Monitor how to write the construction project quotation and how to calculate the construction cost o

Updated on society 2024-08-06
6 answers
  1. Anonymous users2024-02-15

    I recommend a **platform** to you: a party project**, enter simple requirements, the system automatically analyzes, generates professional**, and can also one-click ** contracts and plans. Go and search for [Party Project**] for yourself!

  2. Anonymous users2024-02-14

    Tender letter and appendix to tender letter.

    a) Tender letter.

    Name of the tendering unit:

    1 We have carefully studied all the contents of the bidding documents for the bidding project of x x x, and are willing to bid for a total of RMB (capitalized) (8,080,000,000 yuan), with a construction period of 242 calendar days, to implement and complete the contracted project according to the contract, repair any defects in the project, and the quality of the project is qualified.

    2. We promise not to supplement, modify, replace or withdraw the tender documents during the validity period of the bid.

    3. Submit a bid bond with this tender letter, the amount of which is RMB (capitalized) Wu 10,000 yuan (50,000 yuan).

    4 If we win the bid:

    1) We promise to sign a contract with you within the time limit specified in the notice of winning the bid after receiving the notice of winning the bid.

    2) The appendix to the tender letter submitted with this tender letter is an integral part of the contract documents.

    3) We promise to submit a performance guarantee to you in accordance with the provisions of the bidding documents.

    4) We promise to complete and hand over all the contract works within the time limit agreed in the contract.

    5. We hereby declare that the submitted bidding documents and related information are complete, true and accurate, and there is no any of the circumstances specified in Chapter 2 "Instructions to Bidders".

    6. We fully understand that you do not guarantee that the bidder with the lowest bid price will win the bid.

    Bidder:

    Legal representative or his delegate ** person:

    Address: Web:

    Telephone: Postal code: 111300

    August 10, 2014.

    This is Fan Wen to write according to this.

  3. Anonymous users2024-02-13

    1. Calculation of monitoring engineering:

    The bill of quantities is the construction project bidding work, provided by the tenderer according to the national unified engineering quantity calculation rules, by the bidder independently, and in accordance with the evaluation of the low price of the project cost pricing model. The guiding principles of the bill of quantities are: macro-control, enterprise autonomy, market formation, and comprehensive social supervision.

    2. Calculation of project construction cost:

    1) Estimation method of unit construction project investment. It is a method of estimating the construction cost by multiplying the investment per unit of construction work by the total amount of construction work. General industrial and civil buildings are invested in units of construction area (square meters);

    Industrial kiln masonry is invested in unit volume (cubic meters), reservoirs are invested in dam units (meters), railway roadbeds are invested in unit length (kilometers), and mine tunneling is invested in unit length (meters), multiplied by the corresponding total amount of construction projects to calculate the construction project cost.

    2) Estimation method of investment per unit of physical engineering quantity. It is a method of estimating the construction cost by multiplying the investment per unit of physical engineering quantity by the total amount of physical engineering. The earthwork project is invested per cubic meter, the mine roadway lining project is invested per Honghuai extension meter, and the pavement paving project is invested per square meter, multiplied by the total amount of the corresponding physical engineering quantity to calculate the construction project cost.

    3) Budget estimation index investment estimation method. When estimating the construction cost, for projects that do not have the above-mentioned estimation indicators, or the construction cost accounts for a large proportion of the construction investment, the budget estimation index estimation method can be adopted. The budget estimation index of construction project is usually based on the entire building, and the construction area, volume, etc. are used as the unit of measurement to determine the consumption standards and cost indicators of labor, materials and machinery shifts.

    The budget estimation indicators of construction projects include general civil engineering budget estimation indicators, water supply and drainage engineering budget estimation indicators, heating engineering budget estimation indicators, communication engineering budget estimation indicators, electrical lighting engineering budget estimation indicators, etc. The use of budget estimation index investment estimation method, it is necessary to occupy more detailed engineering data, building materials and project cost indicators, and the workload is large. The specific methodology is based on the method for the preparation of budget estimates issued by the specialized agencies.

  4. Anonymous users2024-02-12

    1. Equipment**.

    Generally based on the market retail price.

    2. Accessories**.

    It is also based on the market retail price.

    Special products (e.g. vertical rods) can be on the high side.

    3. Consumables**.

    Consumables** can be higher than the retail price.

    4. Installation fee.

    Regular households are calculated at 100-200 yuan.

    Ordinary factories are calculated at 150-300 yuan.

    Factories with relatively high installation locations.

    Or if it is far away, you can estimate it yourself.

  5. Anonymous users2024-02-11

    Monitoring construction fees account for 8% of the entire project price**The lower the more professional.

  6. Anonymous users2024-02-10

    See Annex 1 (Summary Table of Works**) for details

    Contract amount: 65,000 yuan, of which 10,000 yuan is the construction cost. 55000 is the equipment money (55000+10000 yuan).

    Note: In the total amount of the project, the total amount of the winning project is 65,000 yuan.

Related questions
11 answers2024-08-06

1. Introduction to the project.

2. Project cost. >>>More

4 answers2024-08-06

"More dangerous divisionsSub-projectsThe meaning is as follows: >>>More

13 answers2024-08-06

The construction plan follows the steps below:

Divide the construction process. >>>More

6 answers2024-08-06

CCTV monitoring system is a cross-industry comprehensive security system, the system uses the world's most advanced sensing technology, surveillance camera technology, communication technology and computer technology, forming a multi-functional all-round monitoring of the highly intelligent processing system. CCTV monitoring system because it can give people the most direct visual and auditory experience, as well as the visibility, real-time and objective recording of the monitored object. >>>More