    Safety technical measures plan implementation system.

    In order to prevent the occurrence of work-related injuries and accidents, various technical measures are taken to create good working conditions.

    1.Participate in the preparation, review, approval of safety technical measures of engineering and technical personnel, should be compiled, reviewed, approved by the construction of technical responsibility, according to the division of the project, level by level preparation, level by level for approval, approved by the approval of safety technical measures (together with the construction organization design, construction plan) by the company's technical department reported to the company's technical person in charge of approval, engineering department quality and safety department for the record. The engineering department shall not issue production plans or engineering projects without safety technical measures.

    2.Each project department shall submit the safety technical measures plan for the next year to the company's quality and safety department in November each year, and the company's quality and safety department shall be responsible for summarizing.

    3.Safety technical measures must be prepared according to the characteristics of the project, the construction season and the construction conditions, and should be targeted, which can really play a role in guiding safety protection and ensuring safe production.

    4.Safety technical measures in the construction plan of the division (sub-item) project. The engineering and technical personnel of the contracting project department are responsible for the preparation, the project manager is responsible for the review, the technical person in charge of the company is approved, and the report is submitted to the quality and safety department for the record.

    5.The part of the safety technical measures in the construction plan of the unit project shall be prepared by the company's engineering department, approved by the technical person in charge, approved by the company's manager, and filed by the quality and safety department.

    6.In the technical design of machinery and equipment for self-made large-scale tools (including lifting tools), safety technical measures for production and time must be put forward at the same time. Report to the technical person in charge for approval and the manager for approval.

    7.The cost of safety technical measures shall be reviewed by the company's engineering department in conjunction with the quality and safety department, and the financial department shall be unified and balanced, and shall be included in the plan after the approval of the manager in charge, and the funds shall be handled in accordance with national regulations.

    8.The technical person in charge of safety, the engineering department, and the quality and safety department are responsible for inspection and assessment of safety technical measures. At the same time of inspecting the safety production at the construction site, check the implementation of the safety technical measures of the project, and if it is found that the safety technical measures are not prepared in accordance with this standard or the safety measures are not implemented, economic penalties will be imposed according to the reward and punishment regulations formulated by the company.

  2. Anonymous users2024-02-05

    1. Management system of all weak motor rooms.

    1) The computer room should be dustproof, the room should be clean, work clothes and shoes should be prepared, and shoe covers or anti-static shoes should be worn when entering the room.

    2) The temperature and humidity of the computer room should meet the requirements of maintenance technical indicators, that is: Temperature: 22 26 degrees Celsius Humidity: 40% 60%.

    3) The equipment in the computer room is neat, the ground is clean, the wiring is neat, and there is no debris. The surrounding environment should be clean and hygienic, so that there are no sundries, no garbage, no sewage, and no dead ends.

    4) The computer room should always be kept neat, clean and orderly. The ground is clean, the equipment is dust-free, the arrangement is regular, the wiring is neat, the instrument is accurate, the tools are in place, the information is complete, and everything is orderly.

    5) The lighting in the computer room should be able to meet the maintenance and repair requirements of the equipment, and emergency lighting equipment should be prepared.

    6) The computer room should have anti-rodent measures to detect rodents and eliminate rodents in time.

    7) Six prohibitions should be achieved in the computer room: no smoking, no sleeping, no noise, no chatting, no doing anything unrelated to duty, and irrelevant personnel are not allowed to enter the computer room without approval (those who are approved to enter must fill in the registration book).

    8) Instruments, equipment, tools, and materials should be properly kept by a special person. The use of instruments should strictly abide by the operating regulations, do not dismantle and move, and fill in the use register for the use of precision instruments. Instruments and tools in the computer room shall not be taken out of the computer room by private individuals.

    Accounts should be established for equipment and tools, and procedures should be required for receiving and using them. The replacement of valuable equipment should be carefully inspected and handled carefully.

    9) Personnel entering the computer room should wear work clothes and shoes, and take anti-static measures when plugging and unplugging circuit boards.

    10) All personnel from other units entering the computer room shall be approved by the person in charge of the relevant department, complete the registration procedures, and be accompanied by relevant personnel before entering.

    11) Confidential information such as personnel establishment at all levels, machine line equipment, network organization, circuit openness, etc., as well as other confidential drawings, confidential documents, software versions, technical internal files, and internal information shall not be disclosed to the outside world.

    12) It is strictly forbidden to pull the power supply in the computer room, and other electrical equipment shall not be plugged into the computer power socket.

    13) The equipment in the computer room should have certain shockproof measures.

    14) Fire extinguishing equipment should be positioned and placed, and a special person should be responsible for regular inspection and maintenance, and it should be effective at any time, and everyone will use it. When cleaning all kinds of electrical equipment, the detergent of the corresponding equipment should be used, and the use of gasoline is strictly prohibited.

