Bathroom decoration is good with tiles first; If the toilet is installed first, it will affect the laying of tiles, which will also cause waste of materials, if the tiles are then laid, so that the tiles can be cut according to the size of the toilet, and it will not affect the appearance and will not cause waste.
-
When decorating the bathroom, it is better to put tiles first; The basis is that if the toilet is installed first, there will be a certain obstacle to the later tiling, and the tiles close to the toilet are not easy to pave, and improper operation will easily cause water leakage.
-
The tiles should be laid first, and the toilet can only be installed after the tiles are pasted, and then the gaps can be closed with glass glue, or they can be closed with a beautiful sewing agent.
-
It must be the first to make tiles, so that it can be more beautiful, can effectively avoid water leakage, most of the decoration is done this.
-
For bathroom decoration, first paste the wall tiles, pave the tiles, confirm that the tiles are cured and dry, and level the tile gaps to the waterproof and beautiful joints according to the process order, and then install them in the toilet.
The bathroom decoration consists of two parts to form a whole. Wall tiles and floor tiles are hard decorations. Many people may not know much about hard loading. , the change of hydropower belongs to hard installation. Soft installation and hard installation are quite different. The end of the front hard installation process is followed by the soft installation at the back.
All soft furnishings can be disassembled, unloaded and transported at any time. Bathroom decoration, wall tiles, floor tiles, three waterproof coatings, including smoothing the walls and floors, are laying the foundation for the follow-up process. The front procedure has not been completed, and the soft decoration in the back cannot be carried out.
The construction process is reversed, which not only fails to achieve the ideal decorative effect, but also may cause rework and unnecessary waste of some materials. It is difficult to renovate in accordance with the order of construction important.
Arrange the waterways in the bathroom that need to be remodeled. For example, the original waterway in our bathroom needs to be relocated, and these pipes may be installed on the ground, then the waterway should be renovated at this time. Waterproof structure on the bathroom floor.
Because the bathroom is in accordance with the construction quality requirements of the construction project and the relevant specifications of the decoration, the floor of the bathroom must be waterproofed, so what we need to do at this time is the waterproof construction of the bathroom. Ground. After the waterproofing is completed, the corresponding closed water test must be completed.
Laying bathroom floor tiles. Because the bathroom is a place with water and moisture, the traditional practice is to lay tiles on the floor. In addition, after we do a good job of waterproofing, we should lay tiles as soon as possible to avoid damage caused by waterproofing.
Install some sanitary ware in the bathroom. This includes installing the most common toilets in our bathrooms, installing washbasins, and installing shower cabins.
Judging by the regular decoration order of the bathroom, it should come first to the tile. Specifically, it is the sequence of waterproofing, laying floor tiles, and installing sanitary ware. According to the requirements of the toilet construction process, the bathroom should be paved with floor tiles first, and then the toilet should be installed.
-
When renovating the bathroom, generally speaking, we will put tiles first and then install the toilet. There are several main reasons for this order.
With the decoration device, you only need to enter the area + city, and calculate the most affordable local market in 3 seconds**: [Tuba Rabbit Big Platform Counts**].
No longer worry about the company's price increase, omission and price increase.
First of all, the tile can ensure that the installation position of the toilet is more accurate. If the toilet is installed first, it may affect the laying of the tiles, so that the tiles cannot completely cover the bottom of the toilet, which will affect the stability of the toilet and may even cause the toilet to displace.
Secondly, tiling first can avoid damage to the tiles when installing the toilet. There may be some violent physical bumps during the installation of the toilet, which can be destroyed if the tiles have already been laid. And if you lay the tiles first, you can take some protective measures when installing the toilet to avoid damage to the tiles.
In addition, the first tile can make the decoration of the bathroom better. The color and style of tiles have an important impact on the overall effect of the bathroom, if the toilet is installed first, it may limit the choice of tiles and affect the decoration effect of the bathroom.
