What are the normal decoration additions?

Updated on home 2024-02-26
7 answers
  1. Anonymous users2024-02-06

    There should be no additions to the normal decoration. The additions are due to the following reasons:

    1: There are no detailed and standardized design and construction drawings; 2: The decoration company does not understand that some items that must be done are deliberately omitted in order to sign the bill; 3:

    The owner is not firm in his own will, and arbitrarily changes the construction plan or arbitrarily increases or decreases the construction project in the middle of the process, resulting in some additional costs are also additional.

    In fact, as long as the owner is attentive and usually learns more decoration knowledge, it can be effectively avoided. Fall in love with Leju is a decoration platform that makes all decoration processes, materials transparent and open.

  2. Anonymous users2024-02-05

    In the renovation process, the reduction and addition refer to the reduction or increase of the scope of the project in the original renovation contract. The specific explanation is as follows:

    1.Reduction: Reduction refers to the reduction of the scope of the project according to the needs of the owner or the actual situation during the renovation process.

    For example, if the owner changes the original renovation plan and decides not to carry out the construction of one or more projects, then those projects are considered reductions. Reductions can reduce the cost and construction period of renovation works.

    2.Addition: Addition refers to the increase in the scope of the project according to the needs of the owner or the actual situation during the decoration process.

    For example, if the owner decides to add construction to one or more projects, or if there are problems that were not considered in the original renovation contract and new works are required, these items are additional. The addition will increase the cost and construction period of the renovation project.

    In the decoration contract, the relevant provisions of reduction and increase will generally be clearly stipulated, including the procedures for reduction and addition, the method of cost adjustment, and the procedures for changing the contract. If the owner needs to reduce or add items during the renovation process, he should discuss with the decoration company in time and deal with it in accordance with the contract to ensure the fairness and legitimacy of the change. At the same time, in the event of a reduction or addition, it is recommended to confirm the change in writing with the decoration company to avoid subsequent disputes.

    Just enter the area of the house + the city where it is located, and it will recommend 1-4 local decoration companies for you.

    Kunming - [Kunming Decoration Strategy Guide].

    Suzhou - [Suzhou Decoration Strategy Guide].

    Hefei - [Hefei Decoration Strategy Guide].

    Fuzhou - [Fuzhou Decoration Strategy Guide].

    Beijing - [Beijing Decoration Strategy Guide].

    Dalian - [Dalian Decoration Strategy Book].

    Hangzhou - [Hangzhou Decoration Strategy Guide].

    Shanghai - [Shanghai Decoration Strategy Guide].

    Tianjin——[Tianjin Decoration Strategy Guide].

  3. Anonymous users2024-02-04

    Before the decoration, the decoration company will show us the design drawings and a decoration list, (decoration required materials, models, **) of course, this list is generally after a detailed declaration, but in the construction, for some reason to change the material, or other, there will be a subtraction, or addition, such as the original wall design is wallpaper, now want to use latex paint, in the original budget list does not do, to reduce, is to reduce, is to reduce, in the budget list is not the part to do now, is to add.

  4. Anonymous users2024-02-03

    1. In the original contract, the quantity or material usage is the budget, and there will be different changes in the construction stage, and the final accounts** will change accordingly;

    2. It is reasonable to add or decrease items that did not exist in the original contract but need to be added in actual work, or items that exist in the original contract but are not done in actual work. At the same time, it should be noted that in the design stage, it is necessary to be as thoughtful as possible, so as to minimize the need to do additional or subtracted projects, and not to be fooled by the construction personnel during construction;

    3. For the construction of waterways and circuits, the exact quantity cannot be determined at the time of signing the contract, and the charges shall be based on the estimate, and the actual work can only be calculated according to the actual amount. Such an increase or decrease is also reasonable (pay attention to duplicate charges). However, it is best to sign the decoration contract at the same time, but also indicate the charging standards of these items, and the use of the parts should be taken into account, so as to be aware of it, so as not to be in a passive position after the occurrence;

    4. Changing the process practices of the original project will also increase or decrease.

  5. Anonymous users2024-02-02

    Budget to settle after what is not done in the budget is a reduction, the budget is not, and what is in the settlement is an increase. That's it.

  6. Anonymous users2024-02-01

    Renovation additions should be something that all homeowners hate, and they will always "appear" in front of you without even noticing, making you spend more than you budget. So is there a way to avoid these renovation additions? In this issue, we will take stock of the most likely decoration additions, and only by understanding in detail what are the decoration additions, can we avoid being deceived by the decoration company or construction team.

    First, the phenomenon of ground leveling.

    The floor of some houses is not flat enough and needs to be re-leveled during the renovation. If workers are not careful enough or deliberately shoddy, it will cause the problem of "the more you find, the more uneven".

    Note: Do a good job of the base treatment of the ground first, and then pour cement mortar for ground leveling. Use a special level to determine the flatness of the entire ground before proceeding to the next step of construction.

