-
The construction plan follows the steps below:
Divide the construction process.
2.Calculate the workload.
3.Determine the amount of labor and the number of machine shifts.
4.Determine the duration of construction (days or weeks) for each construction process5Preparation of the initial scheme of the construction schedule.
6.Review and adjust the initial plan of the construction schedule.
The principle of compiling the construction schedule is: proceeding from reality, paying attention to the continuity and balance of construction; According to the requirements of the construction period stipulated in the contract, we should seek speed in the good and improve the completion rate; Pay attention to comprehensive economic effects.
The preparation of the construction schedule is carried out according to the network planning method of the assembly operation principle. Pipeline operation is a scientific production organization method formed on the basis of division of labor and cooperation and mass production. In this way, the continuity of the work of each construction team is ensured, and the latter process can be inserted into the construction in advance, the space is fully utilized, the time is won again, the construction period is shortened, and the construction can be carried out quickly and stably.
The use of network planning method to compile the construction schedule can link the entire construction process to form an organic whole, reflecting the process and organizational connection of various works (projects or processes), and can provide various useful management information for managers.
-
According to the on-site construction conditions, the workload is planned to be completed in the year and the workload to be completed in the month. Resource deployment and funding deployment. Personnel and machinery arrangement.
-
First of all, it is necessary to have a specific understanding of the project, and if there is a budget for the amount of work, it is best to arrange the plan according to the fixed number of working days, if not, only based on years of experience to formulate.
-
If this requirement is not strict, it will take a bar chart, and if the requirement is strict, draw a network chart. It's simple.
-
Writing ideas: According to the needs of the project, first write what the content of the project includes, then write the work plan, that is, what task needs to be completed, and finally write the safety details and so on.
Text: 1. Project content: digging piles, foundation beams, trench pit earth and stone excavation, cast-in-place concrete, brick masonry and plastering, making and binding of steel bars such as stairs, floors, beams, etc., cast-in-place concrete, ground leveling and concrete cushioning.
2. Work plan:
1. After the main steel column of the decoration project is hoisted in place, the ground beam steel bar binding is carried out, and the ground beam concrete is poured at the same time. The reinforcement binding is completed within four days.
2. After the completion of the foundation beam, the brick project will be started, and the masonry will be completed within 2 days.
3. After the completion of the brick body, the stairs, floors, beams, etc. will be erected, and the formwork will be completed in four days.
4. After the completion of the formwork, the beam and plate steel bar binding will be carried out, and it will be completed in 2 days.
5. The reinforcement project is completed and the staircase and floor concrete are poured and completed in 4 days.
6. The stairs and floor slabs are poured in situ, that is, the foreign surface is plastered, and the ground is leveled, the concrete cushion is poured, and the frame is dismantled. It is expected to be completed in 7 days.
7. The total time of the above work is 25 days.
3. Safety, fire prevention and civilized construction
1. Set up commissioner safety personnel on site, strengthen safety and fire prevention education for workers, and wear safety helmets at work.
2. Flammable substances are stacked in a centralized manner, kept by a special person, and clearly marked are set, and smoking is strictly prohibited in the place where flammable substances are stacked.
3. On-site construction equipment, power lines and other special personnel will inspect and maintain on-site materials, and classify and stack them neatly.
4. In order to prevent weather changes, all the facilities required for rain prevention should be done in advance to ensure the smooth and timely completion of the project.
-
The construction schedule is the key content of the construction organization design, and is the basis for controlling the construction progress of the project and the construction period of the project. Therefore, all the work of the construction organization design should be arranged with the construction schedule as the center.
1.The basic situation of the construction (content, completion period, meeting requirements, and the construction task unit issued).
2.Construction plan. First, there are several stages of construction: assign tasks and clarify responsibilities; The second is to draw up the construction schedule, the responsible person, and make several plans in the face of possible situations.
3.Safeguards. According to the project situation, put forward certain requirements to the superiors, so as to ensure the smooth completion of the construction.
The construction progress record is in the form of a daily construction report, which is completed on a daily basis by the resident project representative or, if effective, by the contractor's quality control representative, even if construction does not start on a certain day on the construction site. The report is usually made in multiple copies or printed directly on carbon paper to produce the required copies.
-
The construction plan shall indicate the construction content; deadlines for completion; meet the requirements; Issuing construction task units; the person responsible for the construction; Construction expenses and personnel plan: budget for required funds; Budgets for staffing requirements; Multiple scenarios for what may happen.
