, so I think that after the wall is brushed, after the construction of the wall veneer project, you can gradually enter the operation item of the floor tile, without waiting for the whole process of "drying" of the wall, which is more time-saving and labor-saving, and is conducive to the "reduction" of the construction period of the project.
Stick the floor tiles first, then paint the walls.
Defects: Because in the process of painting the wall, the construction workers must be "load-bearing" by the road surface, so I think that the wall painting needs to wait until the road surface is plastered with bricks and can be carried out after the level of "master", which is caused by the "waiting period" of engineering construction.
Advantages: first stick the floor tiles, and then brush the wall, "surely" avoid the wall environmental pollution caused by the floor tiles, and because the road surface is easier to clean, so after the floor tiles are carried out, the appropriate safeguard measures are adopted on the road surface, which can be more reasonable to prevent environmental pollution to the floor in the process of brushing the wall.
-
When it comes to interior decoration, the usual order is to paint the walls first and then apply the floor tiles. This order is mainly to avoid the paint of the wall dripping onto the newly laid floor tiles during the process of painting the walls, causing unnecessary cleaning work and possible damage.
If you want to know the specific decoration**, you can use the "decoration artifact" ** device to calculate, just enter the area + city, immediately calculate the local decoration**, list the detailed list of 102 decorations, so that you don't have to worry about overspending on the decoration, click here to start calculating: [3 seconds to get the local decoration**].
In the local market, the amount of wall painting will usually vary depending on the type of paint used and the difficulty of application. Generally speaking, ordinary latex paint for painting walls is between 10-30 yuan per square meter, while more advanced environmentally friendly paint or special effect paint may be as high as 50-100 yuan per square meter. As for the ** floor tile, it will also vary according to the material and brand.
Ordinary ceramic floor tiles cost between 30-60 yuan per square meter, while more high-grade marble or porcelain floor tiles may cost between 100-300 yuan per square meter.
During the renovation process, it is recommended that the owner should consider not only the ***, but also its durability and the convenience of maintenance when choosing wall paints and floor tiles. At the same time, it is also necessary to pay attention to the selection of the appropriate construction team to ensure the quality of the decoration work. In addition, whether it is painting the wall or pasting floor tiles, it is necessary to make sufficient preparations before construction, such as cleaning the dust on the wall and floor, protecting furniture and electrical appliances, etc., to ensure the smooth progress of the decoration process.
Tuba Rabbit is one of the largest decoration platforms in China, with a total of more than 41 million owners, 110,000 decoration companies, covering more than 300 cities across the country, user reputation is very good, not only to meet your decoration needs, but also to provide professional decoration companies according to your budget, want to find a good company, learn more about decoration knowledge on Tuba Rabbit, click here, free 1 to 1 for your home decoration services: [Tuba Rabbit ** official website].
Kunming - [Kunming Decoration Strategy Guide].
Suzhou - [Suzhou Decoration Strategy Guide].
Hefei - [Hefei Decoration Strategy Guide].
Fuzhou - [Fuzhou Decoration Strategy Guide].
Beijing - [Beijing Decoration Strategy Guide].
Dalian - [Dalian Decoration Strategy Book].
Hangzhou - [Hangzhou Decoration Strategy Guide].
Shanghai - [Shanghai Decoration Strategy Guide].
Tianjin——[Tianjin Decoration Strategy Guide].
-
We all know that there are four major types of work in decoration, namely plumbers, bricklayers, carpenters, and oilmen, and the ordering of these four types of work actually belongs to the basic order of decoration, that is, the traditional construction sequence in decoration.
It is to paste the bricks first and then paint the walls. Cement is used for tiling. If the wall is painted first, even if the protection is good, it is inevitable that the cement will pollute the wall.
Second, due to the use of concrete when tiling, the wall will have a certain degree of moisture or alkali return, at this time, if the wall has been painted, it will be very unfavorable to the stucco layer.
