    Talk about your views on the current application and future development of China's steel structure. Hello dear, steel structure application prospect analysis: from the steel structure material performance, no matter which kind of construction in the construction process needs to support the entire building quality spoon weighing skeleton, which is also known as the building knot system in the building.

    The so-called steel structure building is to use steel as the main material of the gas structure system, and the building built by this structure is a steel structure building. In practice, this concept is applied to large-scale buildings, concrete structures, and brick-concrete buildings. Hope mine is helpful to you, thank you and have a great day!

  2. Anonymous users2024-02-06

    Summary. Pro, steel structure issues include geometry, material properties, riveting, mechanism design, corrosion protection, mold design, anti-static design, etc. Steel structure problems involve many contents, including design, manufacturing, installation and maintenance, specifically, mainly the following aspects:

    1. Selection of steel structure materials: This is a challenge, which needs to take into account the requirements of the economy, mechanical properties and corrosion resistance of the entire structure; 2. Steel structure design: This is also a challenge, which needs to take into account various factors such as structural form, load distribution, component cross-sectional size, connection mode, etc.; 3. Steel structure manufacturing

    The manufacturing requirements of steel structures are strict, and the thickness of materials, dimensional accuracy, and weld forming need to be considered. 4. Steel structure installation: this step involves self-seismic resistance, overall seismic resistance, seismic grading, etc.; 5. Maintenance and repair: This step is related to the safety of the steel structure, which needs to be tested, maintained and repaired.

    The size of the house is about the same size, and the foundation is mud. It is surrounded by a brick wall of slippery fiber 120. Now I want to build a cast-in-place slab about 3 meters high on it, which is used to put a 2-ton water tower...

    The current foundation is definitely not stable, and I want to use wage steel as a cherry tree column, and then make a steel beam. How big of I-beam do you want to use, about how many are you?

    Pro, steel structure issues include geometry, material properties, riveting, mechanism design, corrosion protection, mold design, anti-static design, etc. The steel structure problem involves many contents, including design, manufacturing, installation and maintenance, specifically, there are mainly the following aspects: 1. Selection of steel structure materials

    This is a challenge that needs to take into account the economic, mechanical and corrosion resistance requirements of the entire structure; 2. Steel structure design: This is also a challenge, which needs to take into account various factors such as structural form, load distribution, component section size, connection mode, wheel speed, etc.; 3. Steel structure manufacturing: The steel structure has strict requirements for making and manufacturing, and it is necessary to consider the thickness, dimensional accuracy and weld forming of the material; 4. Steel structure installation:

    This step involves self-seismic resistance, overall seismic resistance, seismic grading, etc.; 5. Maintenance and maintenance: This step is related to the safety of the steel structure, which needs to be inspected, maintained and repaired.

    Dear, according to what should not be overlooked when constructing a steel structure and refer to the following recommended easy guide: Consider using a 6-inch I-beam with about 3 hours of many roots. Vertical struts require at least 8 inches of I-beams, about 4 pieces.

    In order to achieve the 2-tonne load-bearing requirement, it is crucial that the steel frames are installed correctly, and that they can withstand the pressure required for the holes to be struck. If possible, it is advisable to contact a professional steel structure company, they will provide more professional advice on construction.

  3. Anonymous users2024-02-05

    The rapid development of steel structure has a 1951766170 impact on China

    Kiss is a pleasure to answer for you, my answer is <> below

    The impact of the rapid development of steel structure on China is that the development of steel structure industry in production, design, scientific research, supporting and other aspects is also basically perfect. The steel knot fighting hollow structure has green, energy-saving and environmental protection functions, and will become the development trend of China's residential buildings. China's housing construction has gradually become a pillar industry of the national economy.

    1.Greatly save construction time, and the construction is not affected by the season; 2.Increase the usable area of residential space, reduce construction waste and environmental pollution; 3.

    Building materials can be reused, driving the development of other new building materials industries; 4.Good seismic performance, easy to transform, flexible and convenient, bringing comfort to people and so on; 5.High strength, light weight, high safety and affluence of components, reduce the cost of buildings; 6.

