-
Money, open joints.
Network. Gives you a way to open up the joints.
Relationships: Make you like a fish in water.
-
Directory. 1. Table 001 of pile foundation engineering overview.
2. 002 form of construction site quality management inspection record.
3. Form 003 of the construction organization design and construction plan audit form.
4. Engineering geological survey report.
5. Form 004 of technical disclosure record.
6. Design change documents.
Drawing review, design change, negotiation record summary table 005 table.
Drawing Triage Record Form 006.
Design Change Order Form 007.
Project Negotiation Record Form 008.
7. Construction survey records.
Pile position measurement pay-off record 009 table.
Engineering positioning measurement pay-off record 010 table.
8. Form 011 of pile foundation engineering engineering report.
9. Form 012 of pile foundation project completion report.
10. Form 013 of the engineering construction diary.
11. Form 014 of pile foundation engineering quality accident report.
12. Raw materials, semi-finished products and finished products are certified as factory quality.
13. Form 023 of pile test records.
14. Pipe pile construction acceptance record.
15. Acceptance records of concealed projects.
16. Pipe pile construction record.
17. Acceptance record of pipe pile position deviation when digging to the design elevation.
18. Ground groove inspection records.
19. Pile foundation sub-division project acceptance record.
20. Verification records of unit (sub-unit) engineering quality control data.
21. Pipe pile sub-project quality acceptance record.
22. Pipe pile inspection batch quality acceptance record.
23. Pile foundation bearing capacity and pile quality inspection report.
-
According to the provisions of Chapter III of the "Construction Quality Acceptance Standards for Building Foundation Engineering", the following information should be submitted when the foundation engineering is accepted:
1. Geotechnical engineering investigation report;
2. Design documents, drawings review records and technical disclosure materials;
3. Engineering surveying, positioning and pay-off records;
4. Construction organization design and special construction plan;
5. Construction records and self-inspection and evaluation reports of the construction unit;
6. Monitoring data;
7. Acceptance data of concealed projects;
8. Testing and inspection report;
9. As-built drawings.
In addition, the inspection items carried out before and during the construction should be made, and should be recorded and reviewed accordingly.
-
When the pile foundation is accepted, the completion report of the foundation cast-in-place pile, the application form of the construction organization design plan, the construction organization design plan, the welder employment certificate, the steel application form, the steel material report, the steel factory quality certificate and the summary table of the test sheet, the mechanical properties of the steel bar test report, the steel welding performance test report, the welding rod quality assurance certificate, the certificate, the application form for the inspection of the trial hole, the equipment application form, the concrete compressive strength test report summary table, the concrete strength quality assessment form, the concrete compressive strength test report, Reinforcement cage inspection application liquid attack lease request form, Zenyou reinforcement cage concealment inspection record, welded joint inspection record, concrete inspection application form, concrete construction inspection record, concrete pouring permit, bored pile pouring construction inspection record, pile foundation sub-division engineering acceptance record, pile foundation reinforcement sub-project quality acceptance record, pile foundation concrete sub-project quality acceptance record, reinforcement cage inspection batch quality acceptance record, concrete raw material omen and mix ratio design inspection batch quality acceptance record, Concrete construction inspection batch quality acceptance record, concrete cast-in-place pile engineering inspection batch quality acceptance record, concrete cast-in-place pile engineering inspection batch quality acceptance record, intermediate acceptance record, pile foundation low strain dynamic test report, static load test report, bored pile bored pile construction inspection record, pile offset inspection record, pile position as-built drawing, etc.
-
What inspection and approval do you need to do for the construction of steel pipe piles, hello laughing sail, foundation pit support with foundation pit touch key hail inspection batch. In addition, it depends on what specific support methods are used, such as: anchor rod and soil nail wall inspection batch quality acceptance record, steel and concrete bright soil support inspection batch quality acceptance record and so on.
I hope my answer is helpful to you, and finally I wish you good health and a happy mood again! <>
Hello dear if my answer is helpful to you, please give a thumbs up (comment in the lower left corner), look forward to your like, your efforts are very important to me, and your support is also the driving force for my progress. Finally, I wish you good health and a good mood!
