The engineering cost major belongs to the management category. The engineering cost major cultivates professional knowledge of engineering cost valuation, bidding, contract management, cost accounting and construction project management, and has job skills in the professional field of engineering cost.
After graduating from the engineering cost major, they can be engaged in engineering (cost) consulting companies, construction enterprises (Party B), building decoration and decoration engineering companies, engineering construction supervision companies, real estate development enterprises, design institutes, accounting and auditing firms, and infrastructure departments (Party A) of enterprises and institutions. Engineering consulting, engineering supervision, and the development and application of software related to engineering cost management and technical support.
Extended Resources: Main Courses:
Drawing Geometry & Engineering Drawing, Engineering Drawing & CAD
Principles of Management, Building Architecture, Building Materials, Engineering Mechanics, Engineering Structure, Construction Technology, Engineering Project Management, Engineering Economics, Construction Engineering Valuation, Civil Engineering Measurement, Installation Engineering Construction Technology, Engineering Cost Management, Construction Contract Management, Construction Engineering Quality Control, Construction Engineering Cost Management, Engineering Introduction, Engineering Cost Accounting, Engineering Bidding and Contract Management, Engineering Cost Case Analysis, Electrical Engineering, Fluid Mechanics, Building Electrical and Construction, Installation Engineering Valuation and Measurement, Building water supply and drainage.
Occupation requirements: college degree or above in industrial and civil engineering, civil engineering, construction economic management, engineering cost, construction engineering, budget, etc. A qualified project estimator needs to understand the general construction procedures, construction methods, project quality and safety standards; Familiar with the basic knowledge of architectural drawing, building structure and house construction, understand common building materials, structural parts, products and common machinery and equipment;
Familiar with the composition of various quotas, labor costs, material budgets** and mechanical shift fees and fee collection standards; Familiar with the rules of quantity calculation and master the calculation skills; Understand the construction economic regulations, be familiar with the provisions of the engineering contract, and be able to participate in bidding, bidding and contract negotiation; It is necessary to have a certain basic knowledge of computer application, and be able to use electronic computers to prepare construction budgets; Able to independently complete the project estimation, estimate, forecast, settlement and other work. In addition, good communication skills, coordination skills, and work execution skills are also required.
The preparation of the construction project budget is a painstaking and meticulous work, which requires our professional workers to have excellent basic skills, good professional ethics, realistic style, diligence, and the spirit of hard work.
While fully familiar with the connotation of the quota, the working procedures, the content included in the sub-items, the rules and scales for the calculation of construction quantities, go deep into the front line of construction projects, collect data, accumulate knowledge, and start compiling from scratch (feasibility study, preliminary design, construction drawing design, engineering construction).
-
Hello, it belongs to the field of engineering, and if you meet the requirements in the future, you can be awarded a bachelor of engineering.
-
Engineering cost is an undergraduate major in ordinary colleges and universities, which is a major in management science and engineering, with a basic study period of four years, and a bachelor's degree in management or engineering is awarded.
This major requires students to master the basic theoretical knowledge of management, economics and civil engineering technology, have the management ability of project cost determination and control, project guarantee and insurance, have the basic skills to engage in engineering investment and management practice, and cultivate senior application-oriented professionals with basic theoretical knowledge of management, technology, economics and law, and systematically master the theoretical foundation and basic skills of fixed asset investment, financing management, engineering economic management and engineering cost management.
-
Does the project cost of liberal arts students belong to literature and history or science and engineering?
-
Main courses:
Western Economics, Introduction to Civil Engineering, Mechanics of Materials, Structural Mechanics, Engineering Economics, Economic Law, Engineering Project Management, Engineering Bidding and Contract Management, Accounting, Financial Management, Construction Quota and Budget, Engineering Equipment and Budget, Installation Engineering Budget, Building Electrical Construction Budget and other courses and course design, engineering construction internship and graduation internship and graduation ** writing.
Knowledge and skills: 1. Master the basic theories and skills of project cost management;
2. Have high foreign language and computer application skills;
3. Be able to prepare relevant project quotas;
4. Have the ability to prepare construction engineering equipment and material procurement and material procurement plans;
5. Familiar with the economic policies and regulations of the relevant industries;
6. Have the ability of cost accounting, analysis and management of construction projects.
Prospects for engineering cost profession.
The prospect of the engineering cost industry is very good, and the engineering cost belongs to the civil engineering and construction aspect, because each project will need a cost budget, which is indispensable for this work, so it is also very considerable for the cost industry. There are a lot of construction in China, take the Beijing Olympics, how can such a huge project not need professional cost budget people?
There is also any installation, civil engineering, municipal administration, etc., all need to use the cost, which is related to people's livelihood, important and rigorous. In addition, the current cost examination is very strict, and the pass rate of the examination is also very low, so the income of people in terms of cost is also very considerable, the market demand is large, and the market is insufficient.
