To decorate bathrooms and kitchens, do you install doors or tiles first?

Updated on home 2024-07-05
30 answers
  1. Anonymous users2024-02-12

    In the process of renovating the bathroom and kitchen, in general, we will first lay the bricks and then install the door. This order is based on several reasons. First of all, the installation of the door needs to be carried out under the condition of a flat wall, and the paving of bricks can make the wall more flat, which is conducive to the installation of the door.

    Secondly, if the door is installed first, it may affect the paving of the bricks and may even cause damage to the door. Finally, the installation of the door is usually carried out in the final stage of the renovation to prevent unnecessary damage to the door during the renovation process.

    The specific decoration of the house can be calculated here, just enter the area + city, calculate the decoration in 3 seconds, know the real ** in advance, and easily grasp the decoration company: [Click here, free decoration**].

    In the local market, the price of bricks usually ranges from 30-300 yuan per square meter, depending on the material, brand and specifications of the bricks. The ** of the door ranges from 500-5000 yuan per door, depending on the material, brand and design of the door. These ** are for reference only, and the specific decoration cost also needs to be determined according to the actual situation and personal needs.

    When decorating, it is recommended that you first find a professional renovation company or worker, who will provide you with a reasonable renovation plan and budget according to your needs and budget. At the same time, it is also recommended that when choosing bricks and doors, you should not only consider **, but also consider their quality and durability to ensure the effect and longevity of the decoration. During the renovation process, it is also necessary to pay attention to protecting the facilities that have been installed to avoid damage to them during the decoration process.

    Finally, it is recommended to recommend our "Tuba Rabbit", Tuba Rabbit has 110,000 decoration companies and first-class businessmen in his hands, and the direct sales of building materials are affordable. Tuba Rabbit is selected for decoration, and Tuba Rabbit can accompany the signing of the contract for free, "decorate first and then make payment", reducing the worries of the owners. For more decoration information, welcome to visit:

    Click to enter, professional customer service free consultation good company].

    Kunming - [Kunming Decoration Strategy Guide].

    Suzhou - [Suzhou Decoration Strategy Guide].

    Hefei - [Hefei Decoration Strategy Guide].

    Fuzhou - [Fuzhou Decoration Strategy Guide].

    Beijing - [Beijing Decoration Strategy Guide].

    Dalian - [Dalian Decoration Strategy Book].

    Hangzhou - [Hangzhou Decoration Strategy Guide].

    Shanghai - [Shanghai Decoration Strategy Guide].

    Tianjin——[Tianjin Decoration Strategy Guide].

  2. Anonymous users2024-02-11

    Generally, bricks will be pasted first, because the bathroom has a slope paving, which is convenient for water to flow to the floor drain.

    It will be easier to install when the door is installed in the later stage. In addition, there will be some differences according to the type of door used, such as wooden doors, which should be tiled first and then installed with door covers.

    with the door. In this way, the edge is better and more beautiful;

    2. It is an aluminum alloy door or a plastic steel door, it is necessary to install the door first and then paste the brick, because the aluminum alloy and plastic steel door are relatively simple doors, it only has the door frame and no door sleeve, and the edge of the brick can not be closed, so it is necessary to install the door first and then paste the brick door edge to look good.

  3. Anonymous users2024-02-10

    There are two situations, 1. It is a wooden door, and it is necessary to paste the brick first and then install the door cover and door. In this way, the edge is better and more beautiful; 2. It is an aluminum alloy door or a plastic steel door, it is necessary to install the door first and then paste the brick, because the aluminum alloy and plastic steel door are relatively simple doors, it only has the door frame and no door sleeve, and the edge of the brick can not be closed, so it is necessary to install the door first and then paste the brick door edge to look good.

  4. Anonymous users2024-02-09

    Install the door frame first and then put the tiles, my kitchen and bathroom do this, the rest of the place is wooden flooring, first install the door, and finally lay the wooden floor.

  5. Anonymous users2024-02-08

    I'm a home improvement guy.

    Generally, the ground is paved first.

    If there is no time to install the door for the time being.

    You can ask the brick laying master to lay the wall tiles in the bathroom and kitchen to a position where there is only one brick away from the door, and then make the door.

    The bricklayer master finishes up.

    Relatively easy to do.

  6. Anonymous users2024-02-07

    Generally, the door is installed first and then tiled, because the tiles on the side of the door need to be cut and then poured at a 45-degree angle.

  7. Anonymous users2024-02-06

    Paste anywhere first, you need to pay attention to two points, one is that the bathroom floor tile and the living room tile junction to the living room floor tile shall prevail, the tile joints of the two are parallel or perpendicular, so often paste the living room floor tiles first, according to the living room floor tile joint to find the bathroom tile joint; Second, there is a height difference between the bathroom and the living room floor tiles, the height difference between the bathroom is easy to control, and the living room needs to consider the bathroom tile pavement to leave room for ash, otherwise the height difference between the living room and the bathroom tiles cannot be guaranteed, and it is easy to cause the phenomenon of water storage on the bathroom floor.

