What are the requirements for the professional contracting qualification of the second level buildin

Updated on society 2024-02-25
8 answers
  1. Anonymous users2024-02-06

    Level 2 Qualification Standards

    Business Assets:Net assets of more than 4 million yuan.

    Key personnel of the enterprise

    1) There shall be no less than 4 registered constructors majoring in construction engineering.

    2) The technical person in charge has more than 8 years of experience in engineering construction technology management, and has an intermediate title or above in construction engineering related majors or a registered construction engineer (or registered structural engineer) professional qualification in construction engineering; There are no less than 6 personnel with intermediate or above professional titles in the professional engineering sequence of structure and machinery, and the majors are complete.

    3) There are no less than 8 construction site management personnel with post certificates, and the construction personnel, quality personnel, safety officers, material personnel, data personnel and other personnel are complete.

    4) There are no less than 10 skilled workers above the intermediate level who have passed the assessment or training.

    5) The technical person in charge (or registered constructor) has presided over the completion of no less than 2 projects in this category.

  2. Anonymous users2024-02-05

    1.Business Assets:

    Net assets of more than 4 million yuan.

    2.Key personnel of the enterprise

    1) There shall be no less than 4 registered constructors majoring in construction engineering.

    2) The technical person in charge has more than 8 years of experience in engineering construction technology management, and has an intermediate title or above in construction engineering related majors or a registered construction engineer (or registered structural engineer) professional qualification in construction engineering; There are no less than 6 personnel with intermediate or above professional titles in the professional engineering sequence of structure and machinery, and the majors are complete.

    3) There are no less than 8 construction site management personnel with post certificates, and the construction personnel, quality personnel, safety officers, material personnel, data personnel and other personnel are complete.

    4) There are no less than 10 skilled workers above the intermediate level who have passed the assessment or training.

    5) The technical person in charge (or registered constructor) has presided over the completion of no less than 2 projects in this category.

  3. Anonymous users2024-02-04

    Second-tier enterprises:It can undertake the construction of curtain wall projects with a curtain wall area of less than 8,000 square meters for single building projects.

    First-class enterprise: can undertake the construction of various types of building curtain wall projects.

    Since November 1, 2016, in addition to the lowest level of qualifications, the index assessment of registered constructors, personnel with intermediate titles or above, on-site management personnel with post certificates, and skilled workers will be cancelled. (Notice of the Ministry of Housing and Urban-Rural Development on Simplifying Some Indicators of the Qualification Standards for Construction Enterprises, Jian Shi [2016] No. 226).

    Precautions for building curtain walls.

    Hidden frame curtain wall and semi-hidden frame curtain wall usually use pressure plate (briquetting) to transmit force, and its spacing is generally not more than 300mm, and there are two kinds of fixed distance and non-fixed distance pressure plate. After the fixed-distance pressing plate is tightened by the connecting bolt, the crimping gap is relatively fixed, and the compression force of the glass panel sub-frame is relatively consistent, which is convenient for absorbing the deformation of structure and temperature, reduces friction noise, and can avoid the image distortion of the glass panel caused by uneven briquetting.

    The false exposed frame usually adds a decorative strip at the joint of the hidden frame curtain wall to play the decorative effect of the exposed frame curtain wall. This structure should be designed with insulating glass and structural adhesive using the design method of concealed frame curtain wall, that is, the second sealant should be sealed with silicone structural adhesive. If polysulfide glue is used as a second seal for insulating glass, although it may not necessarily be destroyed under UV irradiation, there are still unsafe factors.

  4. Anonymous users2024-02-03

    It can undertake the construction of building curtain wall with a single contract amount not exceeding 5 times the registered capital of the enterprise and a single project area of less than 8,000 square meters and a height of less than 80 meters.

  5. Anonymous users2024-02-02

    Second-level qualification curtain wall enterprise: can undertake the construction of building curtain wall projects with a single contract amount not exceeding 5 times the registered capital of the enterprise and a single project area of 8,000 square meters and below, and a height of 80 meters and below.

  6. Anonymous users2024-02-01

    Secondary qualification: It can undertake the construction of building curtain wall projects with a single contract amount not exceeding 5 times the registered capital of the enterprise and a single project area of 8,000 square meters and below, and a height of 80 meters and below.

  7. Anonymous users2024-01-31

    The second-level curtain wall qualification can undertake the curtain wall project of a single building project with a curtain wall area of less than 8,000 square meters (including 80,000 square meters). The first-class curtain wall qualification can undertake the construction of various types of curtain wall projects before building old buildings.

    The building curtain wall is an indispensable part of the modern city, one of the important structures of contemporary architecture, and one of the main symbols of the modern city. There are many types of building curtain walls, and the technical strength has also developed rapidly with the development of the construction market. Architectural glass curtain wall construction enterprises need to obtain the corresponding curtain wall secondary qualification certificate.

    Application for second-level qualification conditions for building curtain wall:

    1. To apply for the second-level qualification of building curtain wall, there must be no less than 4 registered architects majoring in architectural engineering.

    2. The project leader has more than 8 years of experience in engineering construction technology management: has an intermediate technical title in construction engineering related majors or has passed the professional qualification examination of registered architect (or registered structural technician) in construction engineering. At the same time, the second-level qualification of building curtain wall has requirements for personnel performance, and it is stipulated that the project leader or registered architect has organized no less than 2 projects of flow and killing.

    3. Regulations on building curtain wall qualifications and technical personnel: no less than 10 intermediate or above technical personnel who meet the requirements after assessment or learning and training apply for the second-level qualification of building curtain wall. <>

  8. Anonymous users2024-01-30

    Hello <>

    The second-level curtain wall qualification is a qualification level in China's construction industry, which refers to the ability and experience of the enterprise to undertake the second-level curtain wall project in the field of pink-sensitive curtain wall engineering. According to the relevant national regulations, the second-level curtain wall qualification can undertake curtain wall projects with a height of no more than 100 meters. Specifically, the second-level curtain wall qualification can undertake the following types of curtain wall projects:

    1.Commercial building curtain wall engineering: such as shopping malls, hotels, office buildings and other commercial building curtain wall projects with a height of no more than 100 meters.

    2.Industrial building curtain wall engineering: such as factories, warehouses, logistics centers and other industrial building curtain wall projects with a height of no more than 100 meters.

    3.Curtain wall engineering of public buildings: such as curtain wall projects of public buildings with a height of no more than 100 meters such as schools, hospitals, gymnasiums, libraries, etc.

    The second-level curtain wall qualification can only undertake curtain wall projects with a height of no more than 100 meters, and if you need to undertake curtain wall projects with a height of more than 100 meters, you need to have a higher level of curtain wall qualification. In addition, the relevant regulations may vary from place to place, and the specific scope of the undertaking needs to be confirmed according to the local regulations.

Related questions
10 answers2024-02-25

The following three conditions are required for the second level of construction enterprises to be upgraded to one level: >>>More

16 answers2024-02-25

The output of this program is: 4

You can standardize the program to make it easier to understand. >>>More

12 answers2024-02-25

The first construction can be used for large, medium and small projects, which are common throughout the country, and the second construction can be used for small and medium-sized projects. Commonly used in the province, one is that the scope and the size of the project are different.

16 answers2024-02-25

What are the subjects to be taken for the mechanical and electrical engineering major of the second-level constructor. >>>More

7 answers2024-02-25

Caching is very important for CPUs.

So what exactly is this cache? >>>More