Can illegal buildings be demolished, and can illegal buildings be demolished

Updated on society 2024-07-29
11 answers
  1. Anonymous users2024-02-13

    Illegal buildings can be forcibly demolished. In the event of a new construction, addition, alteration or construction in violation of the building regulations, the personnel shall immediately report to the competent construction authority for handling, and carry out the matters designated by the competent construction authority. Personnel who investigate and report illegal buildings and demolish them shall wear identification cards issued by municipalities directly under the Central Government and counties (cities)** when performing their duties; Demolition personnel should also carry demolition documents.

    The competent construction authorities of municipalities directly under the Central Government and counties (cities) shall carry out surveys within five days from the date of receipt of the report of the personnel who have reported the illegal buildings, and if it is determined that it must be demolished, it shall be demolished immediately. If it is determined that the demolition requirements have not been constituted, the offender shall be notified to apply for a license in accordance with Article 30 of the Construction Law within 30 days after receiving the notice. If the application for the license of the illegal builder does not comply with the regulations or fails to apply for the license within the time limit, the competent building authority of the municipality directly under the Central Government or county (city) shall demolish it.

    Legal basis] Article 22 of the Regulations on the Administration of Urban Housing Demolition.

    No compensation shall be given for the demolition of illegal buildings and temporary structures that exceed the approved period; Appropriate compensation shall be given for the demolition of temporary structures that have not exceeded the approved time limit. The illegal builder has a legal property right to the materials used in the illegal construction.

    If you still have questions about this issue, it is recommended that you organize the relevant information and communicate with a professional in detail.

  2. Anonymous users2024-02-12

    Buildings that have not been approved are illegal buildings and should need to be demolished.

  3. Anonymous users2024-02-11

    Illegal construction can be strong. The details are as follows:

    1. If a house is built without a land use certificate and construction application procedures, it is an illegal building, and if the local relevant departments have issued demolition notices for many times and have not demolished themselves, the local administrative law enforcement department shall carry out compulsory demolition;

    2. Where it is necessary to compulsorily demolish illegal buildings, structures, facilities, etc., the administrative organ shall make a public announcement and the parties concerned shall demolish them within a time limit. Where a party does not apply for administrative reconsideration or initiate an administrative lawsuit within the statutory time limit, and does not demolish it, the administrative organ may compel the demolition in accordance with law. In other words, only after reconsideration and litigation will the person being demolished lose the lawsuit will face the forced demolition.

    3. After the competent department of urban and rural planning makes a decision to order the construction to be stopped or demolished within a time limit, if the parties do not stop the construction or do not demolish it within the time limit, the local people at or above the county level where the construction project is located may instruct the relevant departments to take measures such as sealing the construction site and compulsory demolition.

    Legal basisArticle 68 of the Urban and Rural Planning Law of the People's Republic of China.

    After the competent department of urban and rural planning makes a decision to order the construction to be stopped or demolished within a time limit, if the party does not stop the construction or does not demolish it within the time limit, the local people at or above the county level where the construction project is located may instruct the relevant departments to take measures such as sealing the construction site and compulsory demolition.

  4. Anonymous users2024-02-10

    According to the provisions of the relevant laws of the country, the illegal building can be demolished, but the demolition of the illegal building must go through the statutory procedures of the mausoleum, such as the issuance of the illegal building certificate, the issuance of demolition notice, etc.

    Legal procedures for forced demolition of illegal buildings: (1) Investigation and inquiry, on-site inspection. The people of the township and town where the illegal building is located shall organize relevant departments and personnel to conduct investigation and inquiry, on-site inspection (records, surveying and mapping, relevant approval materials, other evidence of illegal occupation of land, etc.) to confirm whether it is illegal or violated.

    2) Order to cease the illegal act. After the illegal building is confirmed, the people of the township and town where the illegal building is located shall order the illegal act to be stopped, make an announcement, and repent of the party concerned to demolish it within a time limit.

    3) The District Planning and Construction Bureau shall make an administrative penalty decision. According to Article 64 of the Urban and Rural Planning Law of the People's Republic of China, "if the construction project planning permit has not been obtained or the construction is not carried out in accordance with the provisions of the construction project planning permit, the local people's ** urban and rural planning department at or above the county level shall order the construction to be stopped; If corrective measures can still be taken to eliminate the impact on the implementation of the plan, the correction shall be made within a time limit, and a fine of not less than 5% but not more than 10% of the construction project cost shall be imposed; If it is not possible to take corrective measures to eliminate the impact, it shall be demolished within a time limit, and if it cannot be demolished, the physical object or illegal income shall be confiscated, and a fine of less than 10% of the construction project cost may be imposed concurrently." The people of the township and town where the illegal building is located shall report the relevant reasons for the illegal building to the District Construction Bureau, and the District Construction Bureau shall make an administrative penalty decision if it meets the administrative penalty after review.