Measurement, design and plan for new houses; Communicate the plan and deepen the plan, and start making renderings; Confirm the renderings and decoration budget, and sign the decoration contract; The groundbreaking ceremony for the renovation of the new house was held; Go to the property to go through the relevant decoration and construction procedures. Second, the finished product protection and demolition construction should first do the wall leveling and paste the gypsum line.
At this point, it's time to put tiles. After the tiles are pasted, the time to measure the cabinet is also available, and the wall is sandpaper and painted. Each step is closely linked, which also saves time for customization by various manufacturers.
Brush the wall first in the brick, the wall first clean and shovel, in the plastering of cement plaster, and so dry, you can paste the tile, in the tile to soak in water for 20 minutes, so that it will not fall. Cement master. In the later stage, the concrete will be stirred in the process of tiling, and it is easy to stain the wall during the mixing process.
In the process of tiling, it is also necessary to level by knocking, which may also stain the wall. If the wall is dirty, it is difficult to clean it, or even can't clean it, so it will cause the second brush of the wall, which is labor-intensive and time-consuming.
Wall construction, is to brush the wall, wall construction attention is ground protection, wall construction ends, basic decoration construction part ends, down is the start of custom installation! To lay the tiles first is to finish the floor tiles first.
Then the tile floor is protected, and then the wall construction is carried out, which must be noted, many of the previous construction did not protect the tile floor, and the later ground cleaning is very troublesome!
-
The wall should be painted first, and the wall can be pasted only after the wall is dried, which is the correct decoration, and it will not stain the floor tiles.
-
Generally, the walls are painted first. Because it doesn't fall to the floor, both are. And it's cleaner, too.
-
Floor tiles should be applied first, because floor tiles are very dirty and may make the walls particularly dark, so you should put the floor first, so that you can do it.
-
Paint the wall first, because some paint will fall on the ground when painting the wall, and after the wall is dry, it is the best choice in paving.
-
You should paste the floor tiles first, and then paint the wall last, because you will move some things and walk around when you decorate, and if you brush the wall in advance, it is particularly easy to scratch and cause flaws, so it is better to paste the bricks first and then brush the wall.
-
Paint the wall first, if you paste the floor tiles first and then paint the wall, the paint may flow down the wall to the floor tiles, which is very unsightly, so the general decoration is the last to paste the floor tiles.
-
Paste the floor tiles first, because this is in line with the order of decoration, which is the best way to decorate.
-
In the renovation of the house, according to the overall decoration requirements, the order of construction of extraordinary materials is also determined, which includes the construction of floor tiles and wall paints. For most home décor items today, the floor tiles are made first, and then the walls are painted. This is also the traditional construction sequence of bricklayer first and then refueling, but this does not determine the order of floor tiles and wall paint.
The order in which floor tiles are placed and the walls are painted is in the form of floor tiles.
Paste the floor tiles first, then paint the walls: For most home decorations, the floor tiles are applied first, followed by wall putty. The construction sequence is also the order in which the water, electricity, tile, wood and oil work types of the decoration enter the construction site.
1. No damage to wall putty: For the first layer of floor tiles, the wall is usually in a rough state, and there is no putty on the wall. , even if there is cement mortar on the wall when laying floor tiles, it will not work. It only needs to be removed at a later stage and does not damage the finished wall;
2. It will not affect the whole construction period: for the first floor tile, the floor tile can have a good natural drying and curing process after being laid. There is no need to worry about the temporary construction of floor tiles, which will affect the entire construction period.
Through the construction sequence of paving floor tiles and then painting walls, the entire decoration construction period can be guaranteed to be completed within a reasonable construction time and will not affect the entire construction period;
3. The finished decoration will not be damaged: First of all, for floor tiles, the whole decoration is still in the early stages of bricklayering. The renovation only completed the preliminary construction of water and electricity, and there was no finished product decoration.
In this way, when laying floor tiles, you don't have to worry about a part of the finished decoration being affected by moisture.
