When will the construction of the exterior wall insulation begin, and the structure will be ,,,,, af

Updated on society 2024-02-28
10 answers
  1. Anonymous users2024-02-06

    Acceptance of exterior wall insulation construction, I don't know if the landlord is asking about the acceptance of thin plastering on the exterior wall? Or the acceptance of the exterior wall insulation integrated board.

    Xi'an Yongan Building mainly does the exterior wall insulation integrated board, the following is about the acceptance of the building exterior wall insulation integrated board, please check.

    There should be written records and image records for the acceptance of concealed projects, and the parts and contents that need to be accepted include:

    1.the base layer attached to the thermal insulation and decorative integrated board and its surface treatment;

    2.Bonding or fixing of thermal insulation and decorative integrated boards;

    3.the location and number of anchors;

    4.Thermal bridge treatment;

    5.treatment of plate joints and structural nodes between thermal insulation and decorative integrated boards;

    6.the thickness of the insulation material used in the thermal insulation and decorative integrated board;

    7.The material, thickness, width and spacing of the insulation material of the fireproof isolation belt;

    8.The installation of fireproof isolation structures between floors.

    The quality acceptance of the inspection batch shall comply with the following provisions:

    1.The inspection batch shall be accepted according to the main control project and the general project;

    2.The main control project should be all qualified;

    3.When the general item adopts the counting test, more than 90% of the inspection points should be qualified, and the rest of the inspection points shall not have serious defects;

    4.There should be a complete construction plan and quality inspection records.

  2. Anonymous users2024-02-05

    The basement can be insulated after the exterior wall waterproofing construction is completed. The exterior wall insulation construction can begin after the completion of the internal plastering of the above-ground building and the completion of the frame installation of the railings and windows.

  3. Anonymous users2024-02-04

    The process before making the insulation board:

    Brick wall base plastering, concrete and foundation wall cleaning, concrete wall coating interface agent.

    Yin and yang angle hanging line and horizontal line setting (the perimeter of the house should be closed).

    Preparation of materials for exterior wall insulation construction.

    polymer glue powder; alkali-resistant glass fiber mesh cloth; anchors; Expansion joint.

    Plastic strips, phenolic insulation board and other insulation materials, phenolic board special interface agent.

    1. Personnel related to construction must carefully read the construction drawings before construction and communicate with the construction site.

    Conduct comparisons and check the situation of on-site and drawing changes in a timely manner.

    2. Implement the storage of construction materials and construction tools, accommodation arrangements for construction personnel, and other related matters.

    3 Inspect the gondola or scaffolding.

    There must be no safety hazards.

    4. Check the construction water and electricity.

  4. Anonymous users2024-02-03

    Under normal circumstances, after the end of the internal plastering, the installation of the railing and window frames, the external wall insulation construction can begin.

  5. Anonymous users2024-02-02

    Conventional structure capping, removal of the outer frame roof can be installed hanging blue in order to construct the façade.

    As for the rush measures, there are different but there are hidden dangers, and it is not recommended that the façade be constructed before the structure is capped.

  6. Anonymous users2024-02-01

    After the completion of the main construction, the exterior wall insulation can be done, and it will be accepted after completion.

  7. Anonymous users2024-01-31

    What are the specific contents of the acceptance of the external wall insulation construction process, what are the construction of the external wall insulation system, and what are the acceptance standards for the external wall thermal insulation application.

    1. Acceptance of the construction process of external wall insulation.

    1) The varieties and technical properties of various materials entering the site should meet the design and product quality requirements.

    2) The structure of each layer of the insulation system shall comply with the design requirements and the relevant technical regulations or atlas regulations.

    3) There is no hollowing or cracking of the protective layer.

    4) The mesh cloth is in close contact with the insulation layer, and there is no warping.

    2. Construction of exterior wall insulation system.

    1.Rock wool façade system.

    The system structure mainly includes: adhesive layer, insulation layer, plastering layer, finishing layer and accessories. The finishing layer should be made of lightweight functional coatings such as finishing mortar and decorative mortar, or water-based exterior wall coatings with good air permeability.

    Rock wool board external wall insulation system, low thermal conductivity, good air permeability, high combustion performance level and other advantages, composite A grade polyurethane external wall insulation board.

    Composite A-grade polyurethane exterior wall insulation board.

    It can be applied to the energy-saving and thermal insulation projects of the exterior walls of residential buildings and public buildings in new construction, expansion and reconstruction, including external wall thermal insulation, non-transparent curtain wall insulation and fire isolation belts of EPS external thermal insulation systems.

    2.Polyurethane insulation.

    Fire protection index of polyurethane exterior wall insulation system.

    In September 2009, the "Interim Regulations on Fire Prevention of Exterior Wall Insulation System and Exterior Wall Decoration of Civil Buildings" was promulgated and implemented, which made clear requirements for the fire rating of building insulation materials. At present, the wall insulation materials commonly used in China are very flammable, and how to combine the high efficiency and energy saving of thermal insulation materials with excellent fire prevention has become an industry problem.

    Polyurethane exterior wall insulation and fireproof system has outstanding fire performance, reaching the national A-level standard, fire and heat resistance, no melting, no dripping, low smoke at high temperature, good dimensional stability, and has a good thermal insulation and energy-saving effect, which combines excellent fire performance and good energy-saving effect, and is suitable for external wall insulation and many other fields.

    3. Acceptance criteria for exterior wall insulation.

    1.The surface of the wall is smooth and smooth, no repair traces, no stubble, and good appearance.

