Q: The normal order of decoration, first floor tiles, then wall tiles, then wall tiles, then wall pa

Updated on home 2024-07-25
11 answers
  1. Anonymous users2024-02-13

    When it comes to interior renovation, the general sequence is: first the plumbing renovation, then the mason, then the carpenter, then the painter, and finally the installation of floor and wall tiles. Specifically, the water and electricity renovation is to meet the new needs of life, such as adding outlets, changing the switch position, etc.

    Masons are mainly used to level the walls and floors to facilitate subsequent decoration. Carpentry is mainly used to make doors, windows, cabinets, etc. Painters mainly paint walls and ceilings.

    Finally, floor and wall tiles are installed, as they can be damaged if other renovations are carried out after they have been installed.

    With the decoration device, you only need to enter the area + city, and calculate the most affordable local market in 3 seconds**: [Tuba Rabbit Big Platform Counts**].

    No longer worry about the company's price increase, omission and price increase.

    In the local market, the ** of hydropower renovation is generally between 30-50 yuan per square meter, the ** of masonry is between 40-60 yuan per square meter, the ** of carpentry is between 50-100 yuan per square meter, the ** of painters is between 30-50 yuan per square meter, and the installation of floor tiles and wall tiles ** is between 30-50 yuan per square meter. These ** will vary depending on the quantity and material selection.

    When carrying out renovation, it is recommended to first make a renovation plan and clarify your needs and budget. Then find a professional renovation company or worker and renovate according to their suggestions. In the decoration process, it is necessary to pay attention to supervising the work of workers to ensure the quality of decoration.

    At the same time, it is also necessary to pay attention to the progress of decoration to avoid affecting life due to the long decoration time.

  2. Anonymous users2024-02-12

    1. The order is as follows:

    1. Preliminary design.

    2. The main body is demolished and modified.

    3. Hydropower transformation.

    4. Carpentry. 5. Tiling.

    6. Paint the walls.

    7. Kitchen and bathroom ceilings.

    8. Cabinet installation.

    9. Wooden door installation.

    10. Floor installation.

    11. Paved wallpaper.

    12. Radiator installation.

    13. Switch socket installation.

    14. Fixture installation.

    15. Hardware sanitary ware installation.

    16. Curtain rod installation.

    17. Pioneer cleaning.

    18 furniture entered.

    19 appliances installed.

    20 home accessories decoration.

    First, the first step: water, electricity and heating.

    1.Water: including the location and layout of the kitchen and bathroom water pipes. According to the principle of ergonomics, the height and position of the water pipe often have to be changed greatly, for example, the water pipe access height of the toilet may not be the same as the reserved height.

    2.Electricity: Mainly consider the transformation of energized lines. Change the location and number of switches and sockets to make them more rational.

    3.Heating: Heating or underfloor heating needs to be designed in advance.

    The reason why water, electricity and heating are listed as the first step is that if the early stage is not well considered, it will incur inconvenience in construction and increase in decoration costs.

    Second, the second step: floor tiles and wall tiles.

    In the first step, after the water, electricity and heating are adjusted, the floor tiles and wall tiles need to be paved.

    3. The third step: the ceiling of the house.

    Suspended ceilings for living rooms, bedrooms, study, dining rooms, kitchens, bathrooms, and balconies.

    Fourth, the fourth step: the door and mouth.

    The decoration of doors and windows, including the production of some furniture accessories, such as entrance treatment, TV background wall production, etc., if synthetic doors and windows are selected, they will be placed at the end of the construction.

    5. Step 5: Painting the walls.

    Wall painting: You can use painting, wallpaper, wall covering, etc.

    Sixth, the sixth step: primer topcoat.

    Priming and topcoat of doorways, windows, and parts of furniture.

    7. Step 7: Lighting installation.

    Install all the lamps in the room, including all kinds of ceiling lights, downlights, chandeliers, spotlights, etc.