    In line with the national sustainable development strategy, low-carbon, green, environmental protection, and energy-saving are key industries supported by the state.

  4. Anonymous users2024-02-04

    How to give full play to the advantages of steel structure and avoid the shortcomings of steel structure.

    1. The advantages and disadvantages are relative, take the steel structure and concrete structure as an early liquid chain! In contrast, the steel structure has good plasticity, tensile resistance, bending and torsion resistance, good seismic performance, and the steel structure can achieve factory production, which greatly reduces the generation of construction waste, in addition, the steel structure installation cycle is shorter, and it is a green building material. 2. The disadvantage is that the overall cost of Lusun will be higher than that of the buried clear soil structure, and the process technology needs to continue to be popularized and developed.

    3. The design mainly depends on the use of process requirements, the use of steel structure plasticity, can achieve large-span structure, can quickly assemble and other advantages, pay attention to aesthetic design in the design, etc., specifically in the actual design to add more experience.

  5. Anonymous users2024-02-03

    3 All of them are mainly in the following aspects:

    Steel structure residential building.

    Large-span workshops.

    Construction of light steel keel analysis frames.

    In the development of villas, in low-rise and multi-storey residences, light steel structures such as cold-formed C-shaped steel or small hot-rolled steel can be used to form a keel structure system; High-rise buildings can be composed of hot-rolled H-type, welded H-type, welded box-type, cold-formed thin-walled square steel pipe filled concrete, round steel pipe filled concrete, etc.

    Data Development:

    Advantages of steel house. The light steel house is very safe and earthquake-resistant to 9 degrees. It can be typhoon-proof 12 and the roof is load-bearing with snow meters, this is because the steel keel is lightweight, strong, high-quality building material, and has good ductility and toughness.

    The construction speed of light steel houses is very fast, and the construction period of a 200 house is within 1 month. This is because the parts of the light steel house are produced in the factory, and after being transported to the site, they can be directly assembled by the workers, so the time is very short.

    The production of light steel houses has a high degree of industrialization and mechanization, and a high degree of commercialization. The main materials required for building a house are produced in the factory, and the raw materials are processed by machinery and equipment, which has high efficiency, low cost and good quality. Most of these equipment have introduced foreign advanced technology, and many large enterprises' new housing products have international quality.

    80% of the materials of light steel houses can be reused. From the point of view of the main material, the steel will not grow insects or become rotten wood with the passage of time, and it can be reused after several years of demolition, which is very environmentally friendly and economical.

  6. Anonymous users2024-02-02

    With the development of the economy, there are more and more steel structures. Especially for the plant with a more human span, the steel structure has the characteristics of less construction period, repeated use and good economic benefits than the concrete plant. The new steel is a new type of steel structure system, only with a high degree of standardization, flexible air arrangement, good seismic performance, industrialized production, short construction period, environmental protection and energy saving, etc., it has been widely used in North America and other places in the past 20 years, but it is mainly used in low-rise residences.

    And in China, in order to extend the application scope of new steel structures to multi-storey residential buildings.

    Steel structure building is a new type of building system, open up the real estate industry, construction industry, metallurgical industry between the industry boundary, set into a new industrial system, this is the industry is generally optimistic about the steel structure building system.

    Compared with the traditional concrete building, the steel structure building replaces the reinforced concrete with steel plate or section steel, which has higher strength and better seismic resistance. And because the components can be made in factories and installed on site, the construction period is greatly reduced. Due to the reuse of steel, it can greatly reduce construction waste and be more environmentally friendly, so it is widely used by countries around the world and used in industrial buildings and civil buildings.

  7. Anonymous users2024-02-01

    This can have, I feel that it should be an integrated kind of assembly, for example, the first few days said that 19 days to build a building, I feel that it is a trend, this should be structural, finished maintenance I feel that aluminum plate and the like can be used, but it cannot be regarded as an alternative material, I feel that steel structure should also have trade fairs and other expositions This can promote the industry.

  8. Anonymous users2024-01-31

    In the application process of steel structure engineering, what are the ways to overcome its shortcomings.

