    Decorating a house is a very complex project, so let's take a look at the order of decorating a house.

    Step 1: Change water, electricity and heating, including the location and layout adjustment of kitchen and bathroom water pipes. According to the principle of ergonomics, the height and position of the water pipe often have to be changed greatly, for example, the water pipe access height of the toilet may not be the same as the reserved height.

    electricity, mainly considering the transformation of energized lines. Change the location and number of switches and sockets to make them more rational.

    warm, heated or underfloor heating. It needs to be designed in advance.

    The reason why water, electricity and heating are listed as the first step is that if the early stage is not well considered, it will lead to inconvenience in construction.

    Step 2: Floor tiles and wall tiles.

    In the first step, after the water, electricity and heating are adjusted, the floor tiles and wall tiles need to be paved.

    Step 3: House ceiling.

    Suspended ceilings for living rooms, bedrooms, study, dining rooms, kitchens, bathrooms, and balconies.

    Step 4: Wrap the door and mouth.

    The decoration of doors and windows, as well as the production of some furniture accessories, such as entrance treatment, TV background wall production, etc.

    Step 5: Painting the walls.

    Wall painting, you can use painting, wallpaper, wall covering, etc.

    Step 6: Primer topcoat.

    Priming and topcoat of doorways, windows, and parts of furniture.

    Step 7: Lighting installation.

    Install all the lamps in the room, including all kinds of ceiling lights, downlights, chandeliers, spotlights, etc.

    Step 8: Ventilation and cleaning.

    Maintain good ventilation conditions and sufficient ventilation time.

  2. Anonymous users2024-02-05

    1. Preliminary preparation. At this stage, the budget is determined, the design plan is communicated with the designer, and the house is measured on the spot. According to the area and structure of the house, lay a good foundation for the later construction and decoration.

    2. Medium-term construction. According to the preliminary preparations, continue to advance, mainly including the main body demolition, water and electricity transformation, carpentry, tiling, wall painting, kitchen and bathroom, cabinet installation, wooden door installation, floor installation, wallpaper paving, radiators, switches and sockets, lamps, hardware and sanitary ware and curtain rod installation.

    In the mid-term construction stage, in addition to the basic construction, home decoration and house construction, it also includes the design of the overall style and style of some houses. Among them, the main body demolition and hydropower transformation are only some of the most basic renovation work for the original house layout and space layout.

    The subsequent construction process of carpentry, tiling, wall painting, kitchen and bathroom construction design and other aspects includes the characteristics of home decoration house design style.

    3. Sweeping stage. This stage is mainly aimed at the decoration waste generated during the decoration process and the waste items left behind, and thoroughly clean the house to ensure that the house is neat and clean.

  3. Anonymous users2024-02-04

    The correct order of house decoration: first the overall design of the house, then the demolition and masonry of the walls, then the construction of the hydropower project, the mud phase, and the painting of the paint. Then there is the installation project, such as the installation of cabinets, floors, lamps, etc., to this step, the hard decoration is basically completed, but it still needs to be cleaned.

    When the hygiene is done, it is the combination of soft decoration, like the admission of furniture and appliances.

    The construction of the main demolition and reconstruction project involves the masonry and demolition of the wall, as well as the shoveling of the wall and the replacement of plastic steel windows. However, it is worth mentioning that the load-bearing wall can not be demolished, which is easy to cause hidden dangers in the house, and after the construction, the construction waste should be cleaned up in time to facilitate the later construction.

    Hydropower renovation, as a concealed project, once it is not constructed, it is easy to have problems in the future. Therefore, when carrying out the transformation, we must do a good job of positioning, the wiring of hydropower should be horizontal and vertical, and it is recommended that the water go to the sky and electricity to go to the wall to facilitate maintenance and inspection. And be sure to reserve the socket position of the home appliance, so that it will be more convenient to use, and the first measurement of the cabinet should be completed at this stage.

