What is the role of the bill of quantities as an integral part of the bidding documents

Updated on Financial 2024-03-16
13 answers
  1. Anonymous users2024-02-06

    1. The unified basis of bidding; 2. The basis for construction settlement.

  2. Anonymous users2024-02-05

    Didn't understand the problem you said, but on the bill of quantities.

    Or give an explanation.

    The bill of quantities is built on the construction drawings.

    After the preparation is completed, the constituent document of the budget book issued by the budget unit mainly contains all the project content of the project implementation, from individual items, units, and sub-items, and each project will be marked with project characteristics, such as inspection wells.

    The production will indicate that it contains inner powder, safety rope, manhole cover, etc.

    in the tender documents.

    In particular, the bill of quantities must be attached to the back, because only the bill of quantities is provided, the construction unit can have a basis, according to the cost price of the project closure of the difficult enterprise, quote a reasonable price, and then integrate the total cost of the project, that is, the bid price, to carry out the bidding work.

    If you put it professionally: in the bidding stage, the role of the bill of quantities is to be used as the basis for the bidding of potential bidders, and his purpose is three:

    1. Provide a basis for potential bidders.

    Second, let potential bidders and tenderers clarify the content of the project, whether there will be missing items.

    Third, the complex project details, to avoid the enterprise chaos, if lower than the cost price of the enterprise, this is a trouble.

    PS: However, some items are not suitable for changing the bill of quantities, even if the nuclear state Hu compiles the bill of quantities, but due to labor costs, machinery costs, and measure costs.

    Under the influence of factors such as cost software quotas, the bill of quantities is not applicable, and the tenderer will take a fixed price according to the experience and cost of the project, and the bill of quantities is not very needed, directly in the unit project.

    or directly quote the total price of the project.

  3. Anonymous users2024-02-04

    1) Bill of Quantities.

    It is an integral part of the tender documents. The bidding documents generally include the previous schedule, instructions to bidders, general terms of the contract, special terms of the contract, technical specifications, drawings, etcA list of gross quantities, as well as necessary attachments such as various guarantees or guarantees.

    format, etc. These contents can be summarized into two aspects: one is the regulations that the bidder needs to know and abide by in order to bid, and the other is that the bidder votes.

    Required documents. The most important thing in the documents to be provided is the business mark.

    That is, the bill of quantities**, it is a bidding bid.

    The focus of the work.

    2) the association between the bill of quantities and other parts of the bidding documents. The bill of quantities and the various parts of the bidding documents are integrated, inseparable or inseparable, in the bidding documents, the most closely related to the bill of quantities is the scope of the contract project and the contract in the instructions to the bidder.

    with conditions and specific terms, technical specifications and drawings.

  4. Anonymous users2024-02-03

    As an integral part of the bidding documents, the bill of quantities (BOQ) is provided by the project cost consulting agency or the bidding management department of the construction unit.

    The bill of quantities is a budget table that indicates the quantity of each work involved in the project, the unit of measurement of each work, the quantity of work and the corresponding cost. The list details the various building blocks of a construction project, such as materials, engineering facilities and building components, as well as information on their quantities, unit prices and total costs for each project. This provides bidders with an accurate reference and assessment of material costs and other related expenses, as well as determination of their workload and cost.

    In the bidding stage of a project, the bill of quantities is a major reference for the contractor and contractor to formulate the bidding budget. The information and details in the checklist can help contractors and contractors accurately calculate their own costs for bidding projects, and decide whether to submit or not based on their budgets and how to develop the best strategy.

    Therefore, the provider of the bill of quantities needs to have certain professional quality and knowledge and skills, be able to accurately assess the workload and cost of the project, and provide a reasonable reference basis for the tenderer.

  5. Anonymous users2024-02-02

    The bill of quantities is provided by the construction source and the design unit or the design unit, which is a detailed list for construction, including all the work in the construction project and its number of hail quantities, specifications, processes, quality requirements and other details. This list is one of the important bases for quantity accounting, material procurement, cost control, quality inspection and so on in the construction process. In the bidding documents, the bill of quantities is an important basis for the bidder to understand the scope of the project and determine the project cost, which is of great significance to the construction unit, the bidder and the construction unit.

