How to use floor paint for the best effect, how to use floor paint

Updated on society 2024-05-14
11 answers
  1. Anonymous users2024-02-10

    The business of Beijing Katuo Construction Engineering is widely distributed in residential, automobile manufacturing, machinery, chemical industry, electronics, medicine, tobacco, papermaking, education, printing, food, supermarkets and other industries, and constantly provides perfect system solutions that meet the needs of these industries. Looking forward to hearing from you!

  2. Anonymous users2024-02-09

    Brush the floor paint according to the normal proportion, and pay attention to the maintenance of the floor paint construction.

  3. Anonymous users2024-02-08

    Summary. Dear, hello, the use of floor paint is as follows: 1. First polish the ground to ensure that it is flat, then remove the dust, and then apply an epoxy bottom on the outer layer after treatment, and the paint needs to be balanced.

    2. This can improve the adhesion of the outer layer, and after the outer layer is dry, you can apply epoxy mortar to the outer layer to ensure that it is completely dry, and then continue to apply epoxy putty on it, and then polish. 3. After treatment, apply epoxy topcoat on the outer layer, which must be applied twice during construction, and can only be painted a second time after the first time is thoroughly dried, so as to ensure that the surface color is balanced. 4. Finally, it is necessary to maintain thalassemia, and ensure that the maintenance time can not be less than 24 hours, and its temperature can be controlled at about 25 degrees.

    Good. Dear, hello, the use of floor paint is as follows: 1. First polish the ground to ensure that it is flat, then remove the dust, and then apply an epoxy bottom on the outer layer after treatment, and the paint needs to be balanced.

    2. This can improve the adhesion of the outer layer, and after the outer layer is dry, you can apply epoxy mortar to the outer layer to ensure that it is completely dry, and then continue to apply epoxy putty on it, and then polish. 3. After treatment, apply epoxy topcoat on the outer layer, which must be applied twice during construction, and can only be painted a second time after the first time is thoroughly dried, so as to ensure that the surface color is balanced. 4. Finally, it is necessary to maintain thalassemia, and ensure that the maintenance time can not be less than 24 hours, and its temperature can be controlled at about 25 degrees.

  4. Anonymous users2024-02-07

    The usage of floor paint is: blending the floor paint, priming whitewash, painting the middle part of the floor paint, and painting the surface layer on the surface.

    Mix the floor paint first, because you can't use the epoxy floor paint directly after you buy it, you have to stir it up before you can apply it to the ground. The floor paint is then applied to the bottom layer, which we call primer painting. It is necessary to paint the floor paint in the middle layer.

    Do epoxy flooring paint on the surface of the surface part of the painting.

    Steps to follow when applying floor coatings:

    The first step is the treatment work on the basic ground, such as the ground needs to be brushed, sanded, cleaned, brushed, and rinsed.

    The second step is to start the base paint, which is to do the first layer of permeable floor paint on the ground.

    The third step is to wait for a few hours in the middle, and then start to do part of the construction of the middle wall after it is completely dry, generally the material used in the middle part is quartz sand, and you can also directly make it into floor paint construction.

    The fourth step is grinding, because after the construction of the first and second layers is completed, it needs to go through a hardening process, and after hardening, there will be obvious thickening on the surface, so it must be polished again, and then the next process can be taken.

    The fifth step is to do the topcoat treatment, which is the most superficial layer of the floor paint we see.

    The sixth step is still sanding, because after all the work is done, the overall sanding and cleaning is also an essential workflow.

  5. Anonymous users2024-02-06

    Summary. 1.First of all, a refinement treatment is carried out on the place where the floor paint needs to be brushed, in order to make the surface more flat and sealed, and prepare for the spraying of the middle layer of floor paint.

    2. After the construction of the lower layer is completed, it is necessary to polish and clean the model, and then apply a layer of epoxy floor paint.

    3. The middle layer can be sprayed with floor paint by high-pressure spraying, and the main purpose of this is to make the surface smoother.

    4. The upper layer is the last process, and it is also the first layer of the ground, which is in direct contact with people, so in order to make the ground more durable, the surface of the middle layer needs to be polished and cleaned again before spraying, and then the last spraying is carried out by using the high-pressure airless spraying method.

    How to use floor paint?

    Hello dear dear, happy to answer for you:1First of all, a refinement treatment is carried out on the place where the floor paint needs to be brushed, in order to make the surface more flat and sealed, and prepare for the spraying of the middle layer of floor paint.

    2. After the construction of the lower layer is completed, it is necessary to polish and clean the model, and then apply a layer of epoxy floor paint. 3. The middle layer can be sprayed with floor paint by high-pressure spraying, and the main purpose of this is to make the surface smoother. 4. The upper layer is the last process, and it is also the first layer of the ground, which is in direct contact with people, so in order to make the ground more durable, the surface of the middle layer needs to be polished and cleaned again before spraying, and then the last spraying is carried out by using the high-pressure airless spraying method.