In the local market, the ** of ceramic tiles is roughly 30-300 yuan per square meter, and the ** of toilets is between 500-3000 yuan. The specific ** will vary according to the brand, material, style and other factors.
Therefore, it is recommended that when renovating the bathroom, you should first choose the right tiles for laying and then install the toilet. This can not only ensure the installation quality of the toilet, but also make the decoration effect of the bathroom better.
-
The correct way is to tile first and then install the toilet. Because the toilet is installed first, it is not easy to pave when laying tiles. And the tiles near the edge of the toilet bowl will leave some gaps when pasting.
In this way, when used in the later stage, there will be water leakage. And install the toilet first, there will be bumps when tiling, which will leave some scratches on the toilet. And when laying tiles, if there is mortar falling into the toilet, it will also make the toilet blockage.
-
I think it's better to tile first, because this can have a better protection for the toilet, so that we will not have an impact on the appearance of the toilet when the tile is pasted again.
-
Of course, the tiles should be laid first, so that the gap between the tiles and the toilet can be stitched with beautiful stitches later, and the toilet can be fixed.
-
When decorating the bathroom, should you put tiles or install the toilet first? Install the toilet first. For the installation of the toilet, since the distance of the toilet drainage pit of the original developer does not necessarily meet the drainage distance of the toilet product, it is necessary to measure it during the toilet decoration to ensure that the toilet pit meets the drainage requirements of the toilet on the ground after completion, and the bottom is a flat surface for the finished toilet; During installation, it is also required that the ground where the hole closer is installed is also a flat closing surface, so as to ensure the firmness of the hole closer after installation, and the aesthetics of the hole diameter after the installation of the hole closer.
If the floor is uneven, then the toilet is not firm after installation and cannot be used normally when in use. At the same time, there is a large gap between the toilet and the floor tile, and the gap in the later stage cannot be beautiful. It is also more convenient to paste tiles first, and it is more convenient to replace the toilet bowl later, just replace the toilet directly.
On the contrary, it is necessary to pry the bricks first, which is not only easy to destroy the waterproof layer, but also time-consuming and laborious, and also needs to be re-paved. If purely from the point of view of decoration, the engineering team usually lays the floor tiles first, and then installs the toilet, of course, the premise of this is to reserve the position of the toilet, and at the same time determine the distance, and finally when laying the floor tiles, seal the gap under the toilet with silicone.
If you don't reserve the location of the toilet beforehand, it will be troublesome later. When choosing a toilet, feel the inside of the toilet. The glazed toilet bowl and embryonic body are delicate to the touch and have no concave and convex feeling.
In addition, its color is very uniform under bright light, without any damage or holes. In terms of decoration, it is generally necessary to lay floor tiles first and then install the toilet, but before doing so, you must reserve the location of the toilet, determine the distance, and then lay tiles, and then seal the gap under the toilet with silicone.
The above is a detailed interpretation of the problem, I hope it will help you, if you have any questions, you can leave me a message in the comment area, you can comment with me, if there is something wrong, you can also interact with me more, if you like the author, you can also follow me, your like is the biggest help to me, thank you.
-
When installing the bathroom, it should be tiled first, and then the toilet should be installed, so that the place where the toilet and the ground are in contact can be seamlessly connected.
-
Tile first, then install the toilet.
Because the toilet is installed first, it is not easy to pave when laying tiles. And the tiles near the edge of the toilet bowl will leave some gaps when pasting.
-
I think it is necessary to install the toilet first, otherwise it will be very troublesome and laborious to knock off the tiles when the tiles are installed.
-
Tiles should be applied first. Otherwise, some gaps next to the toilet may be inconvenient for tiling.
-
Do the math how much it will cost you to renovate your home
Lay the tiles first, reserve a good place, and then install the toilet. If the order is reversed, the following three situations will occur:
1. If the toilet is installed first, it will bring great trouble to the tile paving. The tiles near the toilet are not easy to pave, and improper operation is prone to water leakage and other problems. Once the water leaks, it is a very tricky problem, especially in the bathroom, which can cause a lot of odors and bring difficulties to our lives.
