-
The cement pipe with an inner diameter of 1.5 meters can be cleaned under the inspection well.
-
The standard practice is that you make it with his model, you need to use grout.
-
Hello friends, the practice of this inspection well is done according to the drawings, it has drawings, the drawings indicate the size of each part, and you can do it according to the drawings, thank you.
-
His approach is that the density between steel and cement should be closely linked to one of its values.
-
The standard practice of a meter inter-grade cement pipe reinforced concrete inspection well, which may be specially regulated, it has strict requirements, and it should be done in accordance with his requirements.
-
The detection of the bending of the reinforcement of the cement pipe you specify is by its internal structure as well as its solidity.
-
One meter diameter cement pipe reinforced concrete inspection well standard practice, you can refer to his tutorial, and then or his design drawing, the design drawings are available, specific instructions and guidance.
-
In the case of the reinforced concrete testing standard manufacturing method of the 1m diameter water conservancy hall, it is determined according to the national standard.
-
If you have to learn this first, you must have learned it first, and you must have a corresponding wireless arc diagram, which is enough.
-
One meter diameter cement pipes, reinforced concrete inspection and standard practices, these are very good, according to the requirements, in order.
-
You can check the standard practices directly with voice management, and this economic national standard professional technical specifications are measured and measured.
-
When you operate reinforced concrete seriously, you must first check the standards in it before doing it.
-
The standard practice of one-meter diameter cement steel tube concrete inspection well, this is through this mold to make the corresponding one**.
-
In the standard measurement process, when it is one meter, we need to do such a two-meter diameter measurement method.
-
One meter diameter cement pipes, reinforced concrete inspection and standard practices are standard practices, it is necessary to check what the rules of some of their specific literature look like.
-
1m diameter cement pipe reinforced concrete inspection well standard practice standard practice is to directly view the cement of the um. Degree of quality.
-
Summary. Generally, the pipeline should extend more than 5 cm above the inner wall of the well.
The inspection well is set up for the maintenance and convenient installation of power supply, water supply, drainage, sewage, communications, cable television, gas pipes, street lamp lines and other maintenance of urban underground infrastructure. Generally, it is located at the intersection of pipelines, turns, changes in pipe diameter or slope, and at certain distances on straight pipe sections, which is convenient for regular inspection of ancillary structures.
The specification for the entry of concrete pipes into the inspection well is a few centimeters.
Generally, the pipeline should extend more than 5 cm from the inner wall of the demolition well. The inspection well is set up for the maintenance of power supply, water supply, drainage, sewage, communications, cable television, gas pipes, draft street lamp lines, etc., and is convenient to install. Generally, it is located at the intersection of pipelines, turns, changes in pipe diameter or slope, and at certain distances on straight pipe sections, which is convenient for regular inspection and inspection of auxiliary structures.
I hope mine can help you and have a great day.
Ask about custom messages].
-
The length of the reinforced concrete pipe entering the inspection well depends on the specific situation, and there are some common regulations that need to be followed.
1.Straight pipeline: The distance from the entrance of the straight pipeline to the top edge of the inspection well (that is, the center distance) should not exceed 15m, and when the length exceeds 15m, an intermediate inspection well should be set.
2.The pipe section where the interface accessories such as elbows and T-shaped pipes are located: the distance between this kind of pipe fittings and the center of the inspection well should not exceed 10m.
3.Horizontal pipeline or pipe section: When this type of pipeline enters the inspection well, the pipeline should extend to the bottom of the inspection well.
It should be noted that these regulations may vary due to factors such as laws and regulations, engineering standards and architectural engineering design in different countries or regions, so in specific use, it is necessary to follow local standards and engineering design requirements.
-
Under the given conditions, the length of the reinforced water mud pipe into the inspection shaft depends on the following factors: the depth of the inspection well, the buried depth of the pipeline and the height of the ground, etc. If the buried depth of the pipeline is deep and the depth of the inspection well is shallow, the length of entering the inspection well is relatively short; Conversely, if the buried depth of the pipeline is shallow and the depth of the inspection well is deep, the length into the inspection well is relatively long.
In addition, it is also necessary to consider factors such as the bending of the pipeline, the direction of the horizontal and vertical directions, etc., to ensure that the length of the pipeline entering the inspection well meets the design requirements. Therefore, the specific length needs to be evaluated and determined according to the actual situation.
-
The trillion-length of the reinforced concrete pipe entering the inspection well should be designed according to the need, and it is usually necessary to ensure that there is still a certain stretch room after the pipeline enters the inspection well, so as to facilitate the free expansion and contraction of the pipeline and avoid problems such as pipeline rupture caused by insufficient degree of freedom of the pipeline. Therefore, the degree of freedom and scalability of the pipeline should be taken into account in the design. In addition, the reinforced cement pipe needs to be strictly measured and cut before entering the inspection orange rock well to ensure that the pipe length is just suitable for the depth of the inspection well, so as to ensure the effective use and stability of the pipeline.
