How to deal with the floor paint floor, how to deal with the paint on the floor paint

Updated on home 2024-08-03
7 answers
  1. Anonymous users2024-02-15

    Need.

    in the brush floor paint.

    Before the ground treatment must be done, because if there is dust or sand particles on the ground is not completely removed, it is easy to cause pitting in the floor paint coating, resulting in the appearance of the entire floor paint coating being affected, such as unevenness, pits, pores, etc. Therefore, if there is a stain on the ground itself, it is recommended that the construction should not be carried out. When the ground is in a flat state, a smooth, flat floor paint coating can be applied.

    Before using floor paint, it is necessary to clean the construction area so that the floor paint can fully stick to the ground. If the gap on the surface of the floor itself is very uniform, there will be a large number of gaps and small holes in some areas, which will affect the construction effect of the floor paint. In order to make it stronger, a certain amount of diluent is added.

    Allowing it to penetrate into the inner layers of the ground increases impermeability.

    First, refine the surface of the floor to make the surface smooth and airtight, and prepare for the spraying of the middle layer of paint.

    The middle layer is polished to the model, and epoxy floor paint is applied, and the middle layer can be sprayed with floor paint by high-pressure spraying, which can make the surface smoother.

    The upper layer is to make the ground more durable, and it is sanded and cleaned before spraying, and then sprayed by high-pressure airless spraying.

  2. Anonymous users2024-02-14

    First, the ground is treated with cement, the cement floor is sanded and leveled, and the floor paint is brushed.

  3. Anonymous users2024-02-13

    Summary. Hello dear, you can use Tianna water to clean. If it is completely adhered to the epoxy floor, a small area can be partially repaired, and if the area is large, it is recommended to reapply the topcoat once.

    How to deal with paint on the floor paint.

    Hello dear, you can use Tianna water to clean. If it is completely adhered to the epoxy floor, a small area can be partially repaired, and if the area is large, it is recommended to reapply the topcoat once.

    1.Gasoline wiping If you are worried about damaging the ground, then you can choose gasoline, it is very easy to remove the ground paint, and ensure that the ground will not be damaged a little, just use a rag dipped in some gasoline to wipe the ground paint. 2.

    Rosin perfume can dissolve paint very quickly, so when there is paint on the ground, choose some rosin perfume to pour on the ground paint and wipe it clean, remember to wear gloves, because rosin perfume is corrosive and toxic. 3.Shovel it off.

  4. Anonymous users2024-02-12

    To make floor paint, the ground must be cleaned first. Next, the curing agent and the primer should be mixed evenly, and after the color is unified, it can be applied to the ground with an upper roller, and the thickness must be consistent. Wait 5 to 6 hours for it to dry completely before you start applying the topcoat.

    After the first application of the topcoat, you need to wait 8 to 9 hours before applying the second topcoat after it has dried thoroughly.

    Before construction, it is necessary to check the flatness of the ground, which needs to be measured with a ruler of 2 meters, and the gap difference should be recorded. Generally speaking, the maintenance time in summer is about 7 days, and about 10 days in winter, in order to prevent the later sanding phenomenon, but also to check the concrete situation, the strength is poor, but also to use vacuuming and then primer, so as to increase the degree of tightness.

    During construction, the material ratio should also be accurate, and after the construction of each coating, the quality should be checked, and the problem should be dealt with in a timely manner, and the next process can only be done after the surface layer is dry. In this way, the construction environment can be protected and the cured coating can be prevented from getting dirty.

    After the construction of the floor paint coating, the construction of the work and materials must be cleared from the site, and can not walk around on it within 24 hours, only a week later can be used, but also regularly check the surface of the coating, can not destroy it, pay attention to maintenance and maintenance.

  5. Anonymous users2024-02-11

    The construction method of water-based floor paint is as follows:

    1. Clean the ground

    The first step is to carry out an inspection of the ground to be constructed. Especially for inspections between harsh grounds. Clean up some dirt, garbage, and dust on the ground, and keep the ground dry at the same time, which means that there can be no water on the ground.

    2. Apply primer

    The first step in any paint application is to apply a primer, and water-based floor paint is no exception. Stir the main agent evenly and then add the curing agent, pour the main agent slowly when pouring, in the process of pouring, to stir constantly, be sure to let it mix evenly, and then add one-fifth of the water to stir quickly, dilute to the appropriate construction viscosity. Finally, stir slowly until evenly brushed.

    When brushing the primer, make sure that the size and thickness are consistent, and there should be no missing brushes.

    3. Paint the topcoat

    After the primer is brushed, the water-based floor paint topcoat is brushed, and the brushing method is similar to the primer. It's just that you need to brush the topcoat twice, and the first time after stirring well. After brushing, it should be cured for 12 to 24 hours before applying it a second time.