  8. Anonymous users2024-02-05

    The decoration of the new house is pasted with floor tiles, and I recommend sticking the living room first. Because the living room is one of the most commonly used places in the home environment, when the floor tiles are bought. It is generally an estimated size, and in the floor tiles, and there is a loss.

    Paste the living room first. It is guaranteed that there are plenty of tiles to choose from, and after starting from the living room. Even if the module is not enough, it can be pasted to the corners of the bathroom.

  9. Anonymous users2024-02-04

    Personally, I think that the bathroom needs to be pasted first, the bathroom needs to be leak-proof, and after the bathroom is pasted, then the kitchen and living room will be pasted, so that the living room floor tiles will not be dirty.

  10. Anonymous users2024-02-03

    Paste the living room first, the bathroom last, and the bathroom should be leak-proof.

  11. Anonymous users2024-02-02

    For the decoration of a new house, the floor tiles of the living room are generally pasted first.

  12. Anonymous users2024-02-01

    Under normal circumstances, the wall tiles are pasted first, because now the decoration is the principle of wall tiles pressing floor tiles, especially for the bathroom, which can effectively improve its waterproof effect and ensure the quality of construction. If the floor tiles are pasted first, during the construction of wall tiles, the cement mortar is easy to fall on the floor tiles or flow into the floor drain, which increases the difficulty of cleaning and is easy to block the floor drain. This can be avoided if you put wall tiles first.

    When tiling, it is recommended to start from the height of one brick on the ground to paste wall tiles, from the bottom up, until the required height is reached, and then start to paste the floor tiles. After the floor tiles are completed, paste the bottom row of wall tiles to achieve the effect of pressing the floor tiles.

    Most decoration companies or construction parties generally lay wall tiles first, and then lay floor tiles, because this laying sequence will not affect the wall tiles and will not delay the construction period. If the wall tiles are laid first, they are generally laid from the middle, and the height of a brick is generally reserved in the lower part. When paving, bricks should be placed below to prevent the bricks above from slipping off, and the tiles can only be removed after they are completely glued.

    Pay attention to check the water absorption rate of the tiles. If the water absorption rate of the tile is relatively high, then it needs to be soaked in water before paving. After soaking the tiles in water, take them out, set them aside to dry, and then lay the soaked tiles.

    In fact, there is no clear answer to whether the bathroom should be plastered with wall tiles or floor tiles first. The specific construction sequence should be decided according to the actual situation of the bathroom. It should be determined whether the laying of floor tiles or wall tiles is conducive to the reasonable protection of the pre-construction project and the avoidance of damage to the pre-construction project, such as electrical circuits, waterways, etc.

    If the floor tiles are laid first, and then the wall tiles, then the wall tiles should be laid 24 hours after the floor tiles are laid. If it is a particularly humid area, then the waiting time will be longer.

    When paving, pay attention to separating the floor tiles and wall tiles, and pay attention to checking the waterproof and anti-slip performance of the tiles to avoid problems in the later stage. When laying bathroom tiles, you should pay attention to the laying order of the tiles, so as to avoid shoddy decoration construction personnel, which will cause great inconvenience to your future life. The above is a detailed introduction to whether the bathroom should be plastered with wall tiles or floor tiles first.

    I hope to help all friends who need to renovate the bathroom.

  13. Anonymous users2024-01-31

    It is best to put the tiles on the wall first, because if you have pasted the floor, you need to wait for it to dry before you can stick to the wall.

  14. Anonymous users2024-01-30

    Wall tiles should be applied first. This avoids gaps and also prevents the cement mortar from falling on the floor tiles.

  15. Anonymous users2024-01-29

    The bathroom can still choose to paste the wall tiles and then the floor tiles, so that it is not easy to have gaps, and the decoration is more beautiful.

  16. Anonymous users2024-01-28

    Generally speaking, it is to put the bricks first and then open the door, unless you have some other advanced needs

  17. Anonymous users2024-01-27

    There are two situations, 1. It is a wooden door, and it is necessary to paste the brick first and then install the door cover and door. In this way, the edge is better and more beautiful; 2. It is an aluminum alloy door or a plastic steel door, it is necessary to install the door first and then paste the brick, because the aluminum alloy and plastic steel door are relatively simple doors, it only has the door frame and no door sleeve, and the edge of the brick can not be closed, so it is necessary to install the door first and then paste the brick door edge to look good.

  18. Anonymous users2024-01-26

    Of course, it is to be tiled first, and there is no objection to this!

  19. Anonymous users2024-01-25

    First the door cover, then the tile, and then the door frame.

  20. Anonymous users2024-01-24

    It is best to paste wall tiles in the bathroom first to achieve "wall tiles pressing floor tiles", which can improve the waterproof effect of the bathroom and ensure the quality of home decoration.

    First, if the floor tiles are pasted first, it is easy to cause wear and tear of the floor tiles when the wall tiles are pasted, and the quality of the floor tiles will be counterproductive and cause unnecessary losses, so you can only start with the wall tiles first.