    Hello dear dear, happy to answer for you:1First of all, a refinement treatment is carried out on the place where the floor paint needs to be brushed, in order to make the surface more flat and sealed, and prepare for the spraying of the middle layer of floor paint.

    2. After the construction of the lower layer is completed, it is necessary to polish and clean the model, and then apply a layer of epoxy floor paint. 3. The middle layer can be sprayed with floor paint by high-pressure spraying, and the main purpose of this is to make the surface smoother. 4. The upper layer is the last process, and it is also the first layer of the ground, which is in direct contact with people, so in order to make the ground more durable, the surface of the middle layer needs to be polished and cleaned again before spraying, and then the last spraying is carried out by using the high-pressure airless spraying method.

  6. Anonymous users2024-02-05

    To make floor paint, the ground must be cleaned first. Next, the curing agent and the primer should be mixed evenly, and after the color is unified, it can be applied to the ground with an upper roller, and the thickness must be consistent. Wait 5 to 6 hours for it to dry completely before you start applying the topcoat.

    After the first application of the topcoat, you need to wait 8 to 9 hours before applying the second topcoat after it has dried thoroughly.

    Before construction, it is necessary to check the flatness of the ground, which needs to be measured with a ruler of 2 meters, and the gap difference should be recorded. Generally speaking, the maintenance time in summer is about 7 days, and about 10 days in winter, in order to prevent the later sanding phenomenon, but also to check the concrete situation, the strength is poor, but also to use vacuuming and then primer, so as to increase the degree of tightness.

    During construction, the material ratio should also be accurate, and after the construction of each coating, the quality should be checked, and the problem should be dealt with in a timely manner, and the next process can only be done after the surface layer is dry. In this way, the construction environment can be protected and the cured coating can be prevented from getting dirty.

    After the construction of the floor paint coating, the construction of the work and materials must be cleared from the site, and can not walk around on it within 24 hours, only a week later can be used, but also regularly check the surface of the coating, can not destroy it, pay attention to maintenance and maintenance.

  7. Anonymous users2024-02-04

    1. The newly completed floor must be maintained for 28 days before construction.

    2. Grinding and cleaning site: use a water mill to lightly polish the whole site, scrub the ground with water and a hard broom, and the dust and dirt on the surface must be brushed and rinsed and cooled dry.

    3. Use a closed primer to roll coat the primer (depending on the oil absorption of the cement base surface) to strengthen the base surface, seal the capillary pores of the cement layer, and enhance the adhesion of the surface; When using floor paint, you can also apply the floor without primer.

    4. Add an appropriate amount of quartz sand or color chips to the paint of the floor paint, and evenly apply the base with a trowel to enhance the pressure resistance, impact resistance and anti-slip effect of the ground.

    5. Roll the prepared floor paint on the putty layer to make the ground dustproof and waterproof, wear-resistant, corrosion-resistant and easy to clean with the same color, and the overall ground color is uniform after completion, without hollowing.

    6. Brush the floor paint twice to enhance the hardness, wear-resistant strength and glossy bottom of the paint surface.

    7. Construction completion: 24 hours before you can go to the person, 72 hours after the heavy pressure. (25 shall prevail, and the opening hours of low temperature shall be moderately extended).

  8. Anonymous users2024-02-03

    1. Basic treatment: use a grinder to polish the ground and clean and vacuum.

    3. Batch leveling putty layer: batch twice leveling putty layer to better fill the ground.

    4. Rolling paint layer: After the material is stirred evenly, the wear-resistant topcoat layer is evenly coated twice with paulownia.

    5. It can be put into use normally one week after the completion of maintenance.

    A certain amount of volatile organic compounds (VOCs) will be emitted during construction and curing, but the cost is relatively low; The solvent-free epoxy floor coating is environmentally friendly and has no volatile organic compound emissions. It is widely used in the finishing of modern industrial floors.

  9. Anonymous users2024-02-02

    Floor paint is mainly made of oil, tree material, color, solvent, etc., and is widely used in decoration. What do you know about the construction methods of floor paint? Let's take a look!

    1. The newly completed industrial floor must be maintained before construction, about 28 days. 2. Remove the cement slurry, old paint and adhered garbage and debris on the surface. 3. Completely remove the oil stain on the surface and treat it with the cleaning agent of Keyouwang.

    4. Remove stagnant water and dry the tide thoroughly. 5. The cleaning of the surface needs to be completed by a dust-free sweeper and a large vacuum cleaner. 6. The allowable void of the flat surface is 2, the water content is below 6, and the pH value is 6 80.

