Is it better to install the toilet or tile the bathroom decoration first? What is the reason?

Updated on home 2024-07-03
21 answers
  1. Anonymous users2024-02-12

    For bathroom decoration, first paste the wall tiles, pave the tiles, confirm that the tiles are cured and dry, and level the tile gaps to the waterproof and beautiful joints according to the process order, and then install them in the toilet.

    The bathroom decoration consists of two parts to form a whole. Wall tiles and floor tiles are hard decorations. Many people may not know much about hard loading. , the change of hydropower belongs to hard installation. Soft installation and hard installation are quite different. The end of the front hard installation process is followed by the soft installation at the back.

    All soft furnishings can be disassembled, unloaded and transported at any time. Bathroom decoration, wall tiles, floor tiles, three waterproof coatings, including smoothing the walls and floors, are laying the foundation for the follow-up process. The front procedure has not been completed, and the soft decoration in the back cannot be carried out.

    The construction process is reversed, which not only fails to achieve the ideal decorative effect, but also may cause rework and unnecessary waste of some materials. It is difficult to renovate in accordance with the order of construction important.

    Arrange the waterways in the bathroom that need to be remodeled. For example, the original waterway in our bathroom needs to be relocated, and these pipes may be installed on the ground, then the waterway should be renovated at this time. Waterproof structure on the bathroom floor.

    Because the bathroom is in accordance with the construction quality requirements of the construction project and the relevant specifications of the decoration, the floor of the bathroom must be waterproofed, so what we need to do at this time is the waterproof construction of the bathroom. Ground. After the waterproofing is completed, the corresponding closed water test must be completed.

    Laying bathroom floor tiles. Because the bathroom is a place with water and moisture, the traditional practice is to lay tiles on the floor. In addition, after we do a good job of waterproofing, we should lay tiles as soon as possible to avoid damage caused by waterproofing.

    Install some sanitary ware in the bathroom. This includes installing the most common toilets in our bathrooms, installing washbasins, and installing shower cabins.

    Judging by the regular decoration order of the bathroom, it should come first to the tile. Specifically, it is the sequence of waterproofing, laying floor tiles, and installing sanitary ware. According to the requirements of the toilet construction process, the bathroom should be paved with floor tiles first, and then the toilet should be installed.

  2. Anonymous users2024-02-11

    When renovating the bathroom, generally speaking, we will put tiles first and then install the toilet. There are several main reasons for this order.

    With the decoration device, you only need to enter the area + city, and calculate the most affordable local market in 3 seconds**: [Tuba Rabbit Big Platform Counts**].

    No longer worry about the company's price increase, omission and price increase.

    First of all, the tile can ensure that the installation position of the toilet is more accurate. If the toilet is installed first, it may affect the laying of the tiles, so that the tiles cannot completely cover the bottom of the toilet, which will affect the stability of the toilet and may even cause the toilet to displace.

    Secondly, tiling first can avoid damage to the tiles when installing the toilet. There may be some violent physical bumps during the installation of the toilet, which can be destroyed if the tiles have already been laid. And if you lay the tiles first, you can take some protective measures when installing the toilet to avoid damage to the tiles.

    In addition, the first tile can make the decoration of the bathroom better. The color and style of tiles have an important impact on the overall effect of the bathroom, if the toilet is installed first, it may limit the choice of tiles and affect the decoration effect of the bathroom.

    In the local market, the ** of ceramic tiles is roughly 30-300 yuan per square meter, and the ** of toilets is between 500-3000 yuan. The specific ** will vary according to the brand, material, style and other factors.

    Therefore, it is recommended that when renovating the bathroom, you should first choose the right tiles for laying and then install the toilet. This can not only ensure the installation quality of the toilet, but also make the decoration effect of the bathroom better.

  3. Anonymous users2024-02-10

    The correct way is to tile first and then install the toilet. Because the toilet is installed first, it is not easy to pave when laying tiles. And the tiles near the edge of the toilet bowl will leave some gaps when pasting.

    In this way, when used in the later stage, there will be water leakage. And install the toilet first, there will be bumps when tiling, which will leave some scratches on the toilet. And when laying tiles, if there is mortar falling into the toilet, it will also make the toilet blockage.

  4. Anonymous users2024-02-09

    I think it's better to tile first, because this can have a better protection for the toilet, so that we will not have an impact on the appearance of the toilet when the tile is pasted again.

  5. Anonymous users2024-02-08

    Of course, the tiles should be laid first, so that the gap between the tiles and the toilet can be stitched with beautiful stitches later, and the toilet can be fixed.

  6. Anonymous users2024-02-07

    We decorate our home and follow up the whole process ourselves.

    Now I would like to share my toilet renovation experience with you.

    1. Tiles, made by the plastering master.

    2. Water heater, water heater seller installs. Our house uses a gas water heater, not a toilet fit.

    3. Squatting toilet, mud master with hydropower master installation.

    Toilet, in addition to the decoration things you know, there are many other accessories, all of which must be taken into account, and it is far from enough to consider the above 3.

