What should I do if the cement floor at home is burned and ashed?

Updated on home 2024-07-28
2 answers
  1. Anonymous users2024-02-13

    1. If the new cement floor is not very serious, you can buy concrete reinforcing agent outside for painting, and you can paint it 2-3 times, and the cost is 10 yuan square meters, which is very cheap compared to the construction team outside. 2. If the ash of the newly made cement floor is very serious, then it must be polished with special machinery, and then hardened with concrete reinforcing agent, and then polished. The cost of doing this will definitely be relatively high, because it involves a construction fee, as well as machinery, and the consumption of consumables.

    3. For the ash of the old ground, you can use the ground sand and dust treatment agent for hardening, and you can buy materials for painting on the market by yourself, but the material efficacy of each company is different. 4. If the ground ash is very serious, the concrete floor can be re-poured, and then the emery floor or concrete reinforcing agent floor, or epoxy floor.

    Yes, but the concrete reinforcing agent floor is more wear-resistant and durable than the epoxy floor, and the cost is lower.

    What is the best solution for cement floor ashing?

    Solution: If conditions or conditions permit, it is best to remove the leveled ash layer or re-layer on it. If you do not have the above conditions, you can buy a ground interface agent called "ground solid" and brush it twice, which can also effectively solidify the ground.

    How to prevent cement floor ash who knows better.

    Hello! This should be caused by the uneven treatment of the cement floor in the early stage and the insufficient surface hardness, and there will be more ash on the ground when the sand is raised. It is recommended to make a layer of self-leveling cement.

    It is flat and strong, and the surface is completely ashless, but it is a little expensive, and it generally has to be more than 20 square meters. You can also use a treatment agent, which is available on the market. **From the Internet, for reference only, I hope it can help you.

  2. Anonymous users2024-02-12

    If we want to prevent the problem of cement floor ashing, then we need to start from the source, including in road construction, we must use high-grade cement materials, and we must use cement materials that are not damp and do not agglomerate, and use high-quality and high-grade cement materials can effectively prevent the emergence of cement floor ash problems.

    Also, when proportioning aggregates, the grade of aggregates should be moderate, not too coarse and not too fine, and the content of sand can not be too much, which need to attract our attention, because any link has a problem, it may lead to a decrease in the strength of the construction ground, and the emergence of ash problems on the ground. When paving materials, we can not vibrate the materials excessively when pouring the materials, and at the same time, the calendering time should be controlled, not too early and not too late. During the maintenance period after construction, the working surface can not be exposed to the sun or rain, and it is necessary to pay attention to the time of sprinkling and maintenance.

    How to solve the problem of cement floor ash? If you encounter the problem that the cement floor has been ashed, then, we have to take the method of disease repair to deal with it, the cement floor ash repair, in fact, is to re-harden the surface layer of the ground, then it is necessary to use the repair material with high hardness and strong ductility, it is best to directly use the surface cover repair material, with this material can improve the repair effect of the ash ground, increase the strength and hardness of the ground, improve the repair quality of the disease, and prolong the service life of the road.

Related questions
6 answers2024-07-28

1. Coat concrete reinforcing agent.

This method is more suitable for the cement floor with a relatively light degree of sanding, and the problem of sand and ash on the cement floor can be solved by brushing on the cement floor with concrete reinforcing agent. >>>More

8 answers2024-07-28

Reprocess the ground using a screed.

In other words, if we plan to lay a wooden floor and the floor needs to be releveled, then we should not deal with it separately and use a new screed. The conventional method is to smear a layer of cement mortar on the ground, and the strength of the cement mortar is higher, that is to say, the cement content is larger. If the thickness is thicker, you can beat a layer of concrete, and then use a plate vibrator to level the ground. >>>More

5 answers2024-07-28

The former leveling uses ordinary cement mortar, leveling has large defects, one is that the flatness control can not achieve the greatest accuracy, and the leveling thickness is high, and the second is that the construction process is easy to increase the ground of the house due to the technical problems of the construction party. >>>More

5 answers2024-07-28

Reprocess the ground using a screed.

In other words, if we plan to lay a wooden floor and the floor needs to be releveled, then we should not deal with it separately and use a new screed. The conventional method is to smear a layer of cement mortar on the ground, and the strength of the cement mortar is higher, that is to say, the cement content is larger. If the thickness is thicker, you can beat a layer of concrete, and then use a plate vibrator to level the ground. >>>More

12 answers2024-07-28

First clean the ground, try to have no floating ash, no debris, and then apply sealing curing agent to deal with ash and sand, the flatness of the ground will not change after the material is painted, and the material penetrates into the ground to form a hardened layer, hardening and wear-resistant, sealing and dust-proof. >>>More