-
1. Completion report of foundation cast-in-place pile.
2. The application form for the construction organization design plan.
3. Construction organization design plan.
4. Welder employment certificate.
5. Steel application form.
6 Steel Material.
7. Summary table of steel factory quality certificate and test sheet.
8. Test report on mechanical properties of steel bars.
9. Steel bar welding performance test report.
10. Welding rod warranty and certificate.
11. Application form for test hole inspection.
12. Equipment application form.
13 Summary table of concrete compressive strength test report.
14 Concrete Strength Quality Assessment Table.
15 Concrete compressive strength test report.
16. Application form for inspection of reinforcement cage.
17 Concealed inspection records of reinforcement cages.
18 Welded joint inspection records.
19 Concrete inspection application form.
20 Concrete construction inspection records.
21 Concrete pouring permit.
22. Inspection records of bored pile cast-in-place construction construction.
23. Pile foundation (sub-division) project acceptance record.
24. Pile foundation reinforcement sub-project quality acceptance record.
25. Pile foundation concrete sub-project quality acceptance record.
26. Reinforcement cage inspection batch quality acceptance record.
27 Concrete raw materials and mix design inspection batch quality acceptance records28 Concrete construction inspection batch quality acceptance records.
29 Concrete cast-in-place pile (reinforcement cage) engineering inspection batch quality acceptance record 30 Concrete cast-in-place pile engineering inspection batch quality acceptance record.
31 Intermediate Acceptance Record.
32 pile foundation low strain dynamic test report, static load test report 33 bored pile borehole pile borehole construction inspection record.
34 Pile Offset Check Records.
As-built drawings of 35 piles.
-
1. Construction blueprints, design disclosure minutes, and design changes;
2. Construction organization design and professional construction plan and review records;
3. Inspection records during the construction process;
4. Inspection batch acceptance records;
5. Core sampling plan;
6. Core sampling inspection report;
7. Sampling records in the process of supervising the company;
8. On-site axis elevation detection records, etc.
-
According to Article 31 of the Regulations on the Quality Management of Construction Projects, the construction personnel shall take samples on site under the supervision of the construction unit or the project supervision unit for the test blocks, test pieces and related materials involving structural safety, and send them to the quality inspection unit with the corresponding qualification level for testing.
The construction unit must inspect the building materials, building accessories, equipment and commercial concrete in accordance with the engineering design requirements, construction technical standards and contract agreements, and the inspection shall have a written record and a special signature; If it has not been inspected or the inspection is unqualified, it shall not be used.
-
1. Manage data.
2. Technical data (construction records, measurement and pay-off, concealed engineering) 3. Division, inspection batch.
4. Quality assurance data (raw materials, joints, test blocks, pile foundation test reports) 5. As-built drawings.
6. Construction log.
-
What information is needed to inspect the pile.
-
1. Construction blueprints, design disclosure minutes, and design changes;
2. Construction organization design and professional construction plan and review records;
3. Inspection records during the construction process;
4. Inspection batch acceptance records;
5. Core sampling plan;
6. Core sampling inspection report;
7. Sampling records in the process of supervising the company;
8. On-site axis elevation detection records, etc.
-
You flip through the standard, it depends on whether it is on land or on water, and on the water it is recommended that you refer to JTS-2008
-
Go to the certification center and buy some books
-
1. Pile hole recording; 2. Pile construction records; 3. Processing, installation, concealed inspection and acceptance records of steel cages; 4. Concrete pouring record of cast-in-place pile; 5. Concrete strength report and evaluation; 6. Material certificate, test report and re-inspection report for foundation pile; 7. Pile bearing capacity test report; 8. Low strain test report of pile integrity; 9. Pile foundation sub-division and sub-item acceptance records; 10. Verification records of project quality control data of units (sub-units); 11. Pile foundation sub-division engineering safety and function inspection data verification and main function spot check records; 12. a pile construction record summary table; 13. Self-assessment report.
When the pile diameter is small, two piles are arranged along the diameter. >>>More