  3. Anonymous users2024-02-11

    Decoration of the rough room: water and electricity first, after the distribution of the pipeline, go to the kitchen room, bathroom balcony, waterproofing, paste the wall tiles of the kitchen and bathroom, and then the floor tiles of the whole house and the mortar leveling of the room (the room is paved with wooden floors) and other plastering work such as wall base, carpentry entry, on-site production and installation of furniture and modeling, ceiling and painting, ceiling wall scraping, whitewashing, latex paint, installation of customized wardrobes and other furniture, installation of wooden floors, installation of lamps, switches, sockets and sanitary ware, plumbing accessories, etc., and finally latex paint repair Professional sanitation cleaning OK!!

    However, it depends on the decoration plan and content, and then refine the construction sequence

  4. Anonymous users2024-02-10

    Here I am a plumber to install water and electricity, then a stonemason to waterproof, pave tiles, etc., then carpenter ceiling, wardrobe (or custom-made), package doors, etc., then paint and scrape porcelain, and then electrification, lighting, etc., and finally sweep the tail. If you are afraid that the floor tiles are worn out, you can spread the packaging carton of the floor tiles on the floor tiles.

  5. Anonymous users2024-02-09

    It is definitely correct to change the water and electricity first, and then do the indoor waterproof --- closed water test.

    Laying wall and floor tiles, this can be done at the same time, (the kitchen and bathroom are first pasted with wall tiles and then paved with floor tiles).

    Laying the woodworking's sawdust on the floor tiles can effectively protect the floor tiles.

  6. Anonymous users2024-02-08

    In the decoration steps, painting and brick laying are two important links, they have a sequence, painting is carried out after the brick is laid. Let me reveal it to you!

    First, let's take a look at the steps of painting. Painting is the last step in the renovation process, adding colour, beauty and sophistication to an entire room. Generally speaking, the specific steps of painting are as follows:

    1.Base treatment: Before painting, the wall should first be treated with a base layer, including filling cracks, scraping putty, sanding and other processes. The purpose of these processes is to ensure the flatness and adhesion of the wall surface, so that the painting effect is better.

    2.Protective measures: Before painting, take thorough protective measures to protect the room, such as laying waste cloth, applying adhesive tape, etc., to prevent areas other than the wall from being soiled or contaminated by paint.

    3.Primer: The role of primer is to increase the adhesion and covering power of the wall, and paint the entire wall with primer, usually using primer in the range of 10-30 yuan square meters.

    Here is a recommended decoration artifact, enter the city and area, and give the overall decoration budget according to the most affordable local market building materials and construction**: [Enter the area, 3 seconds to calculate it for free**].

    No longer have to worry about being tricked by the decoration company, raising the price at will, omitting to increase the price.

    4.Brush the topcoat: After the primer is dry, the topcoat can be applied, and the function of the topcoat is to increase the color and gloss of the wall. The choice of topcoat should be determined according to personal preference and decoration style, generally ** in 20-50 yuan square meters.

    Next, let's take a look at the steps of laying bricks. Bricking is an important part of the renovation process, adding beauty and durability to the floor. Generally speaking, the specific steps for laying bricks are as follows:

    1.Base treatment: Before laying bricks, the ground should first be treated with a base layer, including cleaning, leveling, moisture-proof, etc. Ensuring that the floor is dry, level, and free of oil and debris is essential for the quality of the tiles.

    2.Paving mortar: After the base layer is processed, the bricks are pasted on the ground using mortar. The ** of mortar depends on the brand and material, generally in 10-30 yuan square meters.

    3.Brick paving: Pave the bricks on the ground in turn according to the requirements of the design drawings, and pay attention to maintaining the consistency and flatness of the brick joints. The ** of bricks varies according to the material and brand, and the average ** is between 60-200 yuan square meters.

    4.Brick joint filling: After the bricks are paved, the brick joints are filled with a special caulk to improve the stability and aesthetics of the bricks. The ** of caulk varies according to the brand and color, generally in 10-30 yuan square meters.

    To sum up, according to the order of decoration, painting is carried out after the bricks are laid.

    Kunming - [Kunming Decoration Strategy Guide].

    Suzhou - [Suzhou Decoration Strategy Guide].

    Hefei - [Hefei Decoration Strategy Guide].