[Legal basis].Article 794 of the Civil Code.
The content of the survey and design contract generally includes the time limit for submitting relevant basic information and budget estimates, quality requirements, costs and other cooperation conditions.
Article 795.
The content of the construction contract generally includes the scope of the project, the construction period, the start and completion time of the intermediate delivery project, the quality of the project, the cost of the project, the delivery time of technical data, the responsibility of materials and equipment, the appropriation and settlement, the completion acceptance, the scope of the quality warranty and the quality assurance period, mutual cooperation and other terms.
-
Sample Proposal: The best introductory guide when writing a proposal.
-
With Gantt charts or lists, we often use the form of an outline, so that it is clear and easy to understand1Title or project name. 2.
Construction steps (according to the strict construction sequence, the entry time and quantity of each type of work, and the overall time to be completed). 3.The process arrangement should be reasonable, not overworked, and the key points of difficulty should be clear.
-
The project plan should first indicate the name of the specific project, the date of preparation, and then make a general description of the project, which should include the location of the project, the characteristics and difficulties of the project and the possible problems of the first phase of construction.
After that, it is necessary to establish the objectives and management ideas of the project implementation, including the overall goal of the project, the annual goal, the first phase goal, the second phase goal, etc.
Then it is necessary to establish the organizational structure and management principles of the project. It should include the organizational structure of the headquarters, the organizational chart, the job occupation and job responsibilities, and the staffing situation.
Furthermore, it is necessary to determine the project schedule. Specify the general project schedule, the project schedule of each unit, the sub-project schedule, etc.
-
Construction organization design. Preparations, mechanical personnel, main processes, measures.
-
1. Construction period target:
The construction unit of the project.
Required to be completed before July 15, 2016, the company in the spirit of user first, think about what users think, anxious about what users are anxious about, will be carefully organized in the construction process, scientific management and according to our company's rich experience in building this kind of project to ensure that all the construction tasks specified in the construction contract are completed within the specified 263 calendar days, and submit a satisfactory building product for the construction unit!
2. Determination of the overall schedule:
According to the main sub-project project.
The construction period is planned and arranged in accordance with the construction of the project.
organization and logical relationship to determine the overall construction schedule of the project.
3. The specific quantity of this project:
The backfill time of the soil surface area, the preparation of the required schedule, the preparation of labor, main materials, machinery and equipment resource requirements plan according to the time schedule, the preparation of schedule control measures.
-
Hello, the question received by the teacher is: how to write the construction plan: the method of writing the construction plan is:
According to the current experience of the advanced martial arts colleges and universities in China, the school system (including day school) management action mode is adopted, and a number of courses are offered from kindergarten to primary school, middle school, high school and university, including regular and cultural courses and characteristic educational content such as art, medicine and medicine, so as to provide a high-standard large-scale learning and practice base for the development of traditional kung fu, medicine, pharmacy, and cultural heritage management in China. Enthusiasts from all over the world are welcome to come here to learn and communicate. Make progress together, work together to bury the industry, and develop together.
If you don't know how to prepare a construction plan at all, then the above ** is completely useless to you. Learn how to prepare a construction plan first. This is not something that can be explained in a sentence or two.
The main terms of the construction contract, also known as the construction and installation contract, are: (1) the name and location of the construction project; (2) the scope and content of the construction project; (3) The date of commencement and completion of the construction of the construction project and the date of commencement and completion of the intermediate delivery project; (4) The quality warranty period and warranty conditions of the construction project of the construction project; (5) the cost of the construction project; (6) Methods for payment, settlement and acceptance of the construction price of construction projects; (7) The date on which the construction design documents and estimates, budgets and technical data of the construction projects are provided; (8) Construction materials and equipment for construction projects and the deadline for entering the site; (9) Matters of mutual cooperation between the two parties; (10) Liability for breach of contract in the construction of construction projects.
To be clear, civil engineering construction includes high-rise building construction, if you have not studied both, you can first go to school civil engineering, because you do not necessarily do high-rise building construction after graduation, even if you use it for self-study later. >>>More
Winter Vacation Program. Before you know it, the winter holidays are quietly coming. I have a lot to do this winter break. >>>More
The first type of construction contract is a type of contract, including general contract and subcontract; the second is the pricing method contract, including the fixed total price contract and the measurement contract; There are also bill of quantities contracts, unit price list contracts, and process stage contracts; It also includes survey contracts, design contracts and engineering contracts. >>>More