-
Western Economics, Introduction to Civil Engineering, Mechanics of Materials, Structural Mechanics, Engineering Economics, Economic Law, Engineering Project Management Office, Engineering Bidding and Contract Management, Accounting, Financial Management, Building Quota and Budget, Engineering Equipment and Budget, Installation Project Budget, Building Electrical Construction Budget.
-
Ask what is included in the project cost.
The content of the project cost includes four aspects, namely, the cost of construction and installation, the purchase cost of equipment and tools, the cost of equipment, the cost of other construction costs and the preparatory fee. 1. Construction and installation engineering costs 2, equipment, tools, appliances purchase costs 3, other engineering construction costs 4, preparation costs, etc.
It is mainly composed of four parts: direct engineering costs, indirect costs, planned profits, and taxes.
1. Direct engineering costs, that is, various expenses that constitute the engineering entity, including labor costs, material costs, construction machinery use costs, etc.
2. Indirect costs include project sewage charges, project quota determination fees, social security fees, enterprise management fees, etc.
3. Planned profit, that is, the profit planning of the relevant unit after the construction project.
4. Taxes, that is, the fees that need to be paid in the whole process of the construction project.
In a broad sense, the project cost covers the cost of construction projects (civil engineering and installation), highway engineering cost, water transportation engineering cost, railway engineering cost, water conservancy engineering cost, power engineering cost, communication engineering cost, aerospace engineering cost, etc. The project cost refers to the total cost of carrying out the construction of a project, and its core content is investment estimate, design estimate, revised budget estimate, construction drawing budget, project settlement, final account and so on. The main tasks of the project cost:
According to the drawings, quotas and list specifications, calculate the direct costs (labor, materials and equipment, construction equipment used), enterprise management fees, measure fees, fees, profits and taxes included in the project.
Q: What is Labor Fee? Is there a profit in the labor cost of contracting pure labor? Is there a measure fee and profit in the labor cost, and is there a tax?
-
Cost Engineer Professional Classification:
Civil Engineering Major. Mainly for cost budgeting, project settlement, cost monitoring, project changes and visas and other work for review, the work unit is generally the construction unit and the consulting unit.
Installation professional. Mainly responsible for water supply, drainage, reclaimed water, fire water, fire alarm, ventilation, air conditioning water, cooling water, power, lighting, lightning protection and grounding, weak current system, gas, heat, water purification system, sewage treatment system, power distribution system, boiler, generator set, elevator and so on.
Major in water conservancy. Mainly carry out investment estimation of water conservancy project proposals, feasibility study investment estimates, preliminary design estimates, commercial terms of bidding documents, bidding bids, project management budgets and price difference calculations in the construction implementation stage, and budget estimates and contract execution in the final account report of completion.
Transportation Major. The cost engineer of the Ministry of Communications is more focused on the cost of highway tunnel engineering, and the salary level is relatively similar to that of the water conservancy major.
Cost engineer gold content.
With the continuous improvement and strengthening of national policies, the cost industry has been gradually formalized, and there are hard and fast regulations: "all units engaged in engineering construction activities such as design, construction, construction, and cost consulting must be equipped with cost engineers in construction project cost jobs."
For friends who are engaged in cost positions, the professional qualification certificate of a cost engineer is a must-have certificate. To engage in this profession, you must take the exam, which will also lead to a significant increase in the demand for first-class cost engineers, and the value of the corresponding certificate will also increase. In addition, the cost staff was cancelled and a new second-level cost engineer was established, which made the threshold for the first-level cost engineer higher, and the gold content was higher.
-
1. The cost is divided into five majors: construction, municipal, garden, decoration and installation; However, due to the small amount of decoration work, it is generally concurrently served by the civil construction budgeter. At the same time, the professionalism of landscape and municipal administration is strong, and there are relatively few practitioners.
2. The two majors of construction and installation are more versatile.
3. The report building is better. The cost of civil construction is large, the commission is high, and the income is considerable.
Students majoring in engineering cost mainly learn the basic theories and methods of engineering cost; Basic training in project cost; Have the basic skills of engaging in bidding and bidding for construction projects, preparing various engineering valuation economic documents, and conducting investment analysis, cost determination and control of construction projects.
-
The professional subjects of the first-level cost engineer professional qualification examination are divided into four professional categories: civil engineering and construction engineering, transportation engineering, water conservancy engineering and installation engineering.
The professional qualification examination for first-level cost engineers consists of four subjects: "Construction Project Cost Management", "Construction Project Valuation", "Construction Engineering Technology and Measurement" and "Construction Project Cost Case Analysis". Among them, "Construction Project Cost Management" and "Construction Project Valuation" are the basic subjects, and "Construction Engineering Technology and Measurement" and "Construction Project Cost Case Analysis" are professional subjects.