    After the completion of the second time, it will be cured for 24 hours before it can be mastered, and if the temperature is relatively low in winter, the maintenance time should be appropriately extended.

    Precautions for the construction of water-based floor paint:

    1. Paint water-based floor paint, and pay attention to the temperature, that is, the temperature cannot be lower than 10 degrees. In addition, the humidity requirement is between 50% and 80%.

    2. When the paint is stirred, the amount of water added must not exceed one-fifth, because adding too much water will cause the performance of the paint film to decrease, such as hardness, gloss and so on will be weakened.

  6. Anonymous users2024-02-10

    Floor paint application steps.

    1. Before the construction of epoxy flooring, it is necessary to keep the moisture content of the base layer not higher than 5%, the flatness with a 2m ruler error of no more than 4mm, the ground strength not less than C25, and clean the ground. Absolute drying of the base surface is required before the construction of epoxy flooring.

    2. Then to meet these requirements, we can directly come to the construction, after the construction of various floor paints are opened, please mix according to the ratio, stir evenly, and try to use up the floor paint after cutting 15-30 minutes.

    3. Pay attention to the handling of drum hair during construction, if it falls in the floor paint, pick it out with a batch knife when rolling it, it is recommended to buy a better roller, and the roller required for the construction of different floor paint is not the same.

    4. Attention should be paid to circumvention within 12 hours after the topcoat is rolled to keep the epoxy topcoat dry. After 24 hours, people can leave, forklifts, etc., need to wait 72 hours before they can be used on the ground.

    Treatment of the surface of the floor:

    1. The newly completed industrial floor must be maintained before construction, about 28 days.

    2. Remove the cement slurry, old paint and adhered garbage and debris on the surface.

    3. Thoroughly remove the oil stain on the surface and treat it with cleaning agent.

    4. Remove stagnant water and dry the tide thoroughly.

    5. The cleaning of the surface needs to be completed by a dust-free sweeper and a large vacuum cleaner.

    6. The allowable void of the flat surface is 2, the water content is below 6%, and the pH value is 6 80.

    7. The hairing of the floor surface needs to be completed with a dust-free grinder and thoroughly cleaned with a vacuum cleaner.

    For the construction of floor paint, each step is interlocking, and the details need to be taken care of in place.

  7. Anonymous users2024-02-09

    The floor paint construction method is as follows:1. The selection of time and the cleaning of the floor surface.

    2. Spray epoxy sealing primer on the surface of the floor.

    3. The configuration of floor paint.

    4. The lower layer is the first layer, which is mainly a refinement treatment of the floor surface, which is to make the surface more flat and sealed, and prepare for spraying the floor paint in the middle layer.

    5. After the construction of the lower layer is completed, it is necessary to polish the model and clean it, and then apply a layer of epoxy floor paint, which can be sprayed with floor paint in the middle layer by using the method of high Qi slow bucket pressure spraying, the main purpose of which is to make the surface more flat.

    6. The upper layer is the last process, and it is also the first layer of the ground, which is directly in contact with the high grinders, so in order to make the ground more durable, it is necessary to polish and clean the surface of the middle layer again before spraying, and then use the high-pressure airless spraying method to carry out the last spraying.

Related questions
11 answers2024-08-03

1. Plain land treatment: the cement plain ground must be thoroughly dried, the ground must not be oiled, the ground cannot be cleaned with water, and the grinding, repairing and dust removal work should be done according to the condition of the plain land; >>>More

6 answers2024-08-03

Generally speaking, the topcoat of floor paint with a thickness of less than the thickness of the paint film is called a thin-painted floor topcoat by spraying, roller coating or brushing. Thin-coated epoxy floor paint is generally suitable for purified cement floors, such as factory buildings, hospitals, pharmaceuticals, warehouses, offices, laboratories, data rooms, basements, etc.

12 answers2024-08-03

The business of Beijing Katuo Construction Engineering is widely distributed in residential, automobile manufacturing, machinery, chemical industry, electronics, medicine, tobacco, papermaking, education, printing, food, supermarkets and other industries, and constantly provides perfect system solutions that meet the needs of these industries. Looking forward to hearing from you!

11 answers2024-08-03

The business of Beijing Katuo Construction Engineering is widely distributed in residential, automobile manufacturing, machinery, chemical industry, electronics, medicine, tobacco, papermaking, education, printing, food, supermarkets and other industries, and constantly provides perfect system solutions that meet the needs of these industries. Looking forward to hearing from you!

18 answers2024-08-03

With excellent acid and alkali resistance and wear resistance, epoxy floor paint is widely used in the floor decoration of various places such as various mechanical processing plants and product warehouses. The quality of floor paint can be judged from the following aspects:1 >>>More