2. If the toilet is installed first, the toilet will fail in the later stage and need to be repaired or replaced. When changing the toilet, you need to pry open the tiles, which may damage the waterproofing, which is time-consuming and laborious, which is more troublesome. Tapping tiles is not a simple process, and it is also troublesome to re-paste and re-apply.
So these questions should be considered in advance.
3. Tile first can protect the toilet from being damaged during the decoration process. If you install the toilet first, you may accidentally scratch the toilet when tiling it later. In addition, if the toilet is installed first, dust, cement mortar, and stains from tiling can easily enter the toilet bowl and may cause the toilet to become clogged.
In fact, the toilet is very fragile, and once scratched, it will seriously shorten the service life of the toilet. So what we have to do is to plan ahead, lay the tiles first, and then install the toilet.
Enter the area and get the decoration for free**].
-
At present, many home decoration will choose convenient and high-end flush toilets, due to the small area of the bathroom, bathroom equipment and decoration, the paving of ceramic tiles is more exquisite. Many home improvement novices will have a question, whether to install the toilet or pave the tiles first? Don't think that it doesn't matter if you pretend casually, if you confuse the order of the two, there will be a lot of trouble in the future.
Generally, the decorator will recommend that the bathroom be tiled first and then install the toilet. So why do you need to lay tiles in the first place? Let's find out.
First, the reason for laying tiles first and then installing toilets.
1. Pave the tiles first, then the toilet is installed independently, which is convenient for later maintenance and repair. Otherwise, the toilet is installed first, and if the toilet needs to be replaced after being damaged, it is necessary to replace the tiles around the toilet, which is time-consuming and time-consuming, and the key is that you may not be able to find the same tile.
2. Prevent water seepage in the later stage. If the toilet is installed first, it will be difficult to pave the tiles around the toilet, and it is easy to seep water if the paving is improper. Especially in the bathroom, once the water seepage will definitely have a peculiar smell, which has a great impact on our daily life, and the owners will choose to repair it, so the cost is one more layer.
3. The best toilet is only ceramic, ceramics can not withstand beating, if the toilet is installed first, it is easy to scratch or even damage the toilet when the tile is paved in the later stage. Even if the master's craftsmanship is good, if the mud "accidentally" falls into the toilet, it is a very headache to cause the toilet to be clogged in the later stage.
things. <>
Second, the construction steps of laying tiles first and then installing toilets.
1. The measurement position is very important, and the toilet position should be reserved when laying tiles, and various water and electricity lines should be planned to avoid rework in the later stage. Also check the levelness of the floor, whether there are any blockages, etc.
2. After the water and electricity lines are installed, the wall surface will be treated. Deal with the waterproof surface first, paint the wall, and lay the wall tiles before installing the toilet, which is another reason to lay the tiles first and then install the toilet.
3. Floor tiles. Not only is it waterproof, but it is also very easy to clean. Before paving the floor tiles, it is necessary to pay attention to the distance and position of the toilet bowl accurately, so as to avoid rework due to size problems in the later stage.
4. For the sake of aesthetics, ceiling treatment is also necessary for bathroom decoration, and at the same time, the location of bathroom equipment and lighting should be reasonably planned.
5. When installing the toilet, the floor tiles around the toilet must be glued to the glass glue.
Control the gap between the toilet and the wall and fix the toilet. Once the installation is complete, don't forget to check that the toilet flushes smoothly, that the switch is responsive, and so on. Also, if it is to install a smart toilet.
Don't miss the toilet wiring and then install it.
-
Tile first. Reversing the order has the potential to result in unequal toilet installations. Because tiles need to be leveled, installing the toilet first may cause a certain slope between the toilet and the tiles.
-
The toilet needs to be installed first, so that the position of the toilet can be effectively determined, and the phenomenon of moisture return can be avoided, and it is more convenient to paste tiles; Reversing the order can cause the toilet installation to be misaligned, which can damage the tiles and make it unsightly.