    Second, the phenomenon of wire threading.

    In home renovation construction, almost all wires are worn in PVC pipes and buried in the walls. If workers cut corners, they use wires with splices or thread several strands of wire inside the same PVC pipe.

    Note: It is best for owners to buy their own wires or specify brands. Then supervise the operation of the workers on site, and carry out the power-on inspection after the installation is completed. In addition, be sure to ask the decoration company to leave a "pipeline diagram" so that you can find the location of the line immediately in the event of a failure.

    Third, the phenomenon of wall grooving.

    Buried pipelines must be slotted in walls and ground in order to bury the pipelines. A small number of workers carried out the grooving operation in a brutal manner, which not only damaged the load-bearing structure of the building, but also caused damage to other pipelines in the vicinity.

    Note: Before construction, it is necessary to reconfirm the direction and location of the pipeline with the construction team leader. The load-bearing wall in the house is not allowed to be slotted, and the wall with insulation layer is easy to cause cracking on the surface after slotting, and in the ground slotting, it is necessary to be careful not to damage the floor slab.

    Fourth, the phenomenon of seam modification.

    In some of the joints between the walls and the doors and windows, as well as the docking of two different colors of paint, it is also where the workers often perfunctory.

    Note: When there are two colors of paint on the wall, you must paste the tape on the edge of the first color during the construction, and then paint another color paint on it, so that as long as the tape is torn off after the construction is completed, the whole seam can be very neat.

    Fifth, the phenomenon of substrate treatment.

    Before painting latex paint and paving wall and floor tiles, be sure to do a good job of substrate treatment. Some workers cut corners in this area during construction, which can cause uneven walls, color difference after latex paint is painted, and latex paint will fall off or tiles will not be firmly pasted.

    Note: In the paving construction of wall tiles and guess floor tiles, tiles can not be directly laid on the surface of lime mortar and latex paint, but can only be laid after the base layer is cleaned. When painting latex paint, we must pay attention to whether the wall putty is evenly scraped and smooth, and whether the sanding and roller coating are in place.

    The above is an introduction to the most likely decoration additions.

  7. Anonymous users2024-01-31

    <><What are the additions that you don't pay attention to in the decoration?

    1. The bathroom is waterproof

    The focus of waterproofing is moisture-proof, not only lead-proof, but also water-proof! The bathroom has made a floor up 30 cm, the shower is made a meter eight, and you will be asked if you are next door to the bedroom, do you need to increase the height of the wardrobe waterproof? Raising the money is another one or two malicious additions.

    2. **Do not search for the key to include demolition

    Some decoration companies do not include demolition in the decoration price list, and they may wait until the start of construction to mention to you that they need to demolish and modify the structure, and let the owner add money to the starting price!

    3. Tell the owner that the whole house should be clothed

    Stickers do not need to be pasted in the whole house, load-bearing walls do not need to be pasted, light walls, new walls can be pasted or not, insulation walls, non-load-bearing walls, and plastered walls are recommended to be pasted.

    4. Skirting boards

    Many people don't know why they want to make embedded baseboards, saying that it looks good, so that the furniture can be against the wall I am also very strange, the baseboard is to prevent the furniture from being installed against the wall and abrasive on the wall, which is expensive and impractical.

    5. Beautiful sewing

    The standard of the decoration company is generally the joint, and when the tile is paved, it will tell you that the joint will be moldy and dirty in the later stage, and the beauty of the seam will be charged according to the square meter, which is often not low.

    6. Ground leveling

    The floor tiles in the project do not need to be leveled, and the wooden floor needs to be leveled when the ground is not good. Some decoration companies casually charge ground leveling fees, which is a malicious addition.

Related questions
8 answers2024-02-26

1. Civil engineering transformation: according to the plan, the trunking, the bottom box and the wall are demolished. >>>More

4 answers2024-02-26

Yes. Facial recognition.

Facial recognition is a technology that recognizes people's facial features, including standard recognition and thermal imaging technology. Standard** recognition is to record the shape and relative position of the subject's eyes, nose, mouth and other facial features through an ordinary camera, and then convert them into digital signals, and then use a computer for identification. Facial recognition is a common form of identification that is now widely used in the field of public safety. >>>More

9 answers2024-02-26

The system construction of the Party branch includes the following main contents: >>>More

8 answers2024-02-26

Article 1 of the Regulations on the Administration of Commercial Franchises stipulates that to engage in franchise activities, the franchisor and the franchisee shall enter into a franchise contract in writing. The franchise contract shall include the following main contents: >>>More

8 answers2024-02-26

Hello dear, according to the situation you described, 1, **BOM needs to have a material code, name, specification, quantity, unit, unit price, currency. 2. The BOM of the project needs to have the material code, name, specification, and quantity unit. 3. The production BOM needs to have material code, name, specification, dosage, unit, process level, and production attributes. >>>More