    Second, if you stick the floor tiles first, when you paste the wall tiles, it is easy to cause the wear and tear of the floor tiles, and the quality of the floor tiles will be counterproductive and cause unnecessary losses, so you can only start with the wall tiles first.

    3. If you want to complete the statement of "wall bricks pressing floor tiles", then you can try to paste the wall tiles from a high position of a brick from the ground, and then paste the wall tiles upwards in turn, until the height that needs to be pasted, and then start to paste the floor tiles, paste all the floor tiles, and finally paste a row of wall tiles at the bottom layer, so that you can complete the statement that the wall presses the ground, and can greatly improve the waterproof effect of the toilet. And because the floor of the bathroom is designed with a certain slope, the water flowing to the ground will also flow along the slope to the floor drain. Of course, this method is also difficult to build, as the owner, we can clearly put forward our own requirements, and can carry out on-site supervision to ensure the quality of home decoration.

  21. Anonymous users2024-01-23

    Floor tiles are a kind of floor decoration material, also called floor tiles. It is made of clay firing. A variety of specifications. Hard, pressure-resistant, wear-resistant, moisture-proof. Some are glazed and have a decorative effect.

  22. Anonymous users2024-01-22

    The bathroom should be plastered with wall tiles first, because if you put the floor tiles first, the dust that falls when you put the wall tiles will fall on the floor tiles, and it will be difficult to clean up, so, in order, you should put the wall tiles first.

  23. Anonymous users2024-01-21

    The tiles in the bathroom are generally pasted to the wall first, and then to the floor tiles.

  24. Anonymous users2024-01-20

    Paste the wall tiles first, how can there be the floor tiles first? Unless the old house is renovated, there is no floor tile first.

  25. Anonymous users2024-01-19

    Lay the floor tiles first, and then paste the wall tiles, so that the bath water in the bathroom can be left along the wall and can be slipped directly into the sewer, and it is not easy to seep water down.

  26. Anonymous users2024-01-18

    Of course, the wall tiles should be pasted first, because it is the right choice from top to bottom.

  27. Anonymous users2024-01-17

    The inside of the bathroom should be plastered with wall tiles first, and then with floor tiles.

  28. Anonymous users2024-01-16

    The bathroom is plastered with wall tiles first, because the cement and sand are constantly falling below, you should want to work below, and wait for the wall tiles to be almost dry, and then paste the floor tiles.

  29. Anonymous users2024-01-15

    Most of them are plastered with wall tiles first and then floor tiles.

  30. Anonymous users2024-01-14

    Summary. Paste the living room first It is recommended to decorate the new house and paste the floor tiles in the following order: 1Living room, bedroom and other spaces, 2Toilets, kitchens, balconies, corridors and other water-ground coupling parts, 3Doors, windows and window slots, 4Floor walls.

    Paste the living room first It is recommended to decorate the new house and paste the floor tiles in the following order: 1The living room is hypocritical, the bedroom Lu Qing and other spaces, 2

    Bathroom, kitchen, balcony, corridor and other water-ground coupling parts, 3Doors, windows and window slots, 4Floor walls.

    Is it okay to use the floor tiles in the first and auxiliary bathrooms?

    No, because the bathroom is a water-to-ground coupling part, when the floor tiles are decorated in the new house, it is necessary to lay auxiliary floor tiles first, and then rot the veneer floor tiles, so as to ensure that the floor tiles are durable for a long time.

    Is it okay to use the floor tiles in the bathroom and the floor tiles in the living room?

    Yes, because the living room is a non-coupled part of water and ground, when decorating the floor tiles in the new house, you can first assist the floor tiles of Weishou Mountain, and then paste the floor tiles of the living room to ensure the correct bending of the floor tiles.

Related questions
26 answers2024-07-05

When decorating a house, it is common to install doors first and then lay tiles. Renovation can generally be carried out by following these steps: >>>More

20 answers2024-07-05

Bathroom decoration is good with tiles first; If the toilet is installed first, it will affect the laying of tiles, which will also cause waste of materials, if the tiles are then laid, so that the tiles can be cut according to the size of the toilet, and it will not affect the appearance and will not cause waste.

21 answers2024-07-05

For bathroom decoration, first paste the wall tiles, pave the tiles, confirm that the tiles are cured and dry, and level the tile gaps to the waterproof and beautiful joints according to the process order, and then install them in the toilet. >>>More

15 answers2024-07-05

<> case of buying doors and floors, you may consult the ** business, and the reply you get is all human factors, and your own goods should be installed first. Regarding this problem, we can analyze it together and see what advantages and disadvantages there are in the first door installation and first installation flooring. >>>More

8 answers2024-07-05

Among the many whole-house custom brands, Beiyi is a brand worth recommending. With its high-quality products and services, BEYI has won wide acclaim from consumers. We have a wide range of customized products, including wardrobes, bookcases, shoe cabinets, wine cabinets, TV cabinets, etc., which can meet the needs of different consumers. >>>More