    2.The surface of the overall wall has no hollows, no cracks, no spots, and uniform color.

    title="Zhongda consulting WeChat***" alt="Zhongda consulting WeChat***" width="600" height="345" border="0" vspace="0" style="width: 600px; height: 345px;"/

    Pay attention to the mobile phone Zhongda Consulting (, real-time understanding of the latest developments in the construction industry.

  8. Anonymous users2024-01-30

    1. Construction quality inspection methods and standards.

    1) After the completion of each process, check the flatness in all directions with a 2m flat ruler, and check the verticality with a line drop ruler, and the standard is that the deviation between the vertical and the entrainment degree is not more than 3mm.

    2) The thickness deviation of the insulation layer is checked by acupuncture method to determine whether the actual thickness of the insulation core board meets the design requirements.

    3) random sampling inspection, every 100 random inspection points, if the point does not meet the design requirements, then increase the sampling inspection points for every 30 points, and make a record, to be made mathematical statistics, evaluate the quality.

    4) The quality control inspection in the construction operation shall be organized by the quality inspector, and the whole process of construction quality shall be controlled, and the quality of the process shall be controlled.

    2. Acceptance standards for project quality assessment.

    1) The surface of the wall is smooth and smooth, no repair traces, no stubble, and good appearance.

    2) The yin and yang angles are vertical and square, in line with the requirements of quality regulations. The permissible deviation of the verticality and surface flatness of the façade shall comply with the relevant regulations.

    3. There is no hollowing, no cracks, no spots, and uniform color on the surface of the overall wall.

  9. Anonymous users2024-01-29

    Exterior wall insulation construction technology and acceptance specifications.

    Exterior wall insulation construction technology:

    1.Surface treatment: clean the oil, dust and loose matter on the surface of the exterior wall, and polish it evenly.

    2.Foundation treatment: Deal with the waterproof, moisture-proof and thermal insulation of the foundation parts.

    3.Gluing: Use a professional adhesive film machine to apply the glue to the surface of the exterior wall to ensure tightness.

    4.Fixing the insulation board: After positioning the prefabricated insulation board, fix it with an angle iron or nails.

    5.Seam Treatment: Treat the seams between the insulation panels to ensure that the seams are tight and seamless.

    Acceptance specifications:1Check whether the thickness of the insulation board meets the design requirements.

    2.Check the fixing condition and bonding quality of the insulation board.

    3.Check whether the thickness of the air layer between the insulation layer and the wall base layer meets the requirements.

    4.Check whether the insulation construction meets the requirements of the specification.

    5.Acceptance of the color, flatness, bonding firmness and other items of the finishing layer.

  10. Anonymous users2024-01-28

    In fact, this standard is different, but our masters do things according to experience, because each project can not guarantee that the wall is 100% flat, and of course, the thickness of each insulation board cannot be the same.

    It is very necessary for the construction acceptance of building exterior wall insulation materials, so that relevant quality problems can be found in time during and after construction, the quality accident rate of the insulation system can be controlled, and the performance and safety of the system can be ensured. The acceptance process of building exterior wall insulation construction mainly includes: construction quality inspection methods and standards, insulation engineering quality assessment and acceptance standards, and the following is a specific introduction to the two specific inspection methods of the process.

    1. Construction quality inspection methods and standards:

    1. After each process of insulation construction is completed, it is necessary to check the flatness of the light body in each direction with a flat ruler. Check the verticality with a line drop ruler, and the deviation between the vertical and the entrainment is 3mm;

    2. To check the thickness of the insulation layer by acupuncture, the design regulations of the composite insulation system are required;

    3. Random inspection checkpoints, if the checkpoints do not meet the design requirements, it is necessary to increase the sampling checkpoints to set one point for every 30, and make a record to be made for mathematical statistics to evaluate the quality;

    4. The quality inspector needs to check the quality control in the construction operation, and focus on controlling the quality of the process before the next process can be constructed.

    Second, the project quality assessment and acceptance standards:

    1. Observe with the naked eye whether the surface of the external wall of the building is smooth and smooth, whether there are traces of repair, and whether there are stubbles;

    2. The overall surface of the exterior wall needs to be free of cavities, house cracks, spots, and good color and appearance;

    3. Check whether the yin and yang angles are vertical and square, and whether they meet the quality requirements;

    4. Check whether the verticality and surface flatness of the façade are within the specified allowable deviation.

Related questions
6 answers2024-02-28

Define the struct:

typedef struct _legaladdress_{ >>>More

13 answers2024-02-28

It doesn't matter if the brand is a regular brand, because ovulation is around the 14th day of the menstrual cycle, assuming that fertilization is successful at this time, then it takes 6 or 7 days for the fertilized egg to produce HCG at the earliest, and the pregnancy test stick is judged by measuring urine HCG. The real secretion of HCG begins in large quantities is after the implantation of the pregnant egg, and the syncytiotrophoblasts begin to secrete a large amount of HCG. It takes at least 11 days for the gestational egg to implant. >>>More

13 answers2024-02-28

In the conditions that arise are met. Electricity is a phenomenon in which positive and negative charges (electrons) meet and emit energy. For example, lightning is produced when the positive electricity (positive electricity) carried by the cumulonimbus clouds in the high sky and the negative electricity (negative electricity) in the lower layers or on the ground attract each other. >>>More

9 answers2024-02-28

It's appropriate from now on. It's no longer or too early to learn, now you can start memorizing words first, but just sign up for a class. >>>More

6 answers2024-02-28

Ask what this does! What's the point?