In general, the floor tiles are paved first and then painted. The main reasons are:
1. If the arrangement is mainly conducive to the compact progress of the construction project. Tile paving is a construction project belonging to the bricklayer, generally the kitchen and bathroom tile paving is carried out first, and then the floor tile of the living room and bedroom is paved. When paving kitchen and bathroom tiles, it does not affect the oilman to carry out the base layer of the wall and ground, such as scraping gypsum putty and other base treatment, and the two can save construction time at the same time.
If it is after the kitchen and bathroom tiles are paved, wait until the wall is painted, and then pave the floor tiles in the living room and bedroom, you need to rearrange the bricklayer often and purchase cement and sand again, so that the construction consistency of the bricklayer is poor.
2. It is conducive to the protection of finished products. After the ground tile is paved, the ground tile adopts the finished protective film and the packing box to cover the brick surface for protection, relatively speaking, the wall painting construction is carried out on the dry solid floor tile, it will not cause much impact on the floor tile, and after the first painting, and then paving the floor tile, the difficulty of the protection of the wall will be relatively larger, one is that the material such as cement sand may cause damage to the wall when handling the cement, and the second is that the cement slurry will cause damage to the paint surface when splashing on the wall, and re-repair the paint, This is likely to cause inconsistent shades of wall paint.
However, the construction sequence is not unadjustable, such as the adjustment of the schedule of construction workers, the temporary shortage of tiles, etc., resulting in the delay of floor tile paving, etc., can be adjusted according to the specific situation of the above two construction projects, the core needs to pay attention to is to deal with the finished product protection, try not to cause damage to other projects that have been constructed.
-
If it is a floor, the general operation is to paint first and then lay the floor, so that the floor is better protected; If it is a floor tile, the floor tile cutting dust is very large, if you paint the wall first, it will affect the wall painting effect; But painting the wall, the general three layers, then you can brush the first two layers to start paving the floor tiles, and after the tiles are paved, you can brush the last primer, I think as long as the ground is protected, it will not affect the effect of both sides, and at the same time leave the last layer of painting, if the paving tiles damage the wall, you can also let the workers remedy.
-
The decoration follows the basic principle of first up and then down, from the inside to the outside, and also considers the protection of the finished product, the construction period, the process and the convenience of construction. The general practice is: first scrape putty on the wall and ceiling, only the paint process remains, and then pave the floor tiles, the wall tiles and the wall putty are not in the same area, which can be carried out synchronously, and finally brush the paint.
In the case of a tight construction period, the construction can be carried out in sections according to the room; If the conditions are special, the floor tiles must be paved first, and the ceiling and wall must be constructed after the adhesive mortar hardens (more than three days in summer and more than seven days in winter), and then the roof and wall are constructed after the surface is covered with waste cardboard; For rooms with both wall tiles and floor tiles, the wall tiles are constructed first, and the floor tiles are constructed later; During the construction of the coating, the ground should be protected, and the parts that cannot be protected from the paint can be easily erased with alcohol; Finally, the skirting is glued and the brick joints are treated.
-
It is advisable to paint the walls before laying the floor or tiles.
The reasons are as follows: 1. Follow a normal decoration process and sequence. That is, according to the basic principle of first up and then down, several volumes of clusters from the inside to the outside. Of course, under the necessary conditions, it is necessary to consider the protection of the finished product, the construction period, the process, etc.
Second, the specific implementation is to scrape putty and polish the walls and ceilings, and then pave the floor tiles after only the coating process. When the wall tile and the wall putty are not in the same area, it can be carried out synchronously, and the paint can be painted at the end.
Third, because when painting the wall, paint crumbs often fall on the floor tiles, so it takes a lot of effort to clean at that time.
Fourth, the most scientific approach should be to paint the wall first, but don't finish it. Then start making the flooring and finish the wall when you're done. Because the floor covers the wall at the corner where the wall meets the floor, the final molding still needs to leave the wall to the end.