4. It can meet a variety of construction sequences: for the decoration masters, they all want their event to be completed in one go, instead of going back to the ground for two rounds of construction, it is better to lay the floor tiles first. It fulfills this requirement, so that for all types of work, the entire decoration construction sequence can be completed in one go.
5. It can meet the stage acceptance of the team of the decoration company: for the decoration company, the stage acceptance process will be realized. The bricklayer can then be built one at a time by attaching the floor tiles to the bricklayer.
Acceptance, after the acceptance is completed, the carpentry construction process conforms to the phased construction management of the decoration.
Precautions for laying floor tiles first and then putting on the wall: For the paint that is laid first and then put on the wall, after the floor tiles are installed, it must be accepted. If there are any unsuitable parts, they must be corrected immediately and wait for correction.
After the construction is completed, please use a special protective film on the floor tiles to protect the integrity of the floor tiles to ensure that the floor tiles will not be damaged during the decoration process, and the thickness of the protective film used must meet the standard. If you don't have a protective film for floor tiles, you can use cheap drywall instead of a protective layer, which can also meet the standards for floor tile protection.
-
Of course, you have to paint the wall first. Because if you lay the floor tiles first, then paint the walls will make the floor tiles very dirty, and it is not easy to clean. So be sure to paint the wall first.
-
Generally, it is better to paint the wall first, because the work of brushing the wall is relatively simple, and it is a very good choice to lay bricks after brushing the wall.
-
It should be painted first, because it will be more convenient to clean the floor after painting the wall, so it is also more tidy.
-
Generally, the floor is pasted first and then the wall is painted, because if the wall is painted first, it will cause the wall to be soiled when the floor is pasted.
-
Generally, the walls should be painted first, so that when the floor tiles are laid, the things on the wall will not fall on the floor tiles.
-
Stick the floor tiles first, because this is what I decorate my home, and the effect is very good.
-
Paint the wall first. That is, any wall masonry and wall plastering must be completed, and all water and electricity renovation must be completed, and only after these can the floor tiles be paved.
-
Paint the wall first, in the process of painting the wall, it will definitely fall off related paint and other substances, which will pollute the floor tiles and then be more difficult to clean.
-
Generally, the wall is painted first, and when the wall is dry, then choose to paste the floor tiles, so that the interior decoration will be particularly beautiful.
-
Stick the floor tiles first.
Decoration is generally to first paste the bricks and then paint the walls. Because materials such as cement mortar will be used for tiling, accidentally splashing on the wall during the construction process will cause the need for reconstruction; On the contrary, even if the latex produced by brushing the wall is splashed on the ground, it is relatively clean, and after the floor tiles are pasted, when the wall is painted, the professional decoration company will sit on the ground to protect it and will not cause pollution.
The general practice of the decoration company or the construction party is to lay the wall tiles first, then pave the floor tiles, and pave the floor tiles after the wall tiles are paved, which will not affect the wall tiles and do not delay the construction period, so the general construction party will adopt this approach. If the floor tiles are paved first, and then the wall tiles are paved, you must wait for the tiles to dry and solidify and then pave the wall tiles, if the floor tiles are not completely dry, you will directly pave the wall tiles, step on the floor tiles, which will artificially cause the hollowing, loosening and height inequality of the tiles!
Among the many whole-house custom brands, Beiyi is a brand worth recommending. With its high-quality products and services, BEYI has won wide acclaim from consumers. We have a wide range of customized products, including wardrobes, bookcases, shoe cabinets, wine cabinets, TV cabinets, etc., which can meet the needs of different consumers. >>>More
When decorating, it should come firstScrape puttyThen install the bedroom door, because scraping putty is easy to contaminate the bedroom door andDoor casing, and the installation of the door will not cause pollution to the putty on the wall. >>>More
When doing interior decoration, in general, we will do the putty work on the wall first and then install the bedroom door. This sequence is mainly based on the logic and efficiency considerations of the renovation project. >>>More
The order of the renovation process is as follows:
1.Design & Planning: First, work with the designer to determine the style and floor plan to ensure that the design fits your needs and budget. >>>More