When signing a contract with a renovation company, if you choose an all-inclusive service, then theoretically all renovation costs should be included, including the cost of water and electricity renovations. However, if in the actual operation process, the renovation company proposes that the water and electricity renovation needs to be charged according to the number of meters, then you need to judge whether this fee is reasonable according to the local market**.
With the decoration device, you only need to enter the area + city, and calculate the most affordable local market in 3 seconds**: [Tuba Rabbit Big Platform Counts**].
No longer worry about the company's price increase, omission and price increase.
In most cases, the cost of hydropower renovation is generally between 50-100 yuan per meter, and the specific ** will vary according to the quality of the material and the process level of the worker. If the renovation company proposes ** beyond this range, then you have the right to question and negotiate.
The cost of hydropower renovation mainly includes the following parts: material costs, labor costs and management costs. The material cost refers to the cost of purchasing wires, pipes, switches and sockets, etc., and this part of the cost will vary according to the quality of the material you choose.
Labor costs refer to the cost of installation and renovation by electricians and hydraulics, which will vary according to the worker's level of craftsmanship and workload. The management fee refers to the fee charged by the renovation company in order to coordinate and manage the entire renovation process, which usually accounts for 10%-20% of the total cost.
Therefore, when the renovation company proposes that the water and electricity renovation needs to be charged according to the number of meters, you need to clarify whether this fee is included in the all-inclusive service, if not, then you need to judge whether this fee is reasonable according to the above cost structure. If you think this is too much, then you can choose to negotiate with a renovation company or find another renovation company to work with.
-
Do the math how much it will cost you to renovate your home
According to the content of the contract signed by both parties, such as whether there is an agreement on the details of water and electricity in the contract. In this case, if the decoration company makes the decoration contract unable to perform, the owner can negotiate with the decoration company to ask it to terminate the contract and refund the corresponding amount and pay liquidated damages. However, if the decoration company does not deal with it, the owner can directly complain to the Consumer Association, and the personnel of the Consumer Association will do so.
Negotiate with the renovation company. If it still doesn't work, the owner can complain to the industry association, and they will arrange a commissioner to deal with it. The work can also deal with the problem in a humane way.
It really doesn't work, the owner only has to collect relevant evidence, such as text, ** and decoration contract and other evidence, and submit it to the court for trial.
When the owner signs the contract with the decoration company, he should carefully check the contract text, and if the terms are not established or the terms are not clear, he can re-indicate clearly, such as the actual brand, model specification and decoration completion date of the material, so as to prevent the decoration company from shoddy and delay the construction period. In addition, for decoration**, the owner should pay attention to the details to prevent the decoration company from adding additional items. In addition, when signing the contract, the owner should also indicate the decoration warranty period in the contract, so as to avoid the decoration company from handing over the risk to the owner.
Enter the area and get the decoration for free**].
Enter the area and get the decoration for free**].
-
In this case, you need to look at the terms and conditions of the renovation contract you have signed.
Generally, since it is an all-inclusive price, no other fees can be charged. But did you ask for more outlets and water points on site?If there is, there may be an increase in the fee, or there may be no fee at all.
It all depends on what is included in the all-inclusive contract. If the contract project is ambiguous, then it is advisable to terminate and stop the construction because of such a renovation company.
I have seen too many of these cases, and some of them have gone to court to terminate as soon as possible to reduce losses.
-
Hydropower is a hidden project in the decoration, is a very important part, many owners in the decoration will choose water and electricity all-inclusive to the decoration company, then the decorationWater and electricity are all-inclusive**
It is recommended not to be all-inclusive for water and electricity decoration, because they are all concealed projects, in case the quality of the materials used is not good, it will be troublesome to maintain in the future, and there will be hidden dangers.
We generally buy our own materials for water and electricity decoration (the quality can be controlled, and the cost depends on what quality of materials you use), and then hand over the road map to the plumber. Fu Hansui or you and the decoration company in the agreement will all the wires and cables, plumbing materials of the brand, model are set, in order to determine how much.
Do I need to add money for the decoration of water and electricity?
There are many decoration companies to take advantage of the owner's ignorance, if you think that the package is expensive, it will definitely say that you will receive a part of the money in advance, according to the actual occurrence, and when the water and electricity are finished, you have to pay for the exceedance, because the project is collected in advance, and the initiative is in the decoration company, at that time there is only a dumb loss.
But there are also very rare cases in Lao Bend, that is, they know what to do, know which part to do, and will not miss useful functions, and also know the calculation method and ** of hydropower transformation, so that they can be calculated according to the actual occurrence.
1. Before signing the contract, some decoration companies will say: how much is the discount for the deposit, and when the contract is signed, the owner can not grasp the bottom line, and the decoration company will say that many projects are not discounted, if the owner regrets it, the deposit will be lost.
2. Deliberately omitted items. When making a budget, some items are deliberately omitted in order to compete, resulting in a false uncertainty of the total price, so that the owner trusts that this company is very affordable. And when it comes to construction, the owner will say, "You didn't ask for it at that time, do you want to do it?"
Take the money! And it's not discounted. If the owner doesn't bring it up, he will say "I have a good idea, this place should do this", want to do it?
Take the money! 3. Take advantage of the owner's ignorance, such as hydropower renovation, in general, the decoration company has two ways, one is to wrap up, once the price is set, and the normal indoor should be included. Some foremen will ask the owner to buy switches, sockets, elbows, valves and so on. The second is to calculate the money according to the amount of work, and the company with a good reputation will do the necessary and reasonable water and electricity transformation, while some people, like a bad taxi, make a detour, resulting in an increase in the amount of work, and the owner spends money in vain.
The above is all the content of the home improvement network for everyone about the decoration of water and electricity all-inclusive**, I don't know if you have an understanding of the water and electricity all-inclusive ** after reading and playing this article, if you want to know more information about the water and electricity all-inclusive, please pay attention to the home improvement network, more wonderful home improvement information is in the home improvement network, please look forward to it.
What is a full package repair? What are the advantages and disadvantages of full package repair? Most of the owners are the first time to decorate, do not understand what is the full package repair, today Hefei decoration company to introduce to you the full package repair model. >>>More
It depends on how you make a contract with him? If you stare at it in detail, he can't add money, if you want to stare at it in detail, he will tell you, wait for you to pay part of the money, and then fill half of it for you, and then she will say that this is not within his scope, that is not within the scope of the contract, and will give you to fly on the information, so that you can pay thousands of dollars more, not because this is the wine of this goods, so you are signing a contract with him, and then you must top the details, so as not to be deceived.
There are many things that cannot be directly involved in the decoration, so I found a decoration company that can decorate the house and package it all. I thought that the whole ** decoration would be very reassuring, but if it is a design, it is better to organize the bag. The master found by the decoration company, the wall tile sticker in the kitchen can not be vertical, because the kitchen public smoke path is not at right angles, is it necessary to paste the brick after the mason repairs? >>>More
For the decoration of new houses, many owners will choose to give the whole package to the decoration company, because it is more worry-free and labor-saving, and they don't have to worry about the decoration, as long as they pay. The full package repair is suitable for those who do not have much free time, but it is more expensive than the half pack. So how much does it cost to repair 100 square meters of full packaging? >>>More
1. Discount trap, many people tend to put ** in the prerequisites for choosing a company, but some companies will cut in at a low price, and then add a high amount of items in the later stage. In the early stage, they will hide a lot of non-included items because you don't understand the decoration and deliberately don't mention them to you, and when you sign the contract, they will tell you some items that are not included, such as management fees, taxes, water circuit renovation, etc. >>>More