    Before laying the tiles, it is necessary to soak them, which is conducive to improving the adhesion of the tiles. In addition, the integrity of the tiles needs to be checked, the broken tiles are cut to improve the utilization rate, and the second measurement of the cabinet can be carried out at this stage.

    Precautions for home renovation

    1. Select hydropower materials.

    When choosing wires and water pipes, you must not buy cheap ones. Many people are not attentive enough to hydropower materials and only see **. And if the hydropower materials are not up to standard, the potential safety hazards will be great in future life.

    Because the wires and water pipes buried in the wall should be of good quality, because it is very expensive to repair if something goes wrong.

    2. Select the lamp.

    Although the crystal lamp looks good-looking and atmospheric, it is also corresponding, and it is difficult to take care of. Choosing a ceiling lamp is still very affordable, simple and generous, and it does not take up space. Basic Pure Rules.

    3. Floor tiles and floor drains.

    The use rate of the ground is very high, so it is necessary to pay more attention to the quality of the building materials on the ground. The choice of well-known brands in the floor drain is not too high, you can choose a good brand, to reduce the trouble of the pants balance in the future.

  4. Anonymous users2024-02-03

    Enter the area and get the decoration for free**].

    Buying a house is a major event in life, and renovating a house is a major event in the family, buying a house is to make your life more comfortable in the future. Therefore, house decoration is a problem that cannot be ignored. So, let's take you to understand the order of house decoration and what needs to be paid attention to in house decoration.

    What is the order of house decoration The house is decorated in accordance with the order of overall design, main body establishment, water and electricity establishment, carpentry tiling, wall ceiling, cabinet floor, switch socket lamps and lanterns, hardware, curtains, furniture, and household appliances. Before decorating, we must let a professional designer go to the house to check it first, so that it has a general understanding of the house type, and then communicate with your design needs and design, so as to ensure that the designed house meets your heart. House decoration precautions 1, shoe cabinet to be practical Under normal circumstances, when everyone chooses a shoe cabinet, they will prefer to choose the beautiful outsourcing, and ignore its practicality.

    In fact, the most important thing about the shoe cabinet is its practicality, so it is best to choose a space at the bottom, so that it is convenient to put shoes that are often worn, and there is a way to save the empty space. 2. There must be more reserved sockets When the house is renovated, the sockets must be reserved a little more, because most of the electrical equipment used in most families nowadays is very large. If the socket is not reserved enough, you can only use the power strip, which is not only inconvenient to use, but also has great potential safety hazards.

    3. Waterproofing the kitchen and bathroom The kitchen and bathroom are the areas with the largest water consumption in the home, so when decorating the house, the waterproofing of these two areas must be done well, so as not to make an impression on the later life. In addition, when checking the waterproof effect, be sure to carefully inspect the toilet, floor drain and water pipe, which are more likely to cause problems. Article Summary:

    The above is about the order of house decoration and what needs to be paid attention to in house decoration, I hope it will be helpful to you. If you want to know more about it, please continue to pay attention to Qeeka Home.

    Do the math how much it will cost you to renovate your home

  5. Anonymous users2024-02-02

    The correct decoration construction steps will not only save us time when decorating, but also ensure our decoration effect. Therefore, when we carry out home decoration, people also want to understand the order of decoration, so that our decoration will also achieve twice the result with half the effort. Let's take a look at it with usThe order in which the house is renovatedWhat are they?

    This helps us to renovate the reference.

    1. What is the order of house decoration?

    1. In terms of house decoration steps, before the decoration of the preliminary design, it is necessary to choose a reliable decoration company first, and it is inevitable that the regular decoration company will provide users with a complete house design drawing, and will also help to understand the problems that are prone to occur in the process of home decoration, and make detailed data records.