    Fuzhou - [Fuzhou Decoration Strategy Guide].

    Beijing - [Beijing Decoration Strategy Guide].

    Dalian - [Dalian Decoration Strategy Book].

    Hangzhou - [Hangzhou Decoration Strategy Guide].

    Shanghai - [Shanghai Decoration Strategy Guide].

    Tianjin——[Tianjin Decoration Strategy Guide].

  7. Anonymous users2024-02-07

    The decoration steps are in order, and painting and brick-laying should be carried out first. If you want to lay the floor tiles first, wait for a while after the floor is laid to ensure that the adhesive is dry enough and the floor tiles are firm enough. Then paint the walls to cover the ground.

    The advantage of bricklaying first is that if the shielding of the ground is in place, it can protect the wall and protect the ground from damage and pollution.

    1.If you paint the wall first, you don't have to wait until the wall is dry before laying the floor tiles, but be careful not to touch the painted wall when laying. Usually the tiles are applied first, and then painted. Because when tiling cement mortar.

    If you accidentally get it on the wall that has been painted, it is basically difficult to remove, and if you have brushed the latex paint.

    If you accidentally drop it on a brick, it will be easier to clean up. Both methods can be used in the home improvement process, but different sequences have different advantages and disadvantages. The advantage of laying tiles first and then brushing the wall is that it can better protect the wall, and if the tiling of the ground is in place, it can also protect the ground from damage and pollution.

    2.For floor tiles.

    Be sure to soak the bricks in water first, because there are many tiny gaps in the inside of the bricks, and the water absorption is strong. If there is no soaking water, it is easy to absorb the moisture in the cement mortar after laying the bricks, resulting in a gap between the bricks and the cement, resulting in hollowing.

    Abscission. In addition, we must pay attention to leveling, and first pave the ground with mortar, which can effectively reduce hollowing. If the arrangement is mainly conducive to compact construction projects.

    Tile paving is a construction project for bricklayers. Generally, the kitchen and bathroom tiles are laid first, and then the floor tiles of the living room and bedroom are laid. When laying kitchen and bathroom tiles, it does not affect the oiler to scrape gypsum putty on the wall and ground.

    and other grassroots treatments.

    3.The order of decoration is from top to bottom, from inside to outside, if the floor tiles are paved first when decorating, and the wall is brushed with a roller, the architectural paint will often fall on the floor tiles, so that the floor tiles need to be cleaned immediately after decoration, which increases the decoration cost. Painting before laying floor tiles not only prevents paint from dripping on the floor tiles, but also makes the connection between the wall and the floor more harmonious and adds to the interior aesthetics.

    The above is the answer to the question of which is the first to carry out the decoration steps, painting and brick paving.

  8. Anonymous users2024-02-06

    In the process of decoration, you should first paint and then pave the floor tiles, so that you can get a good protection, and the ground can be very clean and very neat.

  9. Anonymous users2024-02-05

    In general, the floor tiles are paved first and then painted. The main reasons are:

    1. If the arrangement is mainly conducive to the compact progress of the construction project. Tile paving is a construction project belonging to the bricklayer, generally the kitchen and bathroom tile paving is carried out first, and then the floor tile of the living room and bedroom is paved. When paving kitchen and bathroom tiles, it does not affect the oilman to carry out the base layer of the wall and ground, such as scraping gypsum putty and other base treatment, and the two can save construction time at the same time.

    If it is after the kitchen and bathroom tiles are paved, wait until the wall is painted, and then pave the floor tiles in the living room and bedroom, you need to rearrange the bricklayer often and purchase cement and sand again, so that the construction consistency of the bricklayer is poor.

    2. It is conducive to the protection of finished products. After the ground tile is paved, the ground tile adopts the finished protective film and the packing box to cover the brick surface for protection, relatively speaking, the wall painting construction is carried out on the dry solid floor tile, it will not cause much impact on the floor tile, and after the first painting, and then paving the floor tile, the difficulty of the protection of the wall will be relatively larger, one is that the material such as cement sand may cause damage to the wall when handling the cement, and the second is that the cement slurry will cause damage to the paint surface when splashing on the wall, and re-repair the paint, This is likely to cause inconsistent shades of wall paint.