    First, the plumber, according to what you require the bathroom to install, install it in **, set a good location for him, and he will lay out the water pipes and wires for you.

    Before that, you have to know that you have to install bathroom cabinets at home, squat toilets, faucets, floor drains, shower rooms, urinals, toilets, etc. What needs to be ordered in advance is a squatting toilet, and the installation height of the urinal and the distance between the toilet holes need to be informed.

    Second, the plasterer will fill in the land for you according to the location reserved for water and electricity, and pave the floor tiles and wall tiles.

    Special attention should be paid to the fact that the squatting toilet was installed with the help of the plasterer at this time.

    Third, after the whole house decoration is completed, you can pull back the bathroom cabinet, toilet water heater or something, all of which are directly installed by the seller, so you don't have to worry about it.

  7. Anonymous users2024-02-06

    Wall tiles must be applied first. Otherwise, after installing the water heater, it will not be able to fully paste the wall tiles.

  8. Anonymous users2024-02-05

    1 Buried pipe: The water heater and squatting water pipes are buried in the wall, and the underground 2 wall tiles 3 floor tiles 4 sit on the toilet, and sit on the floor tiles. Ann water heater, the hook of the water heater is to hit expansion screws and hang it on the wall tiles with a hanger.

  9. Anonymous users2024-02-04

    Install the toilet first, then paste the tiles, and then install the water heater, the water heater should be installed after half a month after the tiles, if you don't understand, please decorate it.

  10. Anonymous users2024-02-03

    Bathroom decoration is good with tiles first; If the toilet is installed first, it will affect the laying of tiles, which will also cause waste of materials, if the tiles are then laid, so that the tiles can be cut according to the size of the toilet, and it will not affect the appearance and will not cause waste.

  11. Anonymous users2024-02-02

    When decorating the bathroom, it is better to put tiles first; The basis is that if the toilet is installed first, there will be a certain obstacle to the later tiling, and the tiles close to the toilet are not easy to pave, and improper operation will easily cause water leakage.

  12. Anonymous users2024-02-01

    The tiles should be laid first, and the toilet can only be installed after the tiles are pasted, and then the gaps can be closed with glass glue, or they can be closed with a beautiful sewing agent.

  13. Anonymous users2024-01-31

    It must be the first to make tiles, so that it can be more beautiful, can effectively avoid water leakage, most of the decoration is done this.

  14. Anonymous users2024-01-30

    You should put tiles first, and then choose the toilet, which is a correct installation procedure, and will also get a good decoration for the bathroom in your home.

  15. Anonymous users2024-01-29

    I think the toilet should be installed first. Once the toilet is installed, the tiles will be able to fit snugly against the toilet. That doesn't seem particularly inconsistent.

  16. Anonymous users2024-01-28

    Is the bathroom decoration the toilet or tiled first? This question is still unknown to many. While it's just a matter of order, the build order is out of order, later or more cumbersome.

    If you install the toilet first, the tiles behind it will be badly paved, and the tiles attached to the toilet bowl will be easy to leave joints and may leak.

    <> there is also the installation of the toilet first, it is inevitable that there will be bumps when tiling, and it is easy to leave scratches on the toilet. If you drop the mortar down the toilet, it will clog. Finally, it was used for a long time.

    If the toilet is installed first, it will be more laborious to replace or maintain. Therefore, bathroom decoration is to first paste tiles and then install the bathroom, everyone remember! The first tile protects the toilet from damage during renovation work.

    If the toilet is installed first, it may accidentally scratch the toilet during the subsequent tile installation process. In addition, if the dust and cement mortar generated during the tile installation process enter the toilet first, the toilet may become clogged.

    If the bathroom was installed during the renovation, then if there is a problem with the toilet later, it needs to be repaired or replaced. To replace the toilet, you need to pry open the tiles, which destroys the waterproofing and is time-consuming and laborious. If the bathroom is installed first, it will hinder the tiling later.

    The tiles near the toilet are not easy to lay, and improper operation is easy to cause leakage and other problems. Therefore, it is better to paste tiles first from all aspects, but the mushroom god reminds you of one point: when pasting tiles, you must reserve the location of the bathroom, and at the same time determine the distance, and then seal the gap below with silicone.

    If you don't calculate the distance, it will be more troublesome to install the toilet later.

    The above is a detailed interpretation of the problem, I hope it will help you, if you have any questions, you can leave me a message in the comment area, you can comment with me, if there is something wrong, you can also interact with me more, if you like the author, you can also follow me, your like is the biggest help to me, thank you.

  17. Anonymous users2024-01-27

    Floor tiles should be laid first, which can avoid water leaks and can also help with later repairs.

  18. Anonymous users2024-01-26

    You should go to tile first and then install the toilet, which is the correct way and order of decoration.

  19. Anonymous users2024-01-25

    Personally, I think that the toilet should be installed first and then tiled, so that it will not hurt the tiles.