    Legal basisArticle 64 of the Urban and Rural Planning Law of the People's Republic of China has not obtained a construction project planning permit or has not been constructed in accordance with the provisions of the construction project planning permit, the local people's ** urban and rural planning department at or above the county level shall order the construction to be stopped; If corrective measures can still be taken to eliminate the impact on the implementation of the plan, the correction shall be made within a time limit, and a fine of not less than 5% but not more than 10% of the construction project cost shall be imposed; If it is not possible to take corrective measures to eliminate the impact, it shall be demolished within a time limit, and if it cannot be demolished, the physical object or illegal income shall be confiscated, and a fine of less than 10% of the construction project cost may be imposed.

    Article 65 Where a rural construction planning permit has not been obtained in accordance with the law in a township or village planning area or construction is not carried out in accordance with the provisions of the rural construction planning permit, the township or township people shall order the construction to be stopped and corrected within a time limit; If it is not corrected within the time limit, it may be dismantled.

  5. Anonymous users2024-02-09

    Yes, but you have to go through the relevant process.

  6. Anonymous users2024-02-08

    Legal Analysis: Illegal buildings can be forcibly demolished. In the event of a new construction, addition, alteration or construction in violation of the building regulations, the personnel shall immediately report to the competent construction authority for handling, and carry out the matters designated by the competent construction authority.

    Legal basis: "Urban and Rural Planning Law of the People's Republic of China" Article 45 The competent departments of urban and rural planning of local people's governments at or above the county level shall verify whether the construction project meets the planning conditions in accordance with the provisions of the People's Republic of China. Without verification or verification does not meet the planning conditions, the construction unit shall not organize the completion acceptance.

  7. Anonymous users2024-02-07

    Illegal buildings can be forcibly demolished. Because illegal construction is a private illegal construction, it is not protected by law without the necessary permits and approvals. If it is determined that the demolition requirements have not been constituted, the offender shall be notified to apply for a license in accordance with Article 30 of the Construction Law within 30 days after receiving the notice.

    Legal basisIn accordance with Article 5 of the Measures for the Handling of Illegal Buildings, the competent construction authorities of municipalities and counties directly under the Central Government shall carry out an investigation within five days from the date of receipt of the report of the illegal building inspectors, and if it is determined that it must be demolished, it shall be demolished immediately. If it is determined that the demolition requirements have not been constituted, the offender shall be notified to apply for a license in accordance with Article 30 of the Construction Law within 30 days after receiving the notice.

  8. Anonymous users2024-02-06

    Hello, generally speaking, it is okay if it is carried out in accordance with legal procedures, but it cannot be dismantled directly, otherwise it is illegal.

  9. Anonymous users2024-02-05

    Compensation is generally not required for the demolition of illegal buildings, and whether compensation can be made depends on whether the building is legal and whether it has exceeded the approval period. Compensation shall be given to those identified as legal buildings and temporary structures that have not exceeded the approved period; No compensation shall be given to those that are found to be illegal constructions that call hail and temporary structures that exceed the approved time limit.

    Legal basis

    Article 24 of the Regulations on the Expropriation and Compensation of Houses on State-owned Land The people at the municipal and county levels and their relevant departments shall strengthen the supervision and management of construction activities in accordance with the law, and deal with the construction in violation of urban and rural planning in accordance with the law. Before the municipal and county-level people's governments make a decision on housing expropriation, they shall organize relevant departments to investigate, identify and deal with unregistered buildings within the scope of expropriation in accordance with the law. Compensation shall be given to those who are determined to be legal buildings and temporary structures that have not exceeded the approval period; No compensation shall be given to those identified as illegal constructions and temporary constructions that exceed the approved period.

  10. Anonymous users2024-02-04

    Yes, illegal buildings can be demolished. Illegal buildings are illegal no matter how long they are built, so when the illegal building inspection personnel encounter new construction, addition, reconstruction, and construction in violation of the building regulations, they should immediately report to the competent building authority for processing, and the illegal building inspection and demolition personnel should wear the identification card issued by the municipality and county when performing their duties, and the demolition personnel should carry the demolition documents.

  11. Anonymous users2024-02-03

    Yes, illegal buildings are buildings that violate national planning, construction, environmental protection and other laws and regulations, and are not protected by law and cannot apply for property rights certificates. Built and used, there is still a possibility of forced demolition.

Related questions
10 answers2024-07-29

First, you need to understand what a building violation is. >>>More

6 answers2024-07-29

Violation usually refers to traffic violations (formerly known as traffic violations), that is, motor vehicles, non-motor vehicle drivers or pedestrians, violations of road traffic safety regulations, traffic management and traffic conditions. In addition, a violation can also refer to a violation of the rules and regulations. >>>More

8 answers2024-07-29

At present, the only officially recognized identification method is the rural "homestead use certificate" and the urban "construction land planning permit", and the buildings within the permitted area are not illegal buildings. >>>More

9 answers2024-07-29

Basis: Article 7 of the "Provisions on Urban Construction Supervision" The basic responsibilities of the urban construction supervision team: >>>More

7 answers2024-07-29

Therefore, they cannot buy or sell, nor can they go through the procedures for transferring the ownership of the house, and they may not be able to obtain corresponding compensation at the time of demolition. >>>More