It is important to note that longer pipe lengths, while providing greater freedom and scalability, can also increase cost and engineering difficulty. Therefore, it is necessary to comprehensively consider all factors in the design, balance the needs and constraints of various ethnic groups, and design with the optimal solution.
-
The amount of reinforcement, the main thing is that you have to learn how to calculate is the most important, many netizens ask this question in the know, the calculation is relatively troublesome, and no one can spend a lot of time to calculate it specifically, but you can calculate it yourself if you understand the algorithm, and the diameter and length of the steel bar you want to calculate are indicated on the diagram.
I will send you a formula: the diameter of the steel bar (mm) the diameter of the steel bar (mm) The weight of the steel bar per meter (kg) is an example according to the steel bar in Figure 12 you sent:
It is the weight of 12 steel bars of one meter, the length of specific models, just according to this rule, the following ** is the weight of 1 meter of each steel bar model, you explore it yourself, I want to understand it slowly, I hope to help you and netizens who don't know how to calculate.
Yours is my driving force
-
The formula of the circular area multiplied by the thickness is the calculation formula of the circular well ring with a diameter of 2000mm of 120mm thick C30 concrete. The length multiplied by the width and then multiplied by the thickness is the calculation formula of the square well ring with a thickness of 120mm and a width of 140mm and 110mm respectively.
-
1. Production and acceptance criteria:
Refer to the National Building Standard Design Atlas (05SS521).
2. Raw materials for products:
Cement, aggregate (sand, stone), steel bar, concrete strength ratio: well chamber, wellbore is C30The other parts are C25
3. Process: rotary rolling process. The comprehensive cost is about 10% lower than that of concrete cast-in-situ.
4. Composition of a circular well:
Bottom plate, well chamber, well chamber adjusting block, closing cover plate, wellbore adjusting block, well ring, manhole cover). (7 parts).
5. The composition of the rectangular well:
Downhole chamber, upper well chamber, wellbore adjustment block, well ring, manhole cover. (5 parts).
Remarks: Inspection well 1 meter, meter, meter, specification of the use of closing cover plate received 700, with 700 well section adjustment height rise to the ground, the last section is the well ring, the well ring fixed manhole cover.
6. There are 4 kinds of rainwater and sewage wells
The height of the well chamber is:
1, 700, 1000 well height: 1 meter.
2. 1200 well height: 1 meter, meter.
3. 1500 well height: 1 meter, meter.
Thickness: 700, 1 meter thickness 10 cm. The thickness of the meter is 12 cm, and the thickness of the meter is 15 cm.
-
Theoretically, how big a concrete inspection well can be done, and the general engineering design will have clear requirements, or refer to the national standard atlas.
-
A product specification of a circular concrete inspection well.
1.Concrete well chamber floor
Concrete well chamber *1530, (inner diameter * height) e69da5e6ba9062616964757a686964616f31333332636435
3.Concrete closing cover *7004
Wellbore adjustment block *470 (inner diameter * height).
5.Concrete well ring: 700*260 (inner diameter * height).
2. Product specifications of rectangular inspection wells.
Concrete well chamber *2500*2850;
-
12S522 "Concrete Modular BAI Drainage Inspection Well" is suitable for municipal, industrial and civil buildings, outdoor DAO without internal pressure of circular drainage pipe channel. The rainwater belongs to the pipe diameter d 200 2000mm, the sewage pipe diameter d = 200 1500mm, and the design covering thickness above the inspection manhole cover plate is between. The seismic fortification intensity of the structure is not more than 8 degrees (.
The rectangular well is designed according to the presence of groundwater and the absence of groundwater, and the rest are designed according to the presence of groundwater.
The main contents include: 700 1500mm circular, straight line and 90 ° rectangular concrete modular drainage inspection well selection and construction details; 900 1500mm circular mud well selection and construction details; Rectangular and semicircular vertical groove concrete modular water fall well selection and construction details.
-
Now it's all made of plastic manholes!
-
I don't know what the difference between you are referring to bai?
1. The first material is different. Brickwork zhi
Rainwater inspection wells are mainly made of clay bricks or shale bricks. Concrete rainwater inspection wells are generally divided into reinforced concrete inspection wells and precast concrete modules.
2. The cost is different. Brick rainwater inspection wells are the cheapest; Precast concrete modules are more expensive; Reinforced concrete inspection wells are the most expensive.
3. I think you may be asking about the use, the brick inspection well is covered with soil less than 4 meters in accordance with the requirements of the national standard, and the pipe diameter is less than d2200mm. The same is true for precast concrete modules. The special forms of inspection wells such as large pipe diameter, large buried depth and double row should be considered to use reinforced concrete.
Not sure if these are what you want to know.
