Calculated according to the horizontal projection area of the actual tower, without deducting the area occupied by the attached wall columns and columns, the basic floor height shall prevail to the above. Where the ceiling plastering and decoration exceeds the limit, the scaffolding should be counted.
Basic layer. If the height of the layer is exceeded, an additional layer is calculated for each increase, and the number of layers of the additional layer = (layer height, rounded to the nearest integer.)
If the indoor scaffolding is calculated, the interior wall decoration will no longer be counted as the decorative frame, and the erection man-days will only be increased by every 100 vertical projection area of the wall.
-
Full scaffolding is calculated according to the projection area actually erected.
Full scaffolding is calculated at different heights. The height of the full scaffolding is based on the indoor floor or floor to the bottom of the ceiling, and the ceiling without a ceiling is counted to the bottom of the floor, and the ceiling with a ceiling is calculated to the surface layer of the ceiling, and the inclined ceiling is calculated according to the average height. After the scaffolding is calculated, the scaffolding is no longer counted for the interior column wall decoration project.
-
First, the full scaffolding is a scaffold erected for the construction of indoor ceiling (plastering, painting, scraping, etc.), and the full scaffolding is erected parallel to the ground in the construction of the shed;
Second, the calculation of the engineering quantity of the scaffold is calculated according to the horizontal projection area of the ceiling, with the height of the meter as a standard base price, more than the meter, each additional meter is calculated as an additional layer, and the drop of less than the meter height is not calculated.
-
General Rules for Quantity Calculation of Scaffolding:
1. All masonry with more than the height of the masonry needs to be calculated as scaffolding.
2. The wall scaffolding is calculated in square meters according to the vertical projection area of the wall (single-sided).
3. When calculating scaffolding, the area occupied by doors, window openings, empty rings, vehicle passages, deformation joints, etc. is not deducted.
4. When the height of the same building is different, it is calculated separately according to the vertical height of the building.
Calculation rules for full scaffolding: if the height of the ceiling plastering exceeds the ceiling, the full scaffolding shall be calculated according to the net indoor area, and the area occupied by columns, buttresses and chimneys attached to the wall shall not be deducted.
-
Full house of scaffolding.
The calculation rules are:
1. Plastering greenhouses or decorative ceilings with indoor heights exceeding. Full scaffolding should be calculated.
2. The full scaffold is calculated by the horizontal area, and the area is calculated according to the horizontal projection area of the ceiling constructed by the full scaffolding, without deducting the area occupied by the stacks, columns, and chimneys attached to the wall;
3. The height of the full scaffolding is calculated from the indoor floor to the bottom of the greenhouse (the average height of the inclined ceiling);
4. The basic layer of the full scaffold is prepared within 8m, and when the height of the increased layer exceeds 1m, it can be calculated according to the height of an additional layer.
Full house scaffolding is also known as full house red.
Scaffolding is a construction technology that erects scaffolding in the horizontal direction, and is mostly used for vertical support, such as the support system of building floors.
The full-hall scaffold is a high-density scaffold, and the distance between adjacent members is fixed, and the pressure is evenly conducted, so it is also more stable.
Full scaffolding is mainly used for the decoration construction of single-storey factories, exhibition halls, gymnasiums and other buildings with high floors and large bays. It is supported by vertical rods, cross bars, diagonal braces, and scissors.
and so on.
-
The quantity of scaffolding in the full hall needs to be calculated according to the floor height of the scaffolding.
The calculation formula is expressed as follows, the full scaffolding increases the floor = the floor height, and when the ceiling surface is brushed and sprayed with ash water alone, the floor height is below the cost of scaffolding.
The height is up to 10m, and it is calculated as 50% of the basic floor sub-project of full house scaffolding. If the width of the strip foundation is greater than 3m and the depth is greater than that, it is calculated according to the full foundation scaffolding.
Full scaffolding quantity calculation rules description:
1. The amount of external scaffolding and vertical closure of the building is calculated according to the length of the outer edge of the outer wall, multiplied by the height of the outdoor floor to the top of the outer wall in m2, and the wall stack with the outer width of the protruding wall is within 24cm, and the chimney attached to the wall is not calculated as the amount of scaffolding, and when it exceeds 24cm, it is calculated according to the size shown in the figure and incorporated into the amount of external scaffolding. The area occupied by door and window openings, empty rings, etc. is not deducted.
2. The engineering quantity of scaffolding is calculated according to the vertical projection area of the wall.
3. The independent column is calculated according to the quota project of the single row of external scaffolding, and its engineering quantity is calculated in m2 according to the perimeter of the peripheral perimeter of the column structure shown in the figure plus the multiplied height. <>
-
The calculation rules and measurement methods of full scaffolding are as follows:
1. When calculating the full house scaffolding, it is necessary to calculate its additional layer, which is related to its floor height. First of all, you need to understand how high the floor is, then subtract the meters, take this data and divide it by the meters. If the height of the floor is less than meters, the cost of scaffolding is not calculated.
If the height is between meters and 10 meters, it needs to be calculated according to half of the basic layer sub-purpose of the scaffolding.
2. If it is a ceiling, its net height is below the meter, no matter what kind of decoration process it is, there is no need to calculate the scaffolding. However, if it is between meters and meters, it needs to be calculated according to the quota of the scaffolding layer. If the meter is exceeded, the base layer and the additional layer need to be added together during the calculation.
Classification of scaffolding:
1. If it is divided from its use, some are scaffolds for protection, and some are scaffolds that can play a load-bearing capacity, mainly to ensure the safety of staff. If it is an operation scaffold, it is also called a job scaffold, which is a commonly used type in decoration.
2. If according to the way of supporting, some are floor-mounted, some are suspended and suspended, and one is a scaffold with lifting. Relatively speaking, it can reach a certain height, and is suitable for roofing, ground or other platform use. <>
-
Hello dear, the calculation formula of full scaffolding: if the height is exceeded, every additional 1m will be multiplied by the coefficient according to the quota of the full scaffolding layer. Calculation Rules:
Full scaffolding is calculated according to the net area of the room, and the basic layer is calculated when its height is in between, and an additional layer is calculated for each additional floor. Full scaffolding is calculated in terms of area according to the dimensions shown in the diagram. The calculation of the scaffolding area is based on its projection area.
The use of full scaffolding depends on its height, and if the net height of the ceiling is below the ceiling, no matter what kind of decoration technology is used in the ceiling, the decorative scaffolding is not counted. Hope it helps you <>