    In the process of steel structure engineering application, what are the ways to overcome its shortcomings? Hello, happy to answer your <>

    The main methods of reinforcement of steel-friendly structures are: reducing the load, changing the structural calculation graphics, increasing the cross-section and connection strength of the original structural components, preventing the expansion of cracks, etc., and other reinforcement methods can also be used when there is mature experience. 1. Change the structural calculation graph

    The reinforcement method of changing the calculation figure of the structure refers to the method of reinforcing the structure by changing the load distribution, force transmission path, joint properties and boundary conditions, adding additional members and supports, applying prestress, and considering the spatial coordination and balance work. 1.Before hoisting, without inspecting the components and correcting the deformation and fiber, they were blindly hoisted: 2

    For transverse components such as tailstock and beam with long span or length, the position of the lifting point of the center of gravity is selected improperly when hoisting, and under the influence of the self-weight pressure of the component and the hoisting force, the component is unstable, resulting in bending moment, camber and deformation, and affecting the size of the steel structure installation; 3.Before the component is hoisted, it is not reinforced according to the requirements of the structural characteristics of the component; 4.When the component is vertically hoisted in place, it is found that the position is inconsistent, and the correct treatment measures are not taken, and the forced installation is carried out, so that the installed component does not meet the provisions of the design and specification.

    Extended material: I hope mine can help you <>

    Do you have any other questions?

  9. Anonymous users2024-01-30

    For the wall thickness series of standard tubes, SCH10S is stainless steel, and SCH10 corresponds to carbon steel. , so the s at the back represent stainless steel.

    500mm is the length, and SCH10S is the wall thickness classification, which is based on the pipe table number"sch"Indicates the wall thickness.

    The pipe table number is the ratio of the design pressure of the pipe to the allowable stress of the material at the design temperature multiplied by 1000 and rounded.

    i.e.: sch p [ ]t 1000

    ANSI wall thickness grades: SCH10, SCH20, SCH30, SCH40, SCH60, SCH80, SCH100, SCH120, SCH140, SCH160.

    ANSI wall thickness grades: SCH5S, SCH10S, SCH40S, and SCH80S.

    Of course, it's the manufacturing process of steel pipes, and you go to buy it, and he only tells you, and I use submerged arc welding.

    Serial No. Steel Pipe Category Nominal Diameter Range Wall Thickness Classification.

    1 Austenitic stainless steel seamless steel pipe 10 400 sch5s, sch10s, sch20s, sch40s, sch80s

    2 Carbon steel, alloy steel seamless steel pipe 10 600 sch20, sch30, sch40, sch60, sch80, sch100, sch120, sch140, sch160, xxs

    3 austenitic stainless steel welded steel pipe 80 1000

    4 Carbon steel, alloy steel welded steel pipe 150 2000

    WN is [butt weld flange with neck].

    SO is [flat welded flange with neck].

    BL is a [flange cover] also called a "blind plate".

    th is [threaded neck flange].

    LJ is [loose flange] this type of "loose flange" no longer exists in the new standard in 2009, and is modified to [LF SE butt weld ring loose flange].

    SW is [socket weld flange].

    Full plane FF, protruding surface RF, convex surface M, concave surface F, tenon surface T, groove surface G, ring connection surface RJ General concave and convex surface MF, tenon and groove surface TG, ring connection surface RJ

    180° small elbow. BW elbow.

Related questions
8 answers2024-03-21

Compared with traditional concrete, steel has the characteristics of high strength, high toughness and good ductility, which will bring significant advantages of steel structure buildings in the fields of structural performance, economic performance and environmental performance. In particular, the advantages of environmental protection coincide with the idea of advocating building energy conservation and environmental protection in China. GF believes that with the strong support of policies, the demand for residential steel structures in the construction of green buildings and affordable housing is growing, and the residential steel structure industry is at the point of accumulation. >>>More

11 answers2024-03-21

Command and lead the on-site installation and on-site management of the steel structure part of the steel engineering project; >>>More

4 answers2024-03-21

Whether the fireproof coating can be passed is very simple to spend some money on the relationship between fire protection and everything.

7 answers2024-03-21

The steel structure should be used for the performance of the material >>>More