-
Generally, when installing the bathroom, experienced decorators are first pasted with tiles and then installed with toilets, so that the waterproof system can be better detected.
-
Do you know the specific process of bathroom decoration? I want to ask you a question, let you decorate the bathroom, do you install the toilet first or put the tiles first? Maybe everyone's answer is different, so let's talk about this question below. Whether to tile or install the toilet first.
Bathroom decoration precautionsAs far as decoration is concerned, it is generally necessary to first disturb the floor tiles and then install the toilet, but before doing so, be sure to reserve the location of the toilet, and determine the distance, then lay tiles, and then seal the gap under the toilet with silicone. This is the answer given by the decoration master who has been in the industry for more than ten years, and it is said by the decoration master after communicating with the decoration master.
1. Why do you put bricks first and then install toilets? There are mainly these reasons.
1. Prevent water leakage.
If the toilet is installed first, it will hinder the later tile paving, and the tiles close to the toilet are not easy to pave, and improper operation will easily cause water leakage and other problems. If there is a water leak, it is a very difficult problem, especially in the bathroom, once the water leaks, it will cause a lot of odor and bring difficulties to our life.
2. It is convenient for toilet maintenance in the later stage.
If the toilet is installed first during the renovation, then if there is a problem with the toilet later, it needs to be repaired or replaced. Changing the toilet requires prie-opening tiles, which can damage the waterproofing and is quite time-consuming and laborious. This is more troublesome, knocking on the tile is also very troublesome, and it is very troublesome to re-paste and re-construct, so these problems must be considered in advance, and the problem of the province will be worried again.
3. Protect the toilet from being damaged.
Tile first to protect the toilet bowl from being damaged during renovation construction. If the toilet is installed first, the toilet may be accidentally scratched when tiling later, and if the toilet is installed first, the dust and cement mortar generated during tiling can easily enter the toilet, which may cause the toilet to become clogged. The toilet is actually very fragile, once scratched, it will seriously affect the service life of the toilet, we spent money to buy it, if it will not be used for a few years and replace it again, it is really not worth it, what we have to do is to take precautions, first paste tiles, and then install the toilet.
Second, the construction steps of tiles and toilets.
After figuring out whether the bathroom is installed with a toilet or tiled first, before the construction of tiles and toilets, we need to plan in advance and do a solid foundation work in the early stage.
1. Hydropower transformation.
2. Wall treatment.
3. Floor tiles are on the field.
4. Toilet project.
From all aspects, should the bathroom be installed with a toilet or bricked first? Of course, it is better to put tiles first. When decorating, it is not only the installation of the toilet, but also the construction process of the whole home, as long as we keep a clear mind, it will bring more relaxed and convenient life.
If we have a lot of processes and don't know what to do, we must inquire more about the residents of the same community, and we must not indiscriminately construct the construction, which will seriously affect the quality of our entire decoration. Why not?
For bathroom decoration, first paste the wall tiles, pave the tiles, confirm that the tiles are cured and dry, and level the tile gaps to the waterproof and beautiful joints according to the process order, and then install them in the toilet. >>>More
When decorating a house, it is common to install doors first and then lay tiles. Renovation can generally be carried out by following these steps: >>>More
If you don't know much or have no experience, it is easy to get worse and worse, especially the waterproof problem, so the bathroom is backfilled or waterproofed first? >>>More
It is best to do a dry and wet separation at home, the advantage of dry and wet partitions is that you can take a bath and go to the toilet at the same time, and after taking a bath, you will not get the whole bathroom with water. If you don't plan to renovate the bathroom, it is recommended that you install a shower curtain to achieve dry and wet separation, which is a more convenient way. >>>More
When it comes to bathroom renovation, there are certain processes that need to be followed to ensure the quality and effectiveness of the renovation. First of all, the sewer should be packed first, and then waterproofed. >>>More