    Hope it helps.

  3. Anonymous users2024-02-04

    Weak current project management system.

    1. Weak current construction management.

    Weak current engineering construction is a very comprehensive management work, the key lies in its coordination and organization of the role, but also contains other professional management content, its main content is as follows:

    1.Progress management of weak current construction.

    The management of weak current construction schedule determines the organization of construction personnel, the best equipment, and the timing of weak current engineering and civil engineering and decoration projects, which must usually be checked and managed by establishing a project schedule. The establishment of the weak current construction schedule is based on the construction sequence, and the construction sequence mainly includes the following stages, namely, construction and installation drawing design (deepening secondary design), pipeline construction, equipment (purchase) acceptance, equipment installation, commissioning, initial opening and acceptance.

    The work of each stage of weak current construction is as follows:

    1) On-site installation stage.

    1) Civil construction cooperation stage: according to the embedded parts required for each system marked on the civil engineering professional drawing, the construction of floor holes and wall holes should be reserved, and the buried pipe should be carried out according to the plane pipeline laying drawings of each weak current project. (2) Mechanical and electrical equipment installation stage:

    According to the plane pipeline laying diagram of each system, the laying of open lines such as bridges, trunk pipes, and branch trunk pipes is carried out. (3) The weak current construction team shall make technical disclosure of weak current engineering to the mechanical and electrical equipment installation unit of the special civil engineering unit, cooperate with the on-site installation, and negotiate the technical connection with the mechanical and electrical equipment supplier. (4) The civil construction unit provides the water and electricity conditions required for the construction of the weak current construction team, and provides the operation platform for high-level operation.

    5) The mechanical and electrical equipment supplier shall provide the reserved measurement point position and connector specifications of the mechanical and electrical equipment body, provide the principle and wiring method of the components entering the system, provide the principle and communication interface of the intelligent equipment and other technical documents and drawings, and be obliged to carry out technical cooperation. (6) The design unit shall be responsible for the design modification in the process of weak current construction.

    2) Commissioning phase.

    1) Joint debugging of weak current system software before entering the site. (2) Joint debugging of weak current system hardware before entering the field. (3) Control the adjustment of weak current equipment.

    4) Cold adjustment of software and hardware on site of weak current engineering. (5) Debugging of weak current subsystems. (6) The mechanical and electrical equipment installation unit coordinates and cooperates with the on-site commissioning personnel of the subsystem to complete the commissioning work.

    2.Weak current construction interface management.

    The units involved in the construction of weak current mainly include the general contractor of weak current, the subcontractor of weak electronic system, and the weak current construction company, and the coordination with the owner, installation supervision, weak current supervision (supervision), decoration general contractor, construction general contractor and other units in the construction process is also crucial.

    The central content of construction interface management is the division and coordination of weak current system engineering construction, mechanical and electrical equipment installation engineering and decoration engineering construction on its engineering construction content interface, especially the interface interface between the intelligent building management system and mechanical and electrical equipment and independent subsystems.

  4. Anonymous users2024-02-03

    Engineering management is a university question, including several parts: 1. Contract management in accordance with the terms of the contract to collect money on time, according to the contract to issue visas, acceptance, delivery and other procedures. 2. Technical management, as a project management personnel, should be aware of all parts of the project technology, whether each change can be made, how to go without a line, and only when the project is technically mastered can there be a way to continue.

    3. Personnel management, their own workers should manage the quality and quantity of construction according to the requirements, Party A should manage well, do not ask us to do anything, but ask not to find trouble, the general contractor and other cooperative units must communicate and coordinate well, otherwise the work can not be done, and the supplier must control it well, especially to use economic means to cooperate with them in place. 4. The schedule management of the construction period, when to enter the material, when to construct and when to install and debug the equipment, to grasp the rhythm, because the protection of the finished product on site is very important.

    On the whole, weak current engineering management is an empirical science, and no matter how many lectures you listen to, you don't actually go to the construction site to do a project. Generally speaking, weak current project management is to manage money, people, and technology.

Related questions
3 answers2024-02-23

1. EngineeringProject DepartmentJob description: >>>More

5 answers2024-02-23

Haven't heard of it, which way is it used?

6 answers2024-02-23

This is called project subcontracting, and there are many projects on the Internet.

4 answers2024-02-23

1. Business travelers must fill in the "Business Trip Application Form" in advance, indicating the location, reason and funds required for the business trip, and can only go on a business trip after the department head signs the opinion. >>>More

4 answers2024-02-23

The student's student registration file mainly includes the student registration form, the machine-readable card of the basic personal information, the registered major, the course studied, the examination score record form, and the record of the change of student status. >>>More