-
In the decoration, whether to paste the compound tiles or scrape the putty first, in fact, this is not necessarily the process that has to be the body depends on the actual situation. General situation
In addition, simple decoration is to first use mortar** to make ground tiles, and then it is corner putty. In addition, the key stains the floor, and a layer of cardboard shell can be laid on the ground, so that the tiles on the ground can be well protected.
-
The system analyzes the order of wall painting and tiling, so that everyone knows at a glance. Even if the protection is good, it is inevitable that the cement will pollute the wall. Second, due to the use of concrete when tiling, the wall will have a certain degree of moisture or alkali return, at this time, if the wall has been painted, it will be very unfavorable to the stucco layer, which will cause discoloration and even fall off.
The system analyzes the order of wall painting and tiling, so that everyone knows at a glance. Even if the protection is good, it is inevitable that the cement will pollute the wall. Second, due to the use of concrete when tiling, the wall will have a certain degree of moisture or alkali return, at this time, if the wall has been painted, it will be very unfavorable to the stucco layer, which will cause discoloration and even fall off.
This decoration sequence is for the premise that there is no tile paving on the floor of the living room to be constructed, if the floor of the living room is tiled in the decoration, then the construction sequence will change, and it is necessary to use more standard construction steps to carry out. At this time, the wall is sandpaper and painted. Each step is closely linked, which also saves time on customization from one manufacturer, e.g
Washbox. Wooden doors. All kinds of hardware installation.
Cabinet doors and windows are installed. The paint is brushed first on the top and plaster line to save time for installing the fixtures.
Brush the wall first in the brick, the wall first clean and shovel, in the plastering of cement plaster, and so dry, you can paste the tile, in the tile to soak in water for 20 minutes, so that it will not fall. Cement master. It is easy to stain the wall during the mixing process.
In the process of tiling, it is also necessary to level by knocking, which may also stain the wall. If the wall is dirty, it is difficult to clean it, or even can't clean it, so it will cause the second brush of the wall, which is labor-intensive and time-consuming.
Secondary waterproofing, many owners have asked me, the developer has done waterproofing before, do you still have to do it when decorating? I tell you you must do it! And the closed water test must be done for more than 24 hours!
Because waterproofing is really important, leaking water is troublesome! The first tile is to pave the floor tiles first, and then the tile floor is protected, and then the wall construction is carried out, which must be noted, many of the previous construction did not protect the tile floor, and the ground cleaning is very troublesome in the later stage!
-
Of course, the bricks are laid first, and this work belongs to the bricklayer master, so now it should be carried out by the bricklayer, and then painted.
-
You should paint first, because then you can reduce some of the cleaning and put a lot of paint directly under the floor tiles.
-
Personally, I feel that it is necessary to paint first and then lay the bricks, because if the bricks are laid first, the paint will fall to the bricks, which is difficult to clean, so paint first, so that the paint will not fall on the floor.
-
It should be painted first, so that it can prevent the paint from dripping on the floor, and it is not easy to handle. Affect the overall aesthetics.
Among the many whole-house custom brands, Beiyi is a brand worth recommending. With its high-quality products and services, BEYI has won wide acclaim from consumers. We have a wide range of customized products, including wardrobes, bookcases, shoe cabinets, wine cabinets, TV cabinets, etc., which can meet the needs of different consumers. >>>More
Decoration is the need to do carpentry first, and finally do paint and whitewash, and the ceiling is carpentry.
When decorating your home, you can first paste the floor tiles, and then lay a mat on the floor tiles to paint the wall.
During the renovation process, in general, we will lay the flooring first, and then install the wardrobe. The main reasons for this are as follows. >>>More
When many friends are decorating at home, it is difficult to choose whether to lay floors or floor tiles on the balcony floor. The floor material of the balcony is different from the material installed in other room locks, and the balcony has been between the dry and wet areas for a long time. Try to choose floor tiles, which are easier to clean and relatively more practical. >>>More