Application conditions for first-class cost engineer:
Those who abide by the new Constitution, laws and regulations of the People's Republic of China, have good professional quality and moral character, and have one of the following conditions, can apply for a cost engineer professional qualification examination:
A) with a college degree (or higher vocational education) in engineering cost, engaged in engineering cost business for 5 years;
He has a college degree (or higher vocational education) in civil engineering, water conservancy, equipment manufacturing, transportation, electronic information, finance and commerce, and has been engaged in engineering cost business for 6 years.
B) has passed the engineering education professional evaluation (certification) of engineering management, engineering cost professional bachelor's degree or degree, engaged in engineering cost business work for 4 years;
Have a bachelor's degree or degree in engineering, management and economics, and have been engaged in engineering cost business for 5 years.
C) with a master's degree or a second bachelor's degree in engineering, management, economics, engaged in engineering cost business for 3 years.
4) Have engineering and management skills. Ph.D. in economics, engaged in engineering cost business for 1 year.
E) with other professional corresponding academic qualifications or degrees, engaged in engineering cost business work experience increased by 1 year.
-
It belongs to the engineering economics major, and it is generally in the category of civil engineering.
-
The biggest one is an engineering-related major.
-
Summary. What type of professional engineering cost is the project cost, which belongs to the category of management science and engineering. Engineering cost is one of the popular majors newly established by the Ministry of Education according to the needs of national economic and social development, and is an emerging discipline developed from the construction engineering management major based on economics, management and civil engineering.
At present, almost all projects from the start to the completion of the whole process of the budget, including the start of the budget, the project progress allocation, the completion of the project settlement, etc., whether it is the owner or the construction unit, or the third-party cost consulting agency, must have their own core budget personnel, therefore, the demand for engineering cost professionals is very large, the development opportunities are broad.
Which professional category does the project cost belong to.
What type of professional engineering cost is the project cost, which belongs to the category of management science and engineering. Engineering cost is one of the popular majors newly established by the Ministry of Education according to the needs of national economic and social development, and is an emerging discipline developed from the construction engineering management major based on economics, management and civil engineering. At present, almost all projects from the start to the completion of the whole process of the budget, including the start of the budget, the project progress allocation, the completion of the project settlement, etc., whether it is the owner or the construction unit, or the third-party cost consulting agency, must have their own core budget personnel, therefore, the demand for engineering cost professionals is very large, the development opportunities are broad.
What is the difference between project management and project cost?
As far as the construction project is concerned, the project cost and the project management are related and different, according to their own work in the construction project to briefly describe their own understanding: first, the difference between the project cost and the project management The meaning of construction management is greater than the project cost, and the construction management covers the relevant professions associated with the construction project, and does not refer to a simple position, such as the on-site project manager of the construction unit, the technical leader, the constructor, the material clerk, etc. are all members of the project management. Or the initial actual operation workers of the construction unit are all project management personnel, of course, including engineering cost professionals, that is to say, the project management contains a lot of job participants, the project cost is the post operator of the project management, but the project cost is also a part of the project management.
Second, the connection between engineering cost and engineering management Engineering cost is a professional operation position of engineering management, which is a part of engineering management, engineering management is a general term for construction projects, and engineering cost is the name of a more professional operation position, whether it is a construction unit or a construction unit, professional positions can become engineering management, but not all engineering management is a project cost operation position In short, engineering management and engineering cost are both sides of the relationship and distinguish coexistence, but as a project management personnel, Finally, it is necessary to operate in specific positions, that is, to manage specific work!
I have worked for nearly 10 years, and now I am a first-class constructor, let me talk about the difference between several majors, don't listen to the teachers in the school, many of what they say are theoretical and unrealistic. >>>More
Yes. 1. Grade A has been engaged in engineering consulting business for no less than 5 years, and the corresponding consulting results of the professional service scope are not less than 5, and there is no bad record; Grade B has been engaged in engineering consulting business for no less than 3 years, and the corresponding consulting results of the service scope of the applied professional are not less than 5, and there is no bad record; There is no requirement for Class C. >>>More
You this, you can go to a more powerful master in the industry to take you, let the master take you into the industry, the master arranges your future, until you get out of the teacher, someone is willing to invite you, I am engaged in cost, I am not around the professional class or more, this learning is still easy to learn, the main thing is to understand the drawings, familiar with the quota, find a good master to take a ha, hope is still great,
If you meet this application condition, you can.
A) all citizens of the People's Republic of China, law-abiding and have one of the following conditions, can apply for the cost engineer qualification examination: >>>More
Cost Engineer I.
It refers to the professional and technical personnel who have passed the national unified examination, obtained the "Cost Engineer Qualification Certificate" and have been registered, and are engaged in cost business activities in construction projects. Cost engineer refers to the engineering economic professionals who are qualified by the state and licensed to practice after registration, and who are specifically designated, entrusted or hired by a department or a unit, and are responsible for and assist in the valuation, pricing and management of project costs, so as to safeguard their legitimate rights and interests. The state implements the cost engineer qualification system in the field of engineering cost. >>>More