    At the same time, the bill of quantities is also one of the bases for signing the contract between the construction unit and the construction unit, which has an important guiding role in the quality and cost control of the construction unit.

  6. Anonymous users2024-02-01

    As an integral part of the bidding documents, the bill of quantities is generally provided by the tenderer or the tendering agency. These organizations are responsible for the preparation of bills of quantities, quantities and quantities of all materials and services for the project, which are used to assess the bidder's capacity and capacity. The list usually includes all the materials and services of the project, such as construction materials, machinery and equipment, labor costs, supervision costs, taxes and fees, etc.

  7. Anonymous users2024-01-31

    As an integral part of the tender documents, the bill of quantities is mainly provided by the owner. Before the bidding, the owner will compile a list of the quantity of the project according to the dry needs and design drawings of the project, and use it as part of the bidding documents. The bill of quantities includes the quantities and specifications of materials, processes, labor services and other aspects required for the project to be carried out and calculated by the bidder.

  8. Anonymous users2024-01-30

    The bill of quantities is provided by the tenderer or the bidding agency, and the elimination is one of the components of the bidding documents. Its main function is to clarify the specific quantity and content of the project, and provide accurate project information for the bidder, so that the bidder can prepare the bid. At the same time, the bill of quantities is also an important agreement and contract basis between the tenderer and the bidder, which has an important role in guaranteeing the smooth progress of the project construction.

  9. Anonymous users2024-01-29

    1. The bill of quantities is indispensable as an integral part of the bidding documents, and it plays a very important role in the rapid annihilation.

    2. The bill of quantities is provided by the tenderer or the bidding agency entrusted by it, and the detailed and accurate quantity of the project shall be provided.

    3. The provider of the bill of quantities needs to ensure its accuracy and completeness, which is the basis for ensuring that the bidding documents can truly reflect the actual situation of the project.

  10. Anonymous users2024-01-28

    The answer is Yun Rujing] :d

    Answer] D (see textbook p38).

    Analysis] This question examines the pricing and measurement specifications of the engineering quantity clearing and rubber change. The bill of quantities consists of a bill of quantities for sub-items, a list of measure items, a list of other items, a list of fee and a list of tax items.

  11. Anonymous users2024-01-27

    Answer] As an integral part of the bidding Xiaoyan imperial documents, the :d engineering quantity Qiaoyan list is mainly composed of a sub-item bill of quantities, a list of measure items, a list of other projects, a list of fees and a list of value-added tax jujube projects.

  12. Anonymous users2024-01-26

    Answer]: a, c, d

    This question assesses the composition of the bidding bill of quantities. The bidding bill of quantities shall be prepared in units (items) of the project, and the bridge demolition shall be composed of a list of sub-project quantities, a list of measures and items, or a list of other items of the elimination of cars, and a list of fees and taxes.

  13. Anonymous users2024-01-25

    Answer]: b, c, d

    The bidding bill of quantities is the basis of the bill of quantities valuation, should be used as one of the bases for the preparation of the bidding control price, bidding, calculation or adjustment of the quantity of the project, claims, etc., once the contract is signed after winning the bid, the bidding bill of quantities is a part of the agreement. The bidding bill of quantities has a wide function, but in the alternative answer, the investment estimation of A and the feasibility study of project E are both the work of the project investment decision-making stage, and there is no bidding control price at this time, and the bidding control price cannot be compiled, so it is not the role of the bidding bill of quantities, and the correct answer is BCD.

Related questions
11 answers2024-03-16

Hello. The calculation method of foundation pit earthwork is as follows: >>>More

11 answers2024-03-16

General length of straight ribs = length of the component - thickness of the protective layer at both ends + hook + other added value; >>>More

8 answers2024-03-16

Calculated according to the horizontal projection area of the actual tower, without deducting the area occupied by the attached wall columns and columns, the basic floor height shall prevail to the above. Where the ceiling plastering and decoration exceeds the limit, the scaffolding should be counted. >>>More