Serial No. Project Cost or Name Unit Quantity Unit Price (Yuan) Total Price (Yuan) Remark 1 Steel Beam.
TQ235-B2 steel column.
TQ235-B3 Wind Resistant Column.
TQ235-B4 Connecting Plate.
TQ235-B5 purlin plate.
TQ235-B6 Assembling Plate, Climbing Angle.
TQ235-B7 Column Base Plate, Spacer. t
-
Generally, there are no design drawings and no basic parameters as a basis, which is inaccurate. What is the span, what is the eaves height, how big is the area, single-layer board or double-layer board, is there a drive, and how much steel is used? Wait a minute.
Cost is a very scientific work and needs to be based on evidence. This is based on drawings.
-
Steel structure 65kg * 39600 square meters * 6500 tons = 39600 * 10,000 color board.
Gutters, doors and windows, etc. 39,600 * 40 = 10,000.
Total: square meters.
-
First, raw material factors.
Steel and plate is the main component of the steel structure workshop, accounting for about 70%-80% of the total cost of the steel structure workshop, the fluctuation of the steel structure raw material market directly affects the cost of the steel structure workshop. The material of the section steel is very different from the load surface, and the thickness of the enclosure plate is very different from the material. The raw materials of the steel structure are the main factors in the cost of the steel structure workshop.
2. Design factors.
Reasonable design is the fundamental problem of saving raw materials and controlling the cost of steel structure workshop. The different design schemes of the steel structure workshop are an important reason for the change of the quantity and value of raw materials, which directly affects the total cost of the steel structure workshop.
3. Construction and installation factors.
The length of the construction period is also part of the cost of the steel structure workshop, and the proficiency of installation technology is the main reason for the length of the construction period. The construction of structural workshop is a systematic project, involving a wide range of influencing factors, construction period, policy changes, large amount of work, etc. can affect the cost of steel structure workshop.
-
Can you use light steel structure to build a second-story floor on the second floor?
-
The steel structure workshop does not need to be decorated like a villa, so its ** is not high, and it only needs to be simply decorated.
The ** per square meter of the factory is between 600-800 square meters, so it is not too high.
The above ** is provided by: Ruijie Steel Structure Building!
-
Overview: It should be around 750 800 square meters.
The steel structure workshop mainly refers to the main load-bearing components that are composed of steel. Including steel columns, steel beams, steel structure foundations, steel roof trusses (of course, the span of the plant is relatively large, basically now they are steel structure roof trusses), steel roofs, note that the walls of steel structures can also be enclosed by brick walls.
Wind resistance:The steel structure building is light in weight, high in strength, good in overall rigidity and strong in deformation. The dead weight of the building is only one-fifth of that of the brick-concrete structure, which can resist hurricanes of 70 meters per second, so that life and property can be effectively protected.
-
How much is the general cost per square meter of industrial plant with steel structure? Kiss! Hello, glad to answer for you.
The cost of steel structure per square meter is: less than 10 meters, and the general light steel structure is about 600 square meters. 10 meters -12 meters, generally around 750 1000 square meters of cost.
The cost is different depending on the quality, and the labor cost is also different in different regions. The steel structure workshop mainly refers to the main load-bearing components that are composed of steel. Including steel columns, steel beams, steel structure foundations, steel roof trusses (of course, the span of the plant is relatively large, basically now they are steel structure roof trusses), steel roofs, note that the walls of steel structures can also be maintained by brick walls.
Due to the increase in China's steel production, many have begun to use steel structure workshops, which can also be divided into light and heavy steel structure workshops. Industrial and civil construction facilities built with steel are known as steel structures. The characteristics of the steel structure workshop are:
1. The steel structure building is light in weight, high in strength and large in span. 2. The construction period of steel structure building is short, and the investment cost is reduced accordingly. 3. The steel structure building has high fire resistance and strong corrosion resistance.
4. The steel structure building is easy to move and pollution-free. Hope mine can help you! Do you have any other questions?
-
How much is the general cost per square meter of industrial plant with steel structure? Kiss! Hello, glad to answer for you.
The pro-steel structure workshop is made of light steel structure below 10 meters, usually at 600 yuan square meters, and is made of light steel from 10 to 12 meters, usually at 750-1000 yuan square meters. Due to the different steel and labor in various places, there are also certain differences. The cost of a single-story steel structure is usually between 200 and 1,000 square meters, and the specific cost is mainly affected by the design scheme, technology and materials.
The factors affecting the cost of the steel structure workshop are as follows: 1. The material reason is that the steel and plate are the main raw materials of the steel structure workshop, these two materials account for about 70% of the total cost of the steel structure workshop, and the material and thickness of the section steel and the load surface and the enclosure plate are different, and there is also a great difference in the first grade. Therefore, the market of steel and plate will be directly the cost of steel structure workshop.
2. Design factorsThe design factors will also affect the cost of the steel structure workshop to a certain extent, and the design scheme of different steel structure workshops will affect the use of raw materials, which will directly affect the total price of the steel structure workshop. We need to pay attention to the geological report, steel beam design, column network design, increase the material utilization rate, reasonable layout, and save the cost of the steel structure workshop. 3. Construction factors: The long construction period is also an important factor in the cost of the steel structure workshop.
The construction of steel structure workshop is a systematic project, there are many influencing factors, the construction cycle, policy changes, various factors of the amount of engineering will affect the cost of the structural workshop, therefore, there is an efficient and skilled construction team, which can save a lot of time and costs to a certain extent. Hope mine can help you!
Do you have any other questions?
The steel structure is about 430 yuan per square meter.
Steel structure is a structure that is mainly composed of steel materials and is one of the main types of building structures. The structure is mainly composed of steel beams, steel columns, steel trusses and other components made of section steel and steel plates, etc., and the components or components are usually connected by welds, bolts or rivets. Because of its light weight and simple construction, it is widely used in large-scale factories, venues, super high-rise buildings and other fields. >>>More
The cost of steel structure engineering is about 420 yuan per square meter, and the cost of steel structure workshop is mainly related to the following parameters: >>>More
Wooden villa 2000-5000 15 square meters per square meter antiseptic wood about 60 days 100 square meters. >>>More
What's going on? It depends on a lot of factors? The size of the door and window, how much is the area, which brand, how much thickness, etc.! >>>More
Semi-packaged repair per square meter is about 500-800 yuan. Semi-packaged repair refers to a decoration method in which the owner purchases materials by himself and the construction team is responsible for the construction. In this type of decoration, the construction team is responsible for the construction work, including demolition, water and electricity renovation, bricklayering, carpentry, painting, etc., while the procurement of materials is the responsibility of the owner himself. >>>More