-
1. The strength grade of structural concrete must meet the design requirements. Specimens used to check the concrete strength of structural components should be randomly selected at the place where the concrete is poured. Sampling and specimen retention shall comply with the following provisions:
1) For every 100 trays of concrete with the same mix ratio of no more than 100m3, sampling shall not be less than once;
2) When the concrete of the same mix ratio is less than 100 trays mixed in each working shift, sampling shall not be less than once;
3) When a continuous pouring exceeds 1000m3, the concrete of the same mix ratio is sampled not less than once every 200m3;
4) For each floor and the concrete of the same mixture, sampling shall not be less than once;
5) At least one group of standard curing specimens should be retained for each sampling, and the number of retention groups for curing specimens under the same conditions should be determined according to actual needs.
Inspection method: check the construction record and the test report of the strength of the specimen.
2. For concrete structures with impermeability requirements, the concrete specimens should be randomly sampled at the pouring site. For the same project and the same mix ratio of concrete, sampling should not be less than once, and the number of retention groups can be determined according to actual needs.
Test method: check the impermeability test report of the specimen.
2) General items.
1. The retention position of the post-pouring belt should be determined according to the design requirements and the construction technical plan. The concrete pouring of the post-pouring belt should be carried out according to the construction technical plan. The supervising engineer shall inspect all of them.
Inspection method: Observe and check the construction records.
2. After the concrete is poured, effective maintenance measures should be taken in a timely manner according to the construction technical plan, and the following provisions should be met:
1) The concrete should be covered and moisturized within 12h after pouring;
2) Concrete watering and curing time: for the concrete mixed with Portland cement, ordinary Portland cement or slag Portland cement, it shall not be less than 7d, and for the concrete mixed with retarder type admixture or impermeability requirements, it shall not be less than 14d;
3) The number of watering should be able to keep the concrete in a wet state; The water used for concrete curing should be the same as that used for mixing;
4) The concrete covered with plastic sheeting should be covered tightly, and the condensate should be kept in the plastic sheeting;
5) before the concrete strength is reached, shall not step on it or install formwork and support. Remarks:
1. When the average temperature of the day is lower than 5, no watering is allowed;
2. When the concrete surface is inconvenient to water or use plastic sheets, it is advisable to apply curing agent;
3. For the maintenance of large-area concrete, temperature control measures should be taken according to the climatic conditions according to the construction technical plan.
Number of inspections: All inspections.
Inspection method: Observation, check the construction record.
-
Inspection wells are used in the construction area (residential areas, public building areas, factories, etc.) within the scope of the buried plastic drainage pipe outer diameter is not more than 800mm, buried depth is not more than 6m, generally located at the drainage pipe intersection, turn, pipe diameter or slope change, water fall, etc., in order to facilitate regular inspection, cleaning and dredging or down the well operation inspection with plastic integrated injection molding or brick well-shaped structure.
The inspection well is composed of a well seat, a wellbore, a manhole cover and related accessories, etc., and is used to clear and inspect the well-shaped structure.
The types are: A, B, C, D, and E.
A, B, C, D, and E inspection wells are mainly distinguished by depth: 6m in the inspection wells: 6m in the inspection wells: A type well, B type well, C type well, D type well, and E type well.
Type A inspection well: suitable for pipe inner diameter d=200 500mm, h 1400mm, h is the distance between the ground and the bottom of the large pipe.
Type B inspection well: suitable for pipe inner diameter d=200 500mm, 1400mm h 6000mm; The inner diameter of the tube is d=600mm, and the h6000mm.
Type C inspection well: suitable for pipe inner diameter d=700 800mm, h 6000mm.
D-type inspection well: suitable for pipe inner diameter d=900 1500mm, h 8000mm.
There are two types of plane shapes: round and square.
Weight per meter (kg) Diameter of rebar (mm) Diameter of rebar (mm) , 18mm rebar weight is.
Here are some of the well-known brands recognized in the valve industry, which are widely recognized and have a high reputation. While rankings may vary depending on time and market conditions, the following brands are generally considered to be among the top brands in the valve industry: >>>More
Hollow grouting bolts are suitable for medium geological conditions, permanent support and advance support. The pressure grouting of the anchor rod through the hollow rod body can achieve the purpose of consolidating and breaking the rock mass, isolating the groundwater and anti-corrosion of the rod body, and can quickly form a supporting force to control the stability of the surrounding rock. Hollow grouting bolts are suitable for railways, highways, tunnels, mines, water conservancy hubs, slopes, embankments, bridge foundations, rivers, seas, lakes, and high-rise buildings. >>>More
KBG pipe, also known as national standard crimp conduit, KBG series steel conduit is made of high-quality thin-walled plate, double-sided cold galvanized all-round 360° protection. >>>More
One hundred and fifty kilograms per square meter. >>>More