  10. Anonymous users2024-02-04

    It depends on the individual situation, and in general, people will definitely go to paint first, and then go to lay floor tiles. And this is also a correct order, but it varies from person to person.

  11. Anonymous users2024-02-03

    First of all, it is necessary to lay the tiles, whether the adhesive is dry enough, whether the floor tiles are strong enough, and the floor should be paved for a while so that the walls can be painted and the ground covered. If the walls can be protected and the blocking of the ground works properly, the ground can be protected from damage and contamination. The house takes a long time to renovate.

    Because you have to wait until the floor tiles are finished and the floor becomes solid, you can start painting the walls. Paint the walls first, you don't have to wait until the walls are dry before laying the floor tiles, but be careful not to touch the painted walls when laying them. The renovation time of the house is relatively short, and the walls can be painted directly with tiles.

    If you don't pay attention, you can damage the freshly painted wall and even need to be reworked in a serious way.

    Generally speaking, everyone will paint the walls first. Not only can it shorten the decoration time, but it can also leave the floor decoration at the end, and better ensure the perfection of other decorations. At the same time, it has less impact on the ground decoration and the effect is better.

    Hydropower transformation, this is a basic project, but at this stage, we must choose the best products. Susan is the most commonly used thing in our daily lives. If the quality is too poor, it is also troublesome to replace it frequently.

    The second waterproofing project, when building a house, will often be waterproof, and some friends think that this is enough. The editor-in-chief reminded us that the renovation must be waterproof again, and the wastewater test must be 24 hours! The importance of waterproofing is self-evident, we all know, I believe that waterproofing projects can not be ignored when decorating!

    If the renovation process is stressful, it helps to carry out the project quickly. The tile array is a qigong construction project, which is generally to lay the kitchen and bathroom tiles first, and then lay the floor tiles in the living room and bedroom. When laying kitchen and bathroom tiles, it does not affect the base layout of the wall and the oiler, gypsum putty and other base treatment, both of which save construction time at the same time.

    Some owners need to lay kitchen and bathroom tiles first, wait until the walls are painted, and then lay the floor tiles in the living room and bedroom, often rearrange the qigong, and then buy cement sand. In this way, the construction correlation of the stomata is relatively poor.

    It is not that any construction sequence cannot be adjusted. Both construction projects can be adjusted on a case-by-case basis, including adjusting the schedule of construction workers, delays in the placement of floor tiles such as tiles being temporarily out of stock. The core is to deal with the protection of finished products.

    As long as the effort is made not to harm other projects that have already been constructed, it is fine. Whether the new house should be painted or tiled first, Bi Mojun believes that all owners should figure it out psychologically. Hope this sentence is helpful to you.

Related questions
26 answers2024-07-25

Of course, you should make tatami mats first, because tatami mats do not need to be laid with wooden floors, and if you make tatami mats after laying wooden floors, it will hurt the wooden floor.

6 answers2024-07-25

Amitabha. There are 84,000 ways to Dharma. Gate door first. Buddhist scriptures are three and twelve parts. Subordinate to the ministry. It depends on which sect you cultivate, and it should be in-depth. Each case focuses on different classics. The final goal is the same, and it is inseparable from the bodhi of nature.

5 answers2024-07-25

Decorating a house is a very complex project, so let's take a look at the order of decorating a house. >>>More

6 answers2024-07-25

The correct sequence of steps for children to learn art.

1.If you want to learn to draw, you need to be prepared at the beginning. We should go and buy painting tools first, and we don't need to buy expensive ones at first, just buy some practical ones. We can start by buying a pencil, a pencil, watercolor or colored pencils, and paper. >>>More

16 answers2024-07-25

When it comes to interior renovation, the usual step is to scrape putty before installing the door. This is because putty scraping is the process of leveling and beautifying the wall, and if the door is installed first, it may cause pollution or damage to the surface of the door. In addition, sanding and painting are required after scraping putty, which can cause unnecessary damage to the doors that have already been installed. >>>More