    2. After the design drawings of the main body are designed, the next step is to select the date of construction, which is very important, to make a reasonable layout of the entire frame of the house, to demolish and modify the wall, to shovel the wall skin and other steps to show the frame of the house. After the completion of the renovation and demolition of the round water, the installation position of the cabinet is measured, and the position of the fume pipe and socket is reserved at the required installation position, because the transformation of hydropower belongs to the hidden project in the home decoration, so as not to bring trouble to the later decoration.

    3, construction, carpentry, bricklayer, lacquer, this is our project, after the completion of the hydropower transformation, you can carpentry, bricklayer and lacquer work in order to decorate, first from the carpentry, carpentry generally includes the ceiling modeling and large wardrobe and other projects, bricklayer refers to the wall and ground for the foundation construction and treatment, is the carpentry and bricklayer two projects to do the final improvement work.

    2. What are the taboos for house decoration?

    1. In terms of home decoration, there are too many mirrors. Mirrors are a must-have item in home decoration, and they are also to be understood, mainly used for makeup and dressing. However, the mirror is a cold thing, easy to attract evil and break money, in the general home decoration, only in the bathroom cabinet in the bathroom to install a mirror makeup dress and cloakroom installation of a dressing mirror to dress up these two mirrors.

    Broken pot stove in feng shui generally represents the item of prosperity and wealth, if there are cracked pots and stoves in the home, they should be replaced in time, which can prosper and make money.

    2. It is forbidden to know that the door post and door leaf are bent or cracked. It has to be considered that the doorpost or door leaf is bent or broken, which means that the God of Wealth does not come in, but the God of Poor God comes in. Therefore, we should choose a wooden door brand with guaranteed quality when decorating the house, and the workers who install the wooden door should also be professional and responsible enough to ensure that our door posts and door leaves do not bend and crack.

    3. It must not be ignored that the bedroom door should not be directly facing the kitchen door, which is also necessary to prevent its humidity and heat from flowing relative to the bedroom door; The door should not be facing the bathroom, because the water vapor after bathing and the ammonia from the toilet can easily diffuse into the bedroom, and most of the fabrics in the bedroom are moisture-absorbing, which will make the environment more humid; The bedroom door should not be facing the door of the storage room, which is often moldy and easy to hide dirt and dirt. Therefore, if this is the case during the renovation of the house, we change the layout of the house.

Related questions
14 answers2024-03-17

First of all, I want to say that the question of order is not absolute, and secondly, there are steps that can be divided into several steps. Let me briefly describe the order in which this room was renovated. >>>More

8 answers2024-03-17

When it comes to interior renovation, there are certain steps and sequences that need to be followed to ensure a smooth process throughout. First of all, the first step in renovation is usually design and planning. This includes determining the style of the renovation, color scheme, material selection, etc., and developing a detailed renovation plan. >>>More

11 answers2024-03-17

How to decorate the bathroom, many people may not have carefully considered, think that the bathroom is a shower, toilet and washing, as long as the toilet, shower and washstand are installed, in fact, the bathroom decoration process is not understood, the later troubles are a lot, the following 8 major bathroom decoration process, do it, you can also install the perfect bathroom. Step 1, hydropower transformation, hydropower positioning, oblique tee, water trap, water supply pipe pressure test, drainage test water can not be missing, choose the wall row or the ground row, in this step also to plan Step 2, sewer sound insulation, sewer pipe sound insulation If you don't do a good job, as soon as you release water upstairs, your home will make a noise Step 3, the bottom layer is waterproof, and the bottom layer is slope waterproof to avoid hiding water at the bottom in the future. Step 4, the wall is waterproof, the base layer should be waterproof to be 40 cm, and the surface layer waterproof should be 2 meters 4 high. >>>More

8 answers2024-03-17

Code for Fire Protection of Interior Decoration Design of Buildings [with Explanation of Provisions] GB 50222-95 (Revised 2001). >>>More

10 answers2024-03-17

Clause. 1. The construction needs to do a good job of safety protection, do a good job of pre-construction enclosure, and isolate the space separately. >>>More