-
Putty powder, sewing tape, Nippon paint, roller wool brush, etc.
Putty powder is a kind of surface leveling powder material that pretreats the construction surface before paint construction, the main purpose is to fill the pores of the construction surface and correct the curve deviation of the construction surface, so as to lay a good foundation for obtaining a uniform and smooth paint surface. Putty is generally composed of base material, filler, water and additives.
-
Putty powder, sewing tape, Nippon paint, roller wool brush, etc.
-
Surely he chose to do the carpenter's work.
The order of the decoration should be:
1. Preliminary design.
2. Demolition and modification of the main body.
3. Hydropower transformation.
4. Carpentry. 5. Tiling.
6. Paint the wall.
7. Kitchen and bathroom ceilings.
8. Cabinet installation.
9. Wooden door installation.
10. Floor installation.
11. Pave the wallpaper.
12. Radiator installation.
13. Switch and socket installation.
14. Installation of lamps and lanterns.
15. Hardware and sanitary ware installation.
16. Curtain rod installation.
17. Pioneer cleaning.
18. Furniture enters.
19. Household appliance installation.
20. Home accessories decoration.
-
For the decoration in advance to do some dirty work, especially the wall scraping some white, do some examples, do some bricks on the ground, these are some dirty work with water and cement, so it is done first, and finally it is carpenter work, he is actually relatively clean, but there will be a little sawdust.
-
Renovation is a carpenter's work first.
Decoration is also known as decoration or decoration. Refers to a set of construction plans and design schemes that are carried out in a certain area and scope, including special hydropower construction, belonging to walls, floors, ceilings, landscapes, etc., and are formed according to certain design concepts and aesthetic rules.
The perfect decoration should be closely integrated with the function of the object, adapt to the production process, give full play to the properties of the material material, and have a good artistic effect.
A carpenter is a person who specializes in carpentry on a ship, managing anchor equipment, water tanks, and fresh water.
Under the leadership of the first mate, boatswain is responsible:
Manufacture and handling of marine wood parts.
Use and general maintenance of anchor equipment.
Measurement and recording of fresh water, ballast water and sewage, and irrigation, discharge, transfer, addition of fresh water and management of water tanks according to the instructions of the chief officer or the driver on duty.
The closure and opening of watertight parts, the unblocking of drain pipes and sewage pipes, and the blocking of deck drain holes when adding fuel.
If the boatswain is unable to perform his duties for any reason, he shall perform his duties.
A person who uses hand tools or machine tools in the manufacture of furniture parts, door and window frames, or other wood products.
Carpenters are engaged in a wide range of industries, they can not only make all kinds of furniture, but also in the construction industry, decoration industry, advertising industry, etc.
-
Tempered glass glass with compressive stress on the surface. Tempered glass is different from ordinary glass in that it has a very high degree of strength and thermal stability. And the tempered glass can see the colored streaks through the polarizer and the edges of the glass.
Moreover, when the glass is damaged by external force, the fragments will form small particles similar to honeycombs, which are not easy to cause serious harm to the human body.
-
In general, the order of decoration can make the renovation of water and electricity lines, bricklayers, carpentry, and white. However, the order can be determined according to the difficulty of the construction, for example: the wooden floor or ceiling needs to be tung oil or scrape the varnish should be scraped first after the carpentry.
You can put on the big white, but you don't paint it.
-
Do the carpenter's work first and then do the big white, and the carpenter's work is more buried, so you can only scrape the big white later.
-
Electrician, bricklayer, carpenter, big white.
-
Hydropower shingle oil, first do carpenter's work and then scrape the white.
-
Normally, wood is made first and then painted, and cross-operation can also be carried out under special circumstances.
-
The decoration process is generally to decorate the carpentry first, and then scrape the white after the carpentry is completed, so as not to affect the decoration effect.
-
If the windows are closed, the indoor and outdoor air will lack circulation and will dry very slowly, so it is best to open the windows.
The steps are as follows: First, temperature control. It's about 10 degrees Celsius, so it's not accurate to say that, it should be as long as it's not freezing.
But it must not be too high, and it is absolutely not correct to turn on the geothermal heat. If the outdoor temperature is very low, you can drive all the way to keep the indoor from freezing, which is enough.
Second, the control of ventilation. In winter, it is very cold outside, the doors and windows are closed, the indoor and outdoor air is not circulated, and it will dry very slowly.
Third, the control of time. As long as the putty drying time is controlled, the construction period of the wall construction in winter should be at least twice as long as that in summer, and the wall drying time should be appropriately extended, and the interval between the time of scraping each putty should be extended. Resolutely not to rush the deadline.
Fourth, grassroots treatment. The wall solid is not glue, the wall solid is an emulsion, but it can be seen in the market.
It is a large number of gel-filled emulsions, and the so-called inferior interface agent is very low in cost because of its low cost, and there is still a great survival soil, but the gap in performance is especially obvious in winter. It is recommended to use interface products with regular emulsion ingredients.
Fifth, the control of painting. Also because of poor ventilation may lead to the phenomenon of enzymes in the paint without mildew prevention function, timely attention, timely treatment, winter painting, paint film curing cycle, will exceed the conventional seven days, pay attention to it as appropriate.
-
Don't open the window for this, that's not good.