  20. Anonymous users2024-01-24

    Do the math how much it will cost you to renovate your home

    Lay the tiles first, reserve a good place, and then install the toilet. If the order is reversed, the following three situations will occur:

    1. If the toilet is installed first, it will bring great trouble to the tile paving. The tiles near the toilet are not easy to pave, and improper operation is prone to water leakage and other problems. Once the water leaks, it is a very tricky problem, especially in the bathroom, which can cause a lot of odors and bring difficulties to our lives.

    2. If the toilet is installed first, the toilet will fail in the later stage and need to be repaired or replaced. When changing the toilet, you need to pry open the tiles, which may damage the waterproofing, which is time-consuming and laborious, which is more troublesome. Tapping tiles is not a simple process, and it is also troublesome to re-paste and re-apply.

    So these questions should be considered in advance.

    3. Tile first can protect the toilet from being damaged during the decoration process. If you install the toilet first, you may accidentally scratch the toilet when tiling it later. In addition, if the toilet is installed first, dust, cement mortar, and stains from tiling can easily enter the toilet bowl and may cause the toilet to become clogged.

    In fact, the toilet is very fragile, and once scratched, it will seriously shorten the service life of the toilet. So what we have to do is to plan ahead, lay the tiles first, and then install the toilet.

    Enter the area and get the decoration for free**].

  21. Anonymous users2024-01-23

    At present, many home decoration will choose convenient and high-end flush toilets, due to the small area of the bathroom, bathroom equipment and decoration, the paving of ceramic tiles is more exquisite. Many home improvement novices will have a question, whether to install the toilet or pave the tiles first? Don't think that it doesn't matter if you pretend casually, if you confuse the order of the two, there will be a lot of trouble in the future.

    Generally, the decorator will recommend that the bathroom be tiled first and then install the toilet. So why do you need to lay tiles in the first place? Let's find out.

    First, the reason for laying tiles first and then installing toilets.

    1. Pave the tiles first, then the toilet is installed independently, which is convenient for later maintenance and repair. Otherwise, the toilet is installed first, and if the toilet needs to be replaced after being damaged, it is necessary to replace the tiles around the toilet, which is time-consuming and time-consuming, and the key is that you may not be able to find the same tile.

    2. Prevent water seepage in the later stage. If the toilet is installed first, it will be difficult to pave the tiles around the toilet, and it is easy to seep water if the paving is improper. Especially in the bathroom, once the water seepage will definitely have a peculiar smell, which has a great impact on our daily life, and the owners will choose to repair it, so the cost is one more layer.

    3. The best toilet is only ceramic, ceramics can not withstand beating, if the toilet is installed first, it is easy to scratch or even damage the toilet when the tile is paved in the later stage. Even if the master's craftsmanship is good, if the mud "accidentally" falls into the toilet, it is a very headache to cause the toilet to be clogged in the later stage.

    things. <>

    Second, the construction steps of laying tiles first and then installing toilets.

    1. The measurement position is very important, and the toilet position should be reserved when laying tiles, and various water and electricity lines should be planned to avoid rework in the later stage. Also check the levelness of the floor, whether there are any blockages, etc.

    2. After the water and electricity lines are installed, the wall surface will be treated. Deal with the waterproof surface first, paint the wall, and lay the wall tiles before installing the toilet, which is another reason to lay the tiles first and then install the toilet.

    3. Floor tiles. Not only is it waterproof, but it is also very easy to clean. Before paving the floor tiles, it is necessary to pay attention to the distance and position of the toilet bowl accurately, so as to avoid rework due to size problems in the later stage.

    4. For the sake of aesthetics, ceiling treatment is also necessary for bathroom decoration, and at the same time, the location of bathroom equipment and lighting should be reasonably planned.

    5. When installing the toilet, the floor tiles around the toilet must be glued to the glass glue.

    Control the gap between the toilet and the wall and fix the toilet. Once the installation is complete, don't forget to check that the toilet flushes smoothly, that the switch is responsive, and so on. Also, if it is to install a smart toilet.

    Don't miss the toilet wiring and then install it.

Related questions
26 answers2024-07-03

When decorating a house, it is common to install doors first and then lay tiles. Renovation can generally be carried out by following these steps: >>>More

10 answers2024-07-03

If you don't know much or have no experience, it is easy to get worse and worse, especially the waterproof problem, so the bathroom is backfilled or waterproofed first? >>>More

20 answers2024-07-03

It is best to do a dry and wet separation at home, the advantage of dry and wet partitions is that you can take a bath and go to the toilet at the same time, and after taking a bath, you will not get the whole bathroom with water. If you don't plan to renovate the bathroom, it is recommended that you install a shower curtain to achieve dry and wet separation, which is a more convenient way. >>>More

11 answers2024-07-03

When it comes to bathroom renovation, there are certain processes that need to be followed to ensure the quality and effectiveness of the renovation. First of all, the sewer should be packed first, and then waterproofed. >>>More

16 answers2024-07-03

1. Bathroom waterproof construction steps.

Step 1: You can use slightly coarser cement as a primer first, and wait for the cement to dry before brushing the waterproof coating. But in painting money, the ground should be flat and there should be no grooves. Water is then sprinkled on the ground to expel the gas from the small holes. >>>More