    7. The hairing of the floor surface needs to be completed with a dust-free grinder and thoroughly cleaned with a vacuum cleaner. 8. Apply putty to the holes and obvious depressions on the surface of the floor to fill the batch scraping, and polish and vacuum after drying.

  10. Anonymous users2024-02-01

    The floor paint method is as follows:

    1. Grass-roots treatment, grinding and vacuuming;

    2. An epoxy high permeability primer;

    3. Solvent-free medium coating mortar layer, (from the thickness, after a film formation, find a large pit, the hardness is large, if there is no requirement, you can not do the mortar layer).

    4. Paint two epoxy putties (after drying, polish and vacuum with a dust-free grinder) 5. Paint one epoxy floor paint topcoat.

    The above can basically achieve the characteristics of beauty, anti-pressure, wear resistance, dustproof, waterproof, etc., the contractor is about 35 yuan, the ground condition is better, you can not do the mortar layer, such as the need to resist heavy pressure, you need to do the mortar layer, the construction is best to be experienced, the floor paint construction is not a simple construction, 135 Yin 2209 Lin 6039.

  11. Anonymous users2024-01-31

    The steps of floor mortar leveling include ground base treatment, elevation plastering cake, brushing cement slurry, laying cement mortar, surface matte treatment, and completion maintenance.

    1.Ground base treatment.

    Before construction, it is also necessary to treat the ground base to ensure that defects such as ground hollowing and block lifting have been repaired or eradicated. And ensure that the ground base is cleaned and there are no construction obstacles. In addition, it is necessary to wrap the roots of the finished wood products, wrap the roots of the original facilities in the room, or block them with materials.

    2.Elevation plastering cake.

    According to the type and thickness of the ground paving decoration material and the standard line of the finished surface to determine the leveling thickness, the general surface layer plastering thickness is not less than 20mm, and the leveling control line pops up on the wall. According to the leveling control line along the wall around the plastering cake, the size of the ash cake is generally 5x5cm size, the horizontal and vertical spacing is meters, and the upper plane of the ash cake is the elevation of the ground surface layer. If the room is larger, it is also necessary to wipe the bars.

    The mortar material mix ratio of plastering cake and standard reinforcement is the same as that of plastering mortar.

    3.Brush with grout.

    The function of cement slurry is to make the cement mortar and the ground more closely connected. The cement slurry needs to be prepared according to the ratio of 1:, and after the modulation, it is brushed to the ground with a broom and other tools to form a bonding layer.

    4.Lay cement mortar.

    After the cement mortar is painted, the cement mortar is paved, and the mud mortar mix ratio is cement: sand = 1:2, which should be stirred evenly. After the cement mortar is fully paved, it is flattened with a long wooden pole to make the mortar and the base layer dense.

    5.Matte finish on the surface.

    Surface calendering is carried out in two stages. For the first time, the cement mortar condenses slightly against water, and there are footprints when people step on it, but when they do not sink, they use an iron trowel to calender after sprinkling the cement surface, from the corners to the large surface, and the order is compacted and trowelted. And check the flatness with a ruler at any time.

    6.Completion of maintenance.

    After 24 hours of calendering of the surface layer, the surface layer is covered with sawdust or other materials and sprinkled with water to keep it moist, and the curing time is not less than 7 days, and the compressive strength can only be applied when the compressive strength reaches 5MPa. The construction of cement mortar leveling method requires that the surface layer and the base layer are firmly bonded and should not be hollow; The surface should be dense and calendered, and no cracks, peeling, sand and other defects are allowed.

Related questions
11 answers2024-05-14

1. Plain land treatment: the cement plain ground must be thoroughly dried, the ground must not be oiled, the ground cannot be cleaned with water, and the grinding, repairing and dust removal work should be done according to the condition of the plain land; >>>More

12 answers2024-05-14

The business of Beijing Katuo Construction Engineering is widely distributed in residential, automobile manufacturing, machinery, chemical industry, electronics, medicine, tobacco, papermaking, education, printing, food, supermarkets and other industries, and constantly provides perfect system solutions that meet the needs of these industries. Looking forward to hearing from you!

11 answers2024-05-14

1. The concrete strength must be C25Contains more than 350kg of m3 of common silicate. cement and water-cement ratio <; 2. The screed must be fine stone concrete and its thickness shall not be less than 50 mm. >>>More

5 answers2024-05-14

What is the ** of epoxy flooring.

a.Epoxy resin self-leveling floor: according to the color, thickness of the difference, the general self-leveling in 42 120 yuan, rarely lower than this ** scene. >>>More

9 answers2024-05-14

1. Mechanical performance